| EP3655240 - HIDING OPTICAL DEFECT LINES ON PARTS OF FDM PRINTED LUMINAIRES WITH METALLIC LOOK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.01.2022 Database last updated on 08.04.2026 | |
| Former | The patent has been granted Status updated on 29.01.2021 | ||
| Former | Grant of patent is intended Status updated on 21.09.2020 | ||
| Former | Request for examination was made Status updated on 24.04.2020 | ||
| Former | The international publication has been made Status updated on 26.01.2019 | ||
| Former | unknown Status updated on 13.07.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Signify Holding B.V. High Tech Campus 48 5656 AE Eindhoven / NL | [2020/22] | Inventor(s) | 01 /
KOOPMANS, Loes, Johanna, Mathilda c/o High Tech Campus 45 5656 AE Eindhoven / NL | 02 /
HIKMET, Rifat, Ata, Mustafa c/o High Tech Campus 45 5656 AE Eindhoven / NL | 03 /
GRUHLKE, Stefan, Willi, Julius c/o High Tech Campus 45 5656 AE Eindhoven / NL | [2020/22] | Representative(s) | Verweij, Petronella Daniëlle Signify Netherlands B.V. Intellectual Property High Tech Campus 7 5656 AE Eindhoven / NL | [2020/22] | Application number, filing date | 18735596.1 | 10.07.2018 | [2020/22] | WO2018EP68602 | Priority number, date | EP20170182295 | 20.07.2017 Original published format: EP 17182295 | [2020/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019016022 | Date: | 24.01.2019 | Language: | EN | [2019/04] | Type: | A1 Application with search report | No.: | EP3655240 | Date: | 27.05.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.01.2019 takes the place of the publication of the European patent application. | [2020/22] | Type: | B1 Patent specification | No.: | EP3655240 | Date: | 03.03.2021 | Language: | EN | [2021/09] | Search report(s) | International search report - published on: | EP | 24.01.2019 | Classification | IPC: | B29C70/58, B29C70/62, B29C71/02, B33Y70/00, B33Y10/00, B29C64/118 | [2020/22] | CPC: |
B29C64/118 (EP,US);
B29C70/585 (EP);
B29C70/62 (EP);
B29C71/02 (EP);
B33Y10/00 (EP,US);
B33Y70/10 (EP,US);
B33Y80/00 (US);
F21V7/04 (US);
F21V7/24 (US);
B29C2071/022 (EP);
B29K2505/02 (US);
B29K2505/14 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERSTECKEN OPTISCHER DEFEKTER LEITUNGEN AN TEILEN VON FDM-GEDRUCKTEN LEUCHTEN MIT METALLISCHEM AUSSEHEN | [2020/22] | English: | HIDING OPTICAL DEFECT LINES ON PARTS OF FDM PRINTED LUMINAIRES WITH METALLIC LOOK | [2020/22] | French: | MASQUAGE DE LIGNES DE DÉFAUTS OPTIQUES OPACIFIANTES SUR DES PARTIES DE LUMINAIRES IMPRIMÉS PAR FDM À ASPECT MÉTALLIQUE | [2020/41] |
| Former [2020/22] | DISSIMULATION DE LIGNES DE DÉFAUTS OPTIQUES SUR DES PARTIES DE LUMINAIRES IMPRIMÉS FDM À ASPECT MÉTALLIQUE | Entry into regional phase | 20.02.2020 | National basic fee paid | 20.02.2020 | Designation fee(s) paid | 20.02.2020 | Examination fee paid | Examination procedure | 15.01.2020 | Amendment by applicant (claims and/or description) | 20.02.2020 | Examination requested [2020/22] | 20.02.2020 | Date on which the examining division has become responsible | 22.09.2020 | Communication of intention to grant the patent | 19.01.2021 | Fee for grant paid | 19.01.2021 | Fee for publishing/printing paid | 19.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 06.12.2021 | No opposition filed within time limit [2022/06] | Fees paid | Renewal fee | 31.07.2020 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.07.2018 | AL | 03.03.2021 | AT | 03.03.2021 | CY | 03.03.2021 | CZ | 03.03.2021 | DK | 03.03.2021 | EE | 03.03.2021 | ES | 03.03.2021 | FI | 03.03.2021 | HR | 03.03.2021 | IT | 03.03.2021 | LT | 03.03.2021 | LV | 03.03.2021 | MC | 03.03.2021 | MK | 03.03.2021 | MT | 03.03.2021 | NL | 03.03.2021 | PL | 03.03.2021 | RO | 03.03.2021 | RS | 03.03.2021 | SE | 03.03.2021 | SI | 03.03.2021 | SK | 03.03.2021 | SM | 03.03.2021 | TR | 03.03.2021 | BG | 03.06.2021 | NO | 03.06.2021 | GR | 04.06.2021 | IS | 03.07.2021 | PT | 05.07.2021 | IE | 10.07.2021 | LU | 10.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | LI | 31.07.2021 | [2024/42] |
| Former [2024/29] | HU | 10.07.2018 | |
| AL | 03.03.2021 | ||
| AT | 03.03.2021 | ||
| CY | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| IT | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| MC | 03.03.2021 | ||
| MK | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SI | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| TR | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| IS | 03.07.2021 | ||
| PT | 05.07.2021 | ||
| IE | 10.07.2021 | ||
| LU | 10.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| Former [2024/23] | HU | 10.07.2018 | |
| AL | 03.03.2021 | ||
| AT | 03.03.2021 | ||
| CY | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| IT | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| MC | 03.03.2021 | ||
| MK | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SI | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| IS | 03.07.2021 | ||
| PT | 05.07.2021 | ||
| IE | 10.07.2021 | ||
| LU | 10.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| Former [2023/41] | HU | 10.07.2018 | |
| AL | 03.03.2021 | ||
| AT | 03.03.2021 | ||
| CY | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| IT | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| MC | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SI | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| IS | 03.07.2021 | ||
| PT | 05.07.2021 | ||
| IE | 10.07.2021 | ||
| LU | 10.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| Former [2023/33] | HU | 10.07.2018 | |
| AL | 03.03.2021 | ||
| AT | 03.03.2021 | ||
| CY | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| IT | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| MC | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| IS | 03.07.2021 | ||
| PT | 05.07.2021 | ||
| IE | 10.07.2021 | ||
| LU | 10.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| Former [2023/30] | AL | 03.03.2021 | |
| AT | 03.03.2021 | ||
| CY | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| IT | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| MC | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| IS | 03.07.2021 | ||
| PT | 05.07.2021 | ||
| IE | 10.07.2021 | ||
| LU | 10.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| Former [2022/35] | AL | 03.03.2021 | |
| AT | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| IT | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| MC | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| IS | 03.07.2021 | ||
| PT | 05.07.2021 | ||
| IE | 10.07.2021 | ||
| LU | 10.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| Former [2022/34] | AL | 03.03.2021 | |
| AT | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| IT | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| MC | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| IS | 03.07.2021 | ||
| PT | 05.07.2021 | ||
| LU | 10.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| Former [2022/23] | AL | 03.03.2021 | |
| AT | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| IT | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| MC | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| IS | 03.07.2021 | ||
| PT | 05.07.2021 | ||
| LU | 10.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| Former [2022/21] | AL | 03.03.2021 | |
| AT | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| MC | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| PT | 05.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| Former [2022/18] | AL | 03.03.2021 | |
| AT | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| MC | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| PT | 05.07.2021 | ||
| Former [2022/10] | AL | 03.03.2021 | |
| AT | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| PT | 05.07.2021 | ||
| Former [2022/08] | AL | 03.03.2021 | |
| AT | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| DK | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| ES | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| IS | 03.07.2021 | ||
| PT | 05.07.2021 | ||
| Former [2022/07] | AL | 03.03.2021 | |
| AT | 03.03.2021 | ||
| CZ | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| IS | 03.07.2021 | ||
| PT | 05.07.2021 | ||
| Former [2021/51] | AT | 03.03.2021 | |
| CZ | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| IS | 03.07.2021 | ||
| PT | 05.07.2021 | ||
| Former [2021/50] | AT | 03.03.2021 | |
| CZ | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RO | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SK | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| PT | 05.07.2021 | ||
| Former [2021/48] | AT | 03.03.2021 | |
| CZ | 03.03.2021 | ||
| EE | 03.03.2021 | ||
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| Former [2021/46] | AT | 03.03.2021 | |
| FI | 03.03.2021 | ||
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| SM | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| Former [2021/43] | FI | 03.03.2021 | |
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| NL | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| Former [2021/39] | FI | 03.03.2021 | |
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| PL | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| Former [2021/38] | FI | 03.03.2021 | |
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| SE | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| Former [2021/37] | FI | 03.03.2021 | |
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| LV | 03.03.2021 | ||
| RS | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| Former [2021/36] | FI | 03.03.2021 | |
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| BG | 03.06.2021 | ||
| NO | 03.06.2021 | ||
| GR | 04.06.2021 | ||
| Former [2021/35] | FI | 03.03.2021 | |
| HR | 03.03.2021 | ||
| LT | 03.03.2021 | ||
| NO | 03.06.2021 | ||
| Former [2021/33] | FI | 03.03.2021 | |
| LT | 03.03.2021 | ||
| NO | 03.06.2021 | Cited in | International search | [XYI] WO2016083797 (NGF EUROP LTD et al.) | [Y] US2015259530 (RODGERS LUKE M B et al.) | [A] WO9914620 (MINNESOTA MINING & MFG et al.) | Examination | WO2017080951 | by applicant | US2001011779 | WO2016083797 | US2015259530 | "CRC Handbook of Chemistry and Physics", pages: 1088 - 1989 |