EP3643127 - SCHEDULING RECEPTION OF WIRELESS SIGNALS USING RECEIVE BEAMFORMING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.07.2022 Database last updated on 21.12.2024 | |
Former | The patent has been granted Status updated on 23.07.2021 | ||
Former | Grant of patent is intended Status updated on 12.04.2021 | ||
Former | Request for examination was made Status updated on 27.03.2020 | ||
Former | The international publication has been made Status updated on 31.12.2018 | ||
Former | unknown Status updated on 25.06.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Koninklijke KPN N.V. Wilhelminakade 123 3072 AP Rotterdam / NL | For all designated states Nederlandse Organisatie voor toegepast- natuurwetenschappelijk onderzoek TNO Anna van Buerenplein 1 2595 DA 's-Gravenhage / NL | [2020/18] | Inventor(s) | 01 /
JORGUSESKI, Ljupco Jozef Israellaan 234 2282 TR Rijswijk / NL | 02 /
LITJENS, Remco Van Kempenstraat 22 2352 VH Voorschoten / NL | 03 /
TRICHIAS, Konstantinos Pindou 111 Mochato 18345 Athens / GR | [2020/18] | Representative(s) | Wuyts, Koenraad Maria Koninklijke KPN N.V. Intellectual Property Group P.O. Box 25110 3001 HC Rotterdam / NL | [2020/18] | Application number, filing date | 18730832.5 | 21.06.2018 | [2020/18] | WO2018EP66650 | Priority number, date | EP20170177323 | 22.06.2017 Original published format: EP 17177323 | [2020/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2018234495 | Date: | 27.12.2018 | Language: | EN | [2018/52] | Type: | A2 Application without search report | No.: | EP3643127 | Date: | 29.04.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 27.12.2018 takes the place of the publication of the European patent application. | [2020/18] | Type: | B1 Patent specification | No.: | EP3643127 | Date: | 25.08.2021 | Language: | EN | [2021/34] | Search report(s) | International search report - published on: | EP | 07.02.2019 | Classification | IPC: | H04W72/04, H04B7/08, H04W16/28 | [2020/18] | CPC: |
H04W72/0446 (EP,US);
H04B7/086 (EP,US);
H04W72/12 (US);
H04W16/28 (EP);
H04W72/23 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/18] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | PLANUNG DES EMPFANGS EINES DRAHTLOSEN SIGNALS MITTELS EMPFANGSSTRAHLFORMUNG | [2021/18] | English: | SCHEDULING RECEPTION OF WIRELESS SIGNALS USING RECEIVE BEAMFORMING | [2020/18] | French: | ORDONNANCEMENT DE LA RÉCEPTION DE SIGNAUX SANS FIL UTILISANT UNE FORMATION DE FAISCEAU DE RÉCEPTION | [2021/18] |
Former [2020/18] | ZEITPLANUNG DES EMPFANGS VON DRAHTLOSSIGNALEN MITTELS EMPFANGSSTRAHLFORMUNG | ||
Former [2020/18] | PROGRAMMATION DE RÉCEPTION DE SIGNAUX SANS FIL À L'AIDE D'UNE FORMATION DE FAISCEAU DE RÉCEPTION | Entry into regional phase | 22.01.2020 | National basic fee paid | 22.01.2020 | Designation fee(s) paid | 22.01.2020 | Examination fee paid | Examination procedure | 22.01.2020 | Examination requested [2020/18] | 22.01.2020 | Date on which the examining division has become responsible | 02.09.2020 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 12.11.2020 | Amendment by applicant (claims and/or description) | 13.04.2021 | Communication of intention to grant the patent | 15.07.2021 | Fee for grant paid | 15.07.2021 | Fee for publishing/printing paid | 15.07.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21189265.8 / EP3937572 | Opposition(s) | 27.05.2022 | No opposition filed within time limit [2022/31] | Request for further processing for: | 12.11.2020 | Request for further processing filed | 12.11.2020 | Full payment received (date of receipt of payment) Request granted | 23.11.2020 | Decision despatched | Fees paid | Renewal fee | 30.06.2020 | Renewal fee patent year 03 | 30.06.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.06.2018 | AL | 25.08.2021 | AT | 25.08.2021 | CY | 25.08.2021 | CZ | 25.08.2021 | DK | 25.08.2021 | EE | 25.08.2021 | ES | 25.08.2021 | FI | 25.08.2021 | HR | 25.08.2021 | IT | 25.08.2021 | LT | 25.08.2021 | LV | 25.08.2021 | MC | 25.08.2021 | MK | 25.08.2021 | MT | 25.08.2021 | PL | 25.08.2021 | RO | 25.08.2021 | RS | 25.08.2021 | SE | 25.08.2021 | SI | 25.08.2021 | SK | 25.08.2021 | SM | 25.08.2021 | TR | 25.08.2021 | BG | 25.11.2021 | NO | 25.11.2021 | GR | 26.11.2021 | IS | 25.12.2021 | PT | 27.12.2021 | [2024/44] |
Former [2024/29] | HU | 21.06.2018 | |
AL | 25.08.2021 | ||
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
MK | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
TR | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2024/24] | HU | 21.06.2018 | |
AL | 25.08.2021 | ||
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
MK | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2024/23] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
MK | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2024/20] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2023/08] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/36] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/29] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/25] | AT | 25.08.2021 | |
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/24] | AT | 25.08.2021 | |
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/21] | AT | 25.08.2021 | |
DK | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
PL | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/10] | AT | 25.08.2021 | |
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
PL | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/09] | AT | 25.08.2021 | |
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
LT | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
PT | 27.12.2021 | ||
Former [2022/08] | AT | 25.08.2021 | |
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
LT | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
Former [2022/07] | AT | 25.08.2021 | |
LT | 25.08.2021 | ||
NO | 25.11.2021 | Cited in | International search | [XI]EP1202587 (TOSHIBA KK [JP]) [X] 1,3,4,6,7,9,10,13,15 * paragraphs [0019] , [0 30] , [0 37] , [0 58] * [I] 2,5,8; | [A]WO2004088794 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [A] 1-10,13,15 * page 2, line 13 - page 4, line 4 *; | [A]EP2372940 (ALCATEL LUCENT [FR]) [A] 1-10,13,15 * paragraphs [0012] , [0 13] , [0 14] , [0 29] , [0030] *; | [A]US2016174244 (KIM IL GYU [KR], et al) [A] 1-10,13,15 * paragraphs [0058] - [0062] *; | [X] - CHENG LI ET AL, "A Cluster Based On-demand Multi-Channel MAC Protocol for Wireless Multimedia Sensor Networks", IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS, 2008 : ICC '08 ; 19 - 23 MAY 2008, BEIJING, CHINA, IEEE, PISCATAWAY, NJ, USA, (20080519), ISBN 978-1-4244-2075-9, pages 2371 - 2376, XP031265772 [X] 11,12,14,15 * paragraphs [000I] , [ III] * | by applicant | US2016049823 |