EP3625819 - HYBRID BONDING METHOD FOR SEMICONDUCTOR WAFERS AND RELATED THREE-DIMENSIONAL INTEGRATED DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.05.2022 Database last updated on 17.07.2024 | |
Former | The patent has been granted Status updated on 28.05.2021 | ||
Former | Grant of patent is intended Status updated on 14.01.2021 | ||
Former | Request for examination was made Status updated on 21.02.2020 | ||
Former | The international publication has been made Status updated on 23.11.2018 | ||
Former | unknown Status updated on 25.06.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states LFoundry S.r.l. Via Pacinotti, 7 67051 Avezzano (AQ) / IT | [2020/13] | Inventor(s) | 01 /
DE AMICIS, Giovanni Via Avezzano 3 67100 L'Aquila (AQ) / IT | 02 /
DEL MONTE, Andrea Via Rumenia 97 00071 Pomezia (RM) / IT | 03 /
DI COLA, Onorato Via Della Chiusa 2 67010 Barete (AQ) / IT | [2020/13] | Representative(s) | Barbaro, Gaetano, et al Società Italiana Brevetti S.p.A. Via G. Carducci, 8 20123 Milano / IT | [2020/13] | Application number, filing date | 18730856.4 | 17.05.2018 | [2020/13] | WO2018IB53472 | Priority number, date | IT20170053902 | 18.05.2017 Original published format: IT201700053902 | [2020/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018211447 | Date: | 22.11.2018 | Language: | EN | [2018/47] | Type: | A1 Application with search report | No.: | EP3625819 | Date: | 25.03.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.11.2018 takes the place of the publication of the European patent application. | [2020/13] | Type: | B1 Patent specification | No.: | EP3625819 | Date: | 30.06.2021 | Language: | EN | [2021/26] | Search report(s) | International search report - published on: | EP | 22.11.2018 | Classification | IPC: | H01L21/18, H01L27/06, H01L23/00, H01L25/00, H01L27/146, H01L25/16 | [2021/03] | CPC: |
H01L21/187 (EP,US);
H01L27/1469 (US);
H01L24/05 (EP);
H01L24/08 (EP,US);
H01L24/80 (EP,US);
H01L24/94 (EP);
H01L25/0657 (US);
H01L25/167 (EP);
H01L25/50 (EP,US);
H01L27/14632 (EP);
H01L27/14634 (US);
H01L2224/08145 (EP,US);
H01L2224/80011 (US);
H01L2224/80895 (EP,US);
H01L2224/80896 (EP,US);
H01L2924/14 (EP)
(-)
| C-Set: |
H01L2924/14, H01L2924/00012 (EP)
|
Former IPC [2020/13] | H01L21/18, H01L23/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | HYBRIDES BONDING VERFAHREN FÜR HALBLEITERWAFER UND ZUGEHÖRIGE DREIDIMENSIONALE INTEGRIERTE VORRICHTUNG | [2021/03] | English: | HYBRID BONDING METHOD FOR SEMICONDUCTOR WAFERS AND RELATED THREE-DIMENSIONAL INTEGRATED DEVICE | [2020/13] | French: | PROCÉDÉ DE COLLAGE HYBRIDE POUR TRANCHES DE SEMI-CONDUCTEUR ET DISPOSITIF INTÉGRÉ TRIDIMENSIONNEL ASSOCIÉ | [2020/13] |
Former [2020/13] | HYBRIDES VERKLEBUNGSVERFAHREN FÜR HALBLEITERWAFER UND ZUGEHÖRIGE DREIDIMENSIONALE INTEGRIERTE VORRICHTUNG | Entry into regional phase | 06.12.2019 | National basic fee paid | 06.12.2019 | Designation fee(s) paid | 06.12.2019 | Examination fee paid | Examination procedure | 15.03.2019 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 06.12.2019 | Examination requested [2020/13] | 06.12.2019 | Date on which the examining division has become responsible | 15.01.2021 | Communication of intention to grant the patent | 12.05.2021 | Fee for grant paid | 12.05.2021 | Fee for publishing/printing paid | 12.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.03.2022 | No opposition filed within time limit [2022/23] | Fees paid | Renewal fee | 11.03.2020 | Renewal fee patent year 03 | 20.05.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.05.2018 | AL | 30.06.2021 | AT | 30.06.2021 | CY | 30.06.2021 | CZ | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | ES | 30.06.2021 | FI | 30.06.2021 | HR | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | MK | 30.06.2021 | NL | 30.06.2021 | PL | 30.06.2021 | RO | 30.06.2021 | RS | 30.06.2021 | SE | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | SM | 30.06.2021 | TR | 30.06.2021 | BG | 30.09.2021 | NO | 30.09.2021 | GR | 01.10.2021 | IS | 30.10.2021 | PT | 02.11.2021 | [2024/29] |
Former [2024/24] | HU | 17.05.2018 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2024/23] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2024/20] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2023/19] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2023/06] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/29] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/26] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/21] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/11] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/09] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/08] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2022/07] | AT | 30.06.2021 | |
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/51] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/49] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/46] | FI | 30.06.2021 | |
BG | 30.09.2021 | Cited in | International search | [A]US2015021785 (LIN JING-CHENG [TW]) [A] 8-10* figure 1D *; | [I]US2016190103 (KABE TATSUYA [JP], et al) [I] 1-10 * paragraph [0066] - paragraph [0080]; figures 2A-2F * | by applicant | US2002074670 | US2007207592 | US2015021785 | US2015294963 | US2016190103 | US2017062366 | - FRANK NIKLAUS et al., "Adhesive Wafer Bonding Using Partially Cured Benzocyclobutene for Three-Dimensional Integration", J. Electrochem. Soc., (20060000), vol. 153, no. 4, pages G291 - G295 |