EP3652483 - SYSTEM AND METHOD FOR CONNECTING DUCT SECTIONS OF A SOLID RETURN SYSTEM OF A BOILER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.12.2022 Database last updated on 06.11.2024 | |
Former | The patent has been granted Status updated on 14.01.2022 | ||
Former | Grant of patent is intended Status updated on 09.09.2021 | ||
Former | Examination is in progress Status updated on 11.12.2020 | ||
Former | Request for examination was made Status updated on 17.04.2020 | ||
Former | The international publication has been made Status updated on 18.01.2019 | ||
Former | unknown Status updated on 20.07.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states General Electric Technology GmbH Brown Boveri Strasse 8 5400 Baden / CH | [2021/15] |
Former [2020/21] | For all designated states General Electric Technology GmbH Brown Boveri Strasse 7 5400 Baden / CH | Inventor(s) | 01 /
THOMAS, Craig A. 110 Orient St Worcester, MA 01604 / US | 02 /
ULLRICH, Joseph P. 200 Great Pond Drive P.O. Box 500 Windsor, Connecticut 06095 / US | 03 /
WOODS, Robert E. 200 Great Pond Drive Windsor, Connecticut 06095 / US | [2020/21] | Representative(s) | Wesela-Bauman, Grzegorz ul. Kosciuszki 14 96-300 Zyrardow / PL | [2022/07] |
Former [2020/21] | Freigutpartners IP Law Firm Hahnrainweg 4 5400 Baden / CH | Application number, filing date | 18737876.5 | 04.07.2018 | [2020/21] | WO2018EP68075 | Priority number, date | US201715646579 | 11.07.2017 Original published format: US201715646579 | [2020/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019011747 | Date: | 17.01.2019 | Language: | EN | [2019/03] | Type: | A1 Application with search report | No.: | EP3652483 | Date: | 20.05.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.01.2019 takes the place of the publication of the European patent application. | [2020/21] | Type: | B1 Patent specification | No.: | EP3652483 | Date: | 16.02.2022 | Language: | EN | [2022/07] | Search report(s) | International search report - published on: | EP | 17.01.2019 | Classification | IPC: | F23C10/18 | [2020/21] | CPC: |
F23C10/18 (EP,US);
F16L27/0808 (US);
F16L51/025 (EP,US);
F16L51/03 (EP,US);
F16L59/21 (EP,US);
F22B31/0084 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUM VERBINDEN VON KANALABSCHNITTEN EINES FESTEN RÜCKFÜHRSYSTEMS EINES KESSELS | [2020/21] | English: | SYSTEM AND METHOD FOR CONNECTING DUCT SECTIONS OF A SOLID RETURN SYSTEM OF A BOILER | [2020/21] | French: | SYSTÈME ET PROCÉDÉ PERMETTANT DE RACCORDER DES SECTIONS DE CONDUIT D'UN SYSTÈME DE RETOUR DE MATIÈRES SOLIDES D'UNE CHAUDIÈRE | [2020/21] | Entry into regional phase | 10.01.2020 | National basic fee paid | 10.01.2020 | Designation fee(s) paid | 10.01.2020 | Examination fee paid | Examination procedure | 10.01.2020 | Amendment by applicant (claims and/or description) | 10.01.2020 | Examination requested [2020/21] | 10.01.2020 | Date on which the examining division has become responsible | 11.12.2020 | Despatch of a communication from the examining division (Time limit: M06) | 24.05.2021 | Reply to a communication from the examining division | 10.09.2021 | Communication of intention to grant the patent | 05.01.2022 | Fee for grant paid | 05.01.2022 | Fee for publishing/printing paid | 05.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 17.11.2022 | No opposition filed within time limit [2023/04] | Fees paid | Renewal fee | 22.07.2020 | Renewal fee patent year 03 | 20.07.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.07.2018 | AL | 16.02.2022 | AT | 16.02.2022 | CY | 16.02.2022 | CZ | 16.02.2022 | DK | 16.02.2022 | EE | 16.02.2022 | ES | 16.02.2022 | HR | 16.02.2022 | IT | 16.02.2022 | LT | 16.02.2022 | LV | 16.02.2022 | MC | 16.02.2022 | MK | 16.02.2022 | MT | 16.02.2022 | NL | 16.02.2022 | PL | 16.02.2022 | RO | 16.02.2022 | RS | 16.02.2022 | SE | 16.02.2022 | SI | 16.02.2022 | SK | 16.02.2022 | SM | 16.02.2022 | TR | 16.02.2022 | BG | 16.05.2022 | NO | 16.05.2022 | GR | 17.05.2022 | PT | 16.06.2022 | IS | 17.06.2022 | GB | 04.07.2022 | IE | 04.07.2022 | LU | 04.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | FR | 31.07.2022 | LI | 31.07.2022 | [2024/44] |
Former [2024/29] | HU | 04.07.2018 | |
AL | 16.02.2022 | ||
AT | 16.02.2022 | ||
CY | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
IT | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
MC | 16.02.2022 | ||
MK | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
TR | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
GB | 04.07.2022 | ||
IE | 04.07.2022 | ||
LU | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2024/24] | HU | 04.07.2018 | |
AL | 16.02.2022 | ||
AT | 16.02.2022 | ||
CY | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
IT | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
MC | 16.02.2022 | ||
MK | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
GB | 04.07.2022 | ||
IE | 04.07.2022 | ||
LU | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2024/23] | AL | 16.02.2022 | |
AT | 16.02.2022 | ||
CY | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
IT | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
MC | 16.02.2022 | ||
MK | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
GB | 04.07.2022 | ||
IE | 04.07.2022 | ||
LU | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2024/20] | AL | 16.02.2022 | |
AT | 16.02.2022 | ||
CY | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
IT | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
MC | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
GB | 04.07.2022 | ||
IE | 04.07.2022 | ||
LU | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/35] | AL | 16.02.2022 | |
AT | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
IT | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
MC | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
GB | 04.07.2022 | ||
IE | 04.07.2022 | ||
LU | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/33] | AL | 16.02.2022 | |
AT | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
MC | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
GB | 04.07.2022 | ||
IE | 04.07.2022 | ||
LU | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/27] | AL | 16.02.2022 | |
AT | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
MC | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
GB | 04.07.2022 | ||
LU | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/25] | AL | 16.02.2022 | |
AT | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
MC | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
LU | 04.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/22] | AL | 16.02.2022 | |
AT | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
MC | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
LU | 04.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/21] | AL | 16.02.2022 | |
AT | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
MC | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
LU | 04.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/11] | AL | 16.02.2022 | |
AT | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
MC | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
Former [2023/10] | AL | 16.02.2022 | |
AT | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SI | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
Former [2023/01] | AL | 16.02.2022 | |
AT | 16.02.2022 | ||
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
Former [2022/49] | AT | 16.02.2022 | |
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SK | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
Former [2022/48] | AT | 16.02.2022 | |
CZ | 16.02.2022 | ||
DK | 16.02.2022 | ||
EE | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
Former [2022/47] | AT | 16.02.2022 | |
DK | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RO | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
SM | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
Former [2022/46] | AT | 16.02.2022 | |
DK | 16.02.2022 | ||
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
Former [2022/42] | AT | 16.02.2022 | |
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
IS | 17.06.2022 | ||
Former [2022/36] | AT | 16.02.2022 | |
ES | 16.02.2022 | ||
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
LV | 16.02.2022 | ||
NL | 16.02.2022 | ||
PL | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
GR | 17.05.2022 | ||
PT | 16.06.2022 | ||
Former [2022/35] | ES | 16.02.2022 | |
HR | 16.02.2022 | ||
LT | 16.02.2022 | ||
NL | 16.02.2022 | ||
RS | 16.02.2022 | ||
SE | 16.02.2022 | ||
BG | 16.05.2022 | ||
NO | 16.05.2022 | ||
PT | 16.06.2022 | ||
Former [2022/34] | ES | 16.02.2022 | |
LT | 16.02.2022 | ||
NL | 16.02.2022 | ||
NO | 16.05.2022 | ||
PT | 16.06.2022 | ||
Former [2022/33] | LT | 16.02.2022 | |
NO | 16.05.2022 | Cited in | International search | [A]AT374917B (PLIBRICO AUSTRIA [AT]) [A] 5,6 * page 2, line 1 - line 21; figures 2,3 *; | [A]EP0559387 (FOSTER WHEELER ENERGY CORP [US]) [A] 1,7,8,11-20 * column 1, line 1 - line 5; figures 1-3 * * column 2, line 30 - line 35 * * column 2, line 44 - line 52 * * column 3, line 58 - column 6, line 16 *; | [XAI]US5383316 (BURKE JAMES [US], et al) [X] 1,2,4,9,10 * column 1, line 10 - line 15; figures 1,13,14 * * column 1, line 23 - line 41 * * column 3, line 4 - line 6 * * column 4, line 36 - line 55 * * column 5, line 27 - line 44 * * column 6, line 26 - column 7, line 38 * * column 8, line 26 - column 9, line 44 * [A] 11-20 [I] 3; | [A]CN205227300U (YUNNAN DATANG INT HONGHE POWER GENERATION CO LTD) [A] 1* the whole document * |