| EP3564243 - PRODUCTION INTERMEDIATE OF ERIBULIN MESYLATE, AND METHOD FOR PRODUCING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.09.2023 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 07.10.2022 | ||
| Former | Grant of patent is intended Status updated on 25.08.2022 | ||
| Former | Examination is in progress Status updated on 19.07.2022 | ||
| Former | Grant of patent is intended Status updated on 18.04.2022 | ||
| Former | Examination is in progress Status updated on 22.07.2021 | ||
| Former | Request for examination was made Status updated on 04.10.2019 | ||
| Former | The international publication has been made Status updated on 07.07.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Yonsung Fine Chemical Co., Ltd. 207 Sujeong-ro Jangan-myeon Hwaseong-si, Gyeonggi-do 18581 / KR | [2020/01] |
| Former [2019/45] | For all designated states Yonsung Fine Chemical Co. Ltd. 207 Sujeong-ro Jangan-myeon Hwaseong-si, Gyeonggi-do 18581 / KR | Inventor(s) | 01 /
LEE, Hyoseon 2F, 15-16 Simjung-ro 114beon-gil Bucheon-si Gyeonggi-do 14610 / KR | 02 /
SHIN, Hyunik 8906-303 130 Wellbeing town-ro Yeongtong-gu Suwon-si Gyeonggi-do 16224 / KR | 03 /
LEE, Keeyoung 103-901 29 Baumoe-ro 7-gil Seocho-gu Seoul 06762 / KR | 04 /
OH, Changyoung 1110-801 147 Seopangyo-ro Bundang-gu Seongnam-si Gyeonggi-do 13475 / KR | [2019/45] | Representative(s) | V.O. P.O. Box 87930 2508 DH Den Haag / NL | [2019/45] | Application number, filing date | 18734042.7 | 02.01.2018 | [2019/45] | WO2018KR00043 | Priority number, date | KR20170000380 | 02.01.2017 Original published format: KR 20170000380 | KR20170172077 | 14.12.2017 Original published format: KR 20170172077 | [2019/45] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018124847 | Date: | 05.07.2018 | Language: | KO | [2018/27] | Type: | A1 Application with search report | No.: | EP3564243 | Date: | 06.11.2019 | Language: | EN | [2019/45] | Type: | B1 Patent specification | No.: | EP3564243 | Date: | 09.11.2022 | Language: | EN | [2022/45] | Search report(s) | International search report - published on: | KR | 05.07.2018 | (Supplementary) European search report - dispatched on: | EP | 28.08.2020 | Classification | IPC: | C07D493/04, A61K31/357, A61P35/00, A61K31/35 | [2019/45] | CPC: |
A61P35/00 (EP);
C07D493/04 (EP,US);
C07D309/10 (US);
Y02P20/55 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON ERIBULINMESYLAT UND VERFAHREN ZUR HERSTELLUNG DAVON | [2019/45] | English: | PRODUCTION INTERMEDIATE OF ERIBULIN MESYLATE, AND METHOD FOR PRODUCING SAME | [2019/45] | French: | INTERMÉDIAIRE DE PRODUCTION DE MÉSYLATE D'ÉRIBULINE, ET SON PROCÉDÉ DE PRODUCTION | [2019/45] | Entry into regional phase | 19.07.2019 | Translation filed | 19.07.2019 | National basic fee paid | 19.07.2019 | Search fee paid | 19.07.2019 | Designation fee(s) paid | 19.07.2019 | Examination fee paid | Examination procedure | 19.07.2019 | Examination requested [2019/45] | 12.03.2021 | Amendment by applicant (claims and/or description) | 21.07.2021 | Despatch of a communication from the examining division (Time limit: M04) | 08.11.2021 | Reply to a communication from the examining division | 19.04.2022 | Communication of intention to grant the patent | 13.07.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 26.08.2022 | Communication of intention to grant the patent | 04.10.2022 | Fee for grant paid | 04.10.2022 | Fee for publishing/printing paid | 04.10.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 10.08.2023 | No opposition filed within time limit [2023/42] | Fees paid | Renewal fee | 17.12.2019 | Renewal fee patent year 03 | 22.12.2020 | Renewal fee patent year 04 | 14.12.2021 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 02.01.2018 | HU | 02.01.2018 | AL | 09.11.2022 | AT | 09.11.2022 | BG | 09.11.2022 | CZ | 09.11.2022 | DK | 09.11.2022 | EE | 09.11.2022 | FI | 09.11.2022 | HR | 09.11.2022 | LT | 09.11.2022 | LV | 09.11.2022 | MC | 09.11.2022 | NL | 09.11.2022 | PL | 09.11.2022 | RO | 09.11.2022 | RS | 09.11.2022 | SE | 09.11.2022 | SI | 09.11.2022 | SK | 09.11.2022 | SM | 09.11.2022 | TR | 09.11.2022 | IE | 02.01.2023 | LU | 02.01.2023 | BE | 31.01.2023 | CH | 31.01.2023 | LI | 31.01.2023 | GB | 09.02.2023 | NO | 09.02.2023 | GR | 10.02.2023 | IS | 09.03.2023 | PT | 09.03.2023 | [2026/04] |
| Former [2025/39] | CY | 02.01.2018 | |
| HU | 02.01.2018 | ||
| AL | 09.11.2022 | ||
| AT | 09.11.2022 | ||
| BG | 09.11.2022 | ||
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| MC | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SI | 09.11.2022 | ||
| SK | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| IE | 02.01.2023 | ||
| LU | 02.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| GB | 09.02.2023 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2025/36] | CY | 02.01.2018 | |
| AL | 09.11.2022 | ||
| AT | 09.11.2022 | ||
| BG | 09.11.2022 | ||
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| MC | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SI | 09.11.2022 | ||
| SK | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| IE | 02.01.2023 | ||
| LU | 02.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| GB | 09.02.2023 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2024/51] | AL | 09.11.2022 | |
| AT | 09.11.2022 | ||
| BG | 09.11.2022 | ||
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| MC | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SI | 09.11.2022 | ||
| SK | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| IE | 02.01.2023 | ||
| LU | 02.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| GB | 09.02.2023 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2024/29] | AL | 09.11.2022 | |
| AT | 09.11.2022 | ||
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| MC | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SI | 09.11.2022 | ||
| SK | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| IE | 02.01.2023 | ||
| LU | 02.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| GB | 09.02.2023 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2024/08] | AL | 09.11.2022 | |
| AT | 09.11.2022 | ||
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SI | 09.11.2022 | ||
| SK | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| IE | 02.01.2023 | ||
| LU | 02.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| GB | 09.02.2023 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/51] | AL | 09.11.2022 | |
| AT | 09.11.2022 | ||
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SI | 09.11.2022 | ||
| SK | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| LU | 02.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/49] | AL | 09.11.2022 | |
| AT | 09.11.2022 | ||
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SK | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| LU | 02.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/47] | AL | 09.11.2022 | |
| AT | 09.11.2022 | ||
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SK | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| LU | 02.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/43] | AL | 09.11.2022 | |
| AT | 09.11.2022 | ||
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SK | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| LU | 02.01.2023 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/38] | AL | 09.11.2022 | |
| AT | 09.11.2022 | ||
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SK | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/37] | AL | 09.11.2022 | |
| AT | 09.11.2022 | ||
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/35] | AT | 09.11.2022 | |
| CZ | 09.11.2022 | ||
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RO | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/34] | AT | 09.11.2022 | |
| DK | 09.11.2022 | ||
| EE | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/33] | AT | 09.11.2022 | |
| DK | 09.11.2022 | ||
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| SM | 09.11.2022 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/29] | AT | 09.11.2022 | |
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| NL | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/25] | AT | 09.11.2022 | |
| FI | 09.11.2022 | ||
| HR | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| PL | 09.11.2022 | ||
| RS | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| IS | 09.03.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/23] | AT | 09.11.2022 | |
| FI | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| LV | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| NO | 09.02.2023 | ||
| GR | 10.02.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/22] | AT | 09.11.2022 | |
| FI | 09.11.2022 | ||
| LT | 09.11.2022 | ||
| SE | 09.11.2022 | ||
| NO | 09.02.2023 | ||
| PT | 09.03.2023 | ||
| Former [2023/20] | LT | 09.11.2022 | |
| NO | 09.02.2023 | Documents cited: | Search | [YA] WO2005118565 (EISAI CO LTD et al.) [Y] 12-20 * the whole document *[A] 1-11 | [XAY] DUAN J J-W ET AL: "Synthetic studies on halichondrins: A new practical synthesis of the C.1-C.12 segment", TETRAHEDRON LETTERS, ELSEVIER LTD, AMSTERDAM, NL, vol. 34, no. 47, 19 November 1993 (1993-11-19), pages 7541 - 7544, XP028085834, ISSN: 0040-4039, [retrieved on 19931119], DOI: 10.1016/S0040-4039(00)60394-5 [X] 9 * the whole document *[A] 1-8,10,11 [Y] 12-20 DOI: http://dx.doi.org/10.1016/S0040-4039(00)60394-5 | International search | [A] KR20070003026 (HYUNDAI MOTOR CO LTD et al.) [A] 1-20 * See pages 52-60. * | [A] KR20160023816 (EISAI R&D MAN CO LTD et al.) [A] 1-20 * See the entire document. * | [A] WO2016004805 (UNITRIS BIOPHARMA CO LTD et al.) [A] 1-20 * See the entire document. * | [A] YU , M. J. ET AL.: "From Micrograms to Grams: Scale-up Synthesis of Eribulin Mesylate", NATURAL PRODUCT REPORTS, vol. 30, no. 9, 2013, pages 1158 - 1164, XP055508104 [A] 1-20 * See abstract; and formulas 1, 2. * DOI: http://dx.doi.org/10.1039/c3np70051h | [A] CHASE, C. E. ET AL.: "Process Development of Halaven: Synthesis of the C1-C13 Fragment from D-(-)-Gulono-1,4-lactone", SYNLETT, vol. 24, no. 3, 2013, pages 323 - 326, XP055518043 [A] 1-20 * See the entire document. * DOI: http://dx.doi.org/10.1055/s-0032-1317919 | by applicant | US6214865 | TETRAHEDRON LETTER, vol. 37, 1996, pages 8643 - 8646 |