blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3635837

EP3635837 - METHOD FOR OPERATING A WIND FARM [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  03.04.2021
Database last updated on 24.08.2024
FormerRequest for examination was made
Status updated on  13.03.2020
FormerThe international publication has been made
Status updated on  15.12.2018
Formerunknown
Status updated on  22.06.2018
Most recent event   Tooltip02.07.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Wobben Properties GmbH
Borsigstrasse 26
26607 Aurich / DE
[2020/16]
Inventor(s)01 / BROMBACH, Johannes
Roedernallee 70
13437 Berlin / DE
02 / MACKENSEN, Ingo
Gornerstrasse 5c
26607 Aurich / DE
03 / BUSKER, Kai
Steuermannsweg 15
26629 Gro efehn / DE
 [2020/16]
Representative(s)Eisenführ Speiser
Patentanwälte Rechtsanwälte PartGmbB
Postfach 10 60 78
28060 Bremen / DE
[2020/16]
Application number, filing date18729955.707.06.2018
[2020/16]
WO2018EP65031
Priority number, dateDE20171011249107.06.2017         Original published format: DE102017112491
[2020/16]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018224596
Date:13.12.2018
Language:DE
[2018/50]
Type: A1 Application with search report 
No.:EP3635837
Date:15.04.2020
Language:DE
The application published by WIPO in one of the EPO official languages on 13.12.2018 takes the place of the publication of the European patent application.
[2020/16]
Search report(s)International search report - published on:EP13.12.2018
ClassificationIPC:H02J3/38, H02M5/451, H02J3/48, H02J3/50, H02J3/36, H02M1/00
[2020/16]
CPC:
H02J3/381 (EP,KR,US); F03D9/00 (RU); F03D9/257 (US);
H02J3/36 (EP,KR,US); H02J3/38 (RU); H02J3/46 (EP,US);
H02J3/48 (EP,KR,US); H02J3/50 (EP,KR,US); H02J2300/28 (EP,KR,US);
Y02E10/72 (EP); Y02E10/76 (EP); Y02E60/60 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/16]
TitleGerman:VERFAHREN ZUM BETREIBEN EINES WINDPARKS[2020/16]
English:METHOD FOR OPERATING A WIND FARM[2020/16]
French:PROCÉDÉ DE FONCTIONNEMENT D'UN PARC ÉOLIEN[2020/16]
Entry into regional phase07.01.2020National basic fee paid 
07.01.2020Designation fee(s) paid 
07.01.2020Examination fee paid 
Examination procedure07.01.2020Examination requested  [2020/16]
07.01.2020Date on which the examining division has become responsible
21.07.2020Amendment by applicant (claims and/or description)
06.04.2021Despatch of a communication from the examining division (Time limit: M04)
16.08.2021Reply to a communication from the examining division
23.05.2022Despatch of a communication from the examining division (Time limit: M06)
02.12.2022Reply to a communication from the examining division
Fees paidRenewal fee
30.06.2020Renewal fee patent year 03
30.06.2021Renewal fee patent year 04
30.06.2022Renewal fee patent year 05
30.06.2023Renewal fee patent year 06
01.07.2024Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]US2014204633  (KHAJEHODDIN SAYED ALI [CA], et al) [X] 1,7,12,15-17,20 * abstract ** paragraphs [0052] - [0003] - [0 24] , [0 50] - [0076] *;
 [I]  - WANG SHIKE ET AL, "Modeling and analysis of droop based hybrid control strategy for parallel inverters in islanded microgrids", 2017 IEEE APPLIED POWER ELECTRONICS CONFERENCE AND EXPOSITION (APEC), IEEE, (20170326), doi:10.1109/APEC.2017.7931194, pages 3462 - 3469, XP033098752 [I] 1-5,7-20 * the whole document *

DOI:   http://dx.doi.org/10.1109/APEC.2017.7931194
 [A]  - NAGARAJU POGAKU ET AL, "Modeling, Analysis and Testing of Autonomous Operation of an Inverter-Based Microgrid", IEEE TRANSACTIONS ON POWER ELECTRONICS, INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS, USA, (20070301), vol. 22, no. 2, doi:10.1109/TPEL.2006.890003, ISSN 0885-8993, pages 613 - 625, XP011172381 [A] 1,12,17 * the whole document *

DOI:   http://dx.doi.org/10.1109/TPEL.2006.890003
by applicantDE102006050077
 DE102013207264
 DE102014214151
    - JAHRESBERICHT, Technischen Universität Braunschweig, Institut für Hochspannungstechnik, (20160000), pages 54 - 56
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.