blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3590219

EP3590219 - BANDWIDTH PART CONFIGURATION AND OPERATION FOR NEW RADIO (NR) WIDEBAND USER EQUIPMENT (UE) [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.06.2023
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  01.07.2022
FormerGrant of patent is intended
Status updated on  03.04.2022
FormerExamination is in progress
Status updated on  22.02.2022
FormerGrant of patent is intended
Status updated on  07.10.2021
FormerExamination is in progress
Status updated on  16.04.2021
FormerRequest for examination was made
Status updated on  06.12.2019
FormerThe international publication has been made
Status updated on  09.11.2018
Formerunknown
Status updated on  29.06.2018
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
Apple Inc.
One Apple Park Way
Cupertino, CA 95014 / US
[2020/52]
Former [2020/02]For all designated states
Intel IP Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
Inventor(s)01 / JEON, Jeongho
6813 Bluffwood Court
San Jose, CA 95120 / US
02 / CHO, Joonyoung
13321 NW Lombardy Drive
Portland, OR 97229 / US
03 / KWON, Hwan-Joon
1883 Agnew Road 465
Santa Clara, CA 95054 / US
 [2020/02]
Representative(s)Lang, Johannes, et al
Bardehle Pagenberg Partnerschaft mbB
Patentanwälte, Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
[2022/31]
Former [2020/02]HGF Limited
Fountain Precinct
Balm Green
Sheffield S1 2JA / GB
Application number, filing date18731927.204.05.2018
[2020/02]
WO2018US31251
Priority number, dateUS201762502512P05.05.2017         Original published format: US 201762502512 P
US201762521108P16.06.2017         Original published format: US 201762521108 P
[2020/02]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018204884
Date:08.11.2018
Language:EN
[2018/45]
Type: A1 Application with search report 
No.:EP3590219
Date:08.01.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 08.11.2018 takes the place of the publication of the European patent application.
[2020/02]
Type: B1 Patent specification 
No.:EP3590219
Date:03.08.2022
Language:EN
[2022/31]
Search report(s)International search report - published on:EP08.11.2018
ClassificationIPC:H04L5/00
[2020/02]
CPC:
H04L5/001 (EP,CN); H04W76/27 (US); H04L27/2605 (US);
H04L49/25 (US); H04L5/0044 (EP,CN); H04L5/0053 (EP,CN);
H04L5/0091 (EP,CN); H04W72/23 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/02]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:BANDBREITENTEILKONFIGURATION UND BETRIEB FÜR NEW RADIO (NR)-BREITBANDBENUTZERGERÄTE[2020/02]
English:BANDWIDTH PART CONFIGURATION AND OPERATION FOR NEW RADIO (NR) WIDEBAND USER EQUIPMENT (UE)[2020/02]
French:CONFIGURATION ET FONCTIONNEMENT DE PARTIE DE LARGEUR DE BANDE POUR UN ÉQUIPEMENT UTILISATEUR (UE) À LARGE BANDE DE NOUVELLE RADIO (NR)[2020/02]
Entry into regional phase04.10.2019National basic fee paid 
04.10.2019Designation fee(s) paid 
04.10.2019Examination fee paid 
Examination procedure04.10.2019Amendment by applicant (claims and/or description)
04.10.2019Examination requested  [2020/02]
04.10.2019Date on which the examining division has become responsible
20.04.2021Despatch of a communication from the examining division (Time limit: M04)
30.07.2021Reply to a communication from the examining division
08.10.2021Communication of intention to grant the patent
18.02.2022Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
04.04.2022Communication of intention to grant the patent
22.06.2022Fee for grant paid
22.06.2022Fee for publishing/printing paid
22.06.2022Receipt of the translation of the claim(s)
Divisional application(s)EP22165785.1  / EP4040712
EP23195146.8  / EP4300868
Opposition(s)04.05.2023No opposition filed within time limit [2023/28]
Fees paidRenewal fee
31.03.2020Renewal fee patent year 03
13.05.2021Renewal fee patent year 04
16.03.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
IT03.08.2022
LT03.08.2022
LV03.08.2022
MC03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
[2024/26]
Former [2024/08]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
MC03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/37]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/29]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/23]AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/22]AT03.08.2022
CZ03.08.2022
DK03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/21]DK03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/20]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/12]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/11]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
GR04.11.2022
PT05.12.2022
Former [2023/10]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
GR04.11.2022
PT05.12.2022
Former [2023/09]ES03.08.2022
FI03.08.2022
LT03.08.2022
LV03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
PT05.12.2022
Former [2023/08]ES03.08.2022
FI03.08.2022
LT03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
Cited inInternational search[I]  - HUAWEI ET AL, "Resource allocation and indication for data channel", vol. RAN WG1, no. Spokane, USA; 20170403 - 20170407, (20170402), 3GPP DRAFT; R1-1705069, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170402), XP051243200 [I] 1-8 * Sections 1-2;; figures 1-5 *
 [A]  - SAMSUNG, "RAN2 impacts from bandwidth part in NR", vol. RAN WG2, no. Hangzhou, China; 20170515 - 20170519, (20170504), 3GPP DRAFT; R2-1704503 RAN2 IMPACTS FROM BANDWIDTH PART IN NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_98/Docs/, (20170504), XP051263606 [A] 1-8 * Section 2;; figures 1-2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.