EP3642872 - FLEXIBLE ELECTRONIC ASSEMBLY WITH SEMICONDUCTOR DIE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.06.2023 Database last updated on 12.11.2024 | |
Former | The patent has been granted Status updated on 15.07.2022 | ||
Former | Grant of patent is intended Status updated on 12.04.2022 | ||
Former | Examination is in progress Status updated on 12.02.2021 | ||
Former | Request for examination was made Status updated on 27.03.2020 | ||
Former | The international publication has been made Status updated on 31.12.2018 | ||
Former | unknown Status updated on 29.06.2018 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Microsoft Technology Licensing, LLC One Microsoft Way Redmond, WA 98052-6399 / US | [2021/45] |
Former [2020/18] | For all designated states Microsoft Technology Licensing LLC One Microsoft Way Redmond, Washington 98052-6399 / US | Inventor(s) | 01 /
HOLBERY, James David MICROSOFT TECHNOLOGY LICENSING LLC One Microsoft Way Redmond, Washington 98052-6399 / US | 02 /
MA, Siyuan MICROSOFT TECHNOLOGY LICENSING LLC One Microsoft Way Redmond, Washington 98052-6399 / US | 03 /
SULLIVAN, Benjamin MICROSOFT TECHNOLOGY LICENSING LLC One Microsoft Way Redmond, Washington 98052-6399 / US | [2020/18] | Representative(s) | CMS Cameron McKenna Nabarro Olswang LLP Cannon Place 78 Cannon Street London EC4N 6AF / GB | [2020/18] | Application number, filing date | 18731943.9 | 24.05.2018 | [2020/18] | WO2018US34247 | Priority number, date | US201715627215 | 19.06.2017 Original published format: US201715627215 | [2020/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018236532 | Date: | 27.12.2018 | Language: | EN | [2018/52] | Type: | A1 Application with search report | No.: | EP3642872 | Date: | 29.04.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 27.12.2018 takes the place of the publication of the European patent application. | [2020/18] | Type: | B1 Patent specification | No.: | EP3642872 | Date: | 17.08.2022 | Language: | EN | [2022/33] | Search report(s) | International search report - published on: | EP | 27.12.2018 | Classification | IPC: | H01L25/075, H05K1/03, H05K1/18, H01L33/62, H01L33/20 | [2020/18] | CPC: |
H01L33/62 (EP,US);
H01L33/483 (US);
H01L25/0753 (EP,US);
H01L33/0095 (US);
H01L33/505 (US);
H05K3/284 (EP,US);
H01L2933/005 (EP,US);
H01L2933/0066 (EP,US);
H01L33/20 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/18] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | FLEXIBLE ELEKTRONISCHE ANORDNUNG MIT HALBLEITERCHIP | [2020/18] | English: | FLEXIBLE ELECTRONIC ASSEMBLY WITH SEMICONDUCTOR DIE | [2020/18] | French: | ENSEMBLE ÉLECTRONIQUE FLEXIBLE AVEC PUCE SEMI-CONDUCTRICE | [2020/18] | Entry into regional phase | 13.11.2019 | National basic fee paid | 13.11.2019 | Designation fee(s) paid | 13.11.2019 | Examination fee paid | Examination procedure | 13.11.2019 | Examination requested [2020/18] | 13.11.2019 | Date on which the examining division has become responsible | 04.03.2020 | Amendment by applicant (claims and/or description) | 16.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 11.06.2021 | Reply to a communication from the examining division | 13.04.2022 | Communication of intention to grant the patent | 11.07.2022 | Fee for grant paid | 11.07.2022 | Fee for publishing/printing paid | 11.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 19.05.2023 | No opposition filed within time limit [2023/30] | Fees paid | Renewal fee | 31.03.2020 | Renewal fee patent year 03 | 13.05.2021 | Renewal fee patent year 04 | 16.03.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 17.08.2022 | AT | 17.08.2022 | CZ | 17.08.2022 | DK | 17.08.2022 | EE | 17.08.2022 | ES | 17.08.2022 | FI | 17.08.2022 | HR | 17.08.2022 | IT | 17.08.2022 | LT | 17.08.2022 | LV | 17.08.2022 | MC | 17.08.2022 | NL | 17.08.2022 | PL | 17.08.2022 | RO | 17.08.2022 | RS | 17.08.2022 | SE | 17.08.2022 | SI | 17.08.2022 | SK | 17.08.2022 | SM | 17.08.2022 | NO | 17.11.2022 | GR | 18.11.2022 | IS | 17.12.2022 | PT | 19.12.2022 | [2024/26] |
Former [2024/08] | AL | 17.08.2022 | |
AT | 17.08.2022 | ||
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
ES | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
MC | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
SI | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/37] | AL | 17.08.2022 | |
AT | 17.08.2022 | ||
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
ES | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
SI | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/29] | AL | 17.08.2022 | |
AT | 17.08.2022 | ||
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
ES | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/23] | AT | 17.08.2022 | |
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
EE | 17.08.2022 | ||
ES | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
SK | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/22] | AT | 17.08.2022 | |
CZ | 17.08.2022 | ||
DK | 17.08.2022 | ||
ES | 17.08.2022 | ||
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RO | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/21] | DK | 17.08.2022 | |
FI | 17.08.2022 | ||
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/20] | FI | 17.08.2022 | |
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
SM | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/12] | FI | 17.08.2022 | |
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
IS | 17.12.2022 | ||
PT | 19.12.2022 | ||
Former [2023/11] | FI | 17.08.2022 | |
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
PL | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
PT | 19.12.2022 | ||
Former [2023/10] | FI | 17.08.2022 | |
HR | 17.08.2022 | ||
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
NO | 17.11.2022 | ||
GR | 18.11.2022 | ||
PT | 19.12.2022 | ||
Former [2023/09] | FI | 17.08.2022 | |
LT | 17.08.2022 | ||
LV | 17.08.2022 | ||
NL | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
NO | 17.11.2022 | ||
PT | 19.12.2022 | ||
Former [2023/08] | FI | 17.08.2022 | |
LT | 17.08.2022 | ||
NL | 17.08.2022 | ||
RS | 17.08.2022 | ||
SE | 17.08.2022 | ||
NO | 17.11.2022 | Cited in | International search | [Y]US6045575 (ROSEN DANIELLE [US], et al) [Y] 5,6,14 * column 4, paragraphs 29-38; figure - *; | [Y]US2003194831 (NG KEE YEAN [MY], et al) [Y] 13-15* paragraph [0057]; claim - *; | [Y]US2010065873 (BHATTACHARYA RABIN [NL], et al) [Y] 1-15 * paragraphs [0037] - [0084]; figure 1 *; | [Y]US2013027963 (VAN HERPEN MAARTEN MARINUS JOHANNES WILHELMUS [NL], et al) [Y] 4 * paragraphs [0084] - [0089]; figures 4a-d *; | [XY]US2013111744 (TISCHLER MICHAEL A [US], et al) [X] 1,3,7-11 * paragraphs [0091] - [0101]; figure 6B * [Y] 1-15; | [Y]US2014334113 (VAN OS JACOBUS PETRUS JOHANNES [NL], et al) [Y] 4-6,14 * paragraphs [0054] - [0056]; figure 4a *; | [Y]US2016240517 (KIM CHISUN [KR], et al) [Y] 1-15 * paragraphs [0045] - [0048]; figure - * | Examination | US2017040306 |