blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3646644

EP3646644 - POWER RESERVATION FOR CARRIER AGGREGATION SIGNALING DURING SHORTENED TRANSMISSION TIME INTERVALS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.09.2022
Database last updated on 25.09.2024
FormerThe patent has been granted
Status updated on  08.10.2021
FormerGrant of patent is intended
Status updated on  07.06.2021
FormerExamination is in progress
Status updated on  18.12.2020
FormerRequest for examination was made
Status updated on  03.04.2020
FormerThe international publication has been made
Status updated on  04.01.2019
Formerunknown
Status updated on  01.08.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
[2020/19]
Inventor(s)01 / AKULA, Prashanth
5775 Morehouse Drive
San Diego, California 92121-1714 / US
02 / FARAJIDANA, Amir
5775 Morehouse Drive
San Diego, California 92121-1714 / US
03 / HOSSEINI, Seyedkianoush
5775 Morehouse Drive
San Diego, California 92121-1714 / US
 [2020/19]
Representative(s)Dunlop, Hugh Christopher, et al
Maucher Jenkins
Seventh Floor Offices
Artillery House
11-19 Artillery Row
London SW1P 1RT / GB
[N/P]
Former [2020/19]Dunlop, Hugh Christopher, et al
Maucher Jenkins
26 Caxton Street
London SW1H 0RJ / GB
Application number, filing date18743218.227.06.2018
[2020/19]
WO2018US39676
Priority number, dateUS201762526650P29.06.2017         Original published format: US 201762526650 P
US20181601911326.06.2018         Original published format: US201816019113
[2020/19]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019005912
Date:03.01.2019
Language:EN
[2019/01]
Type: A1 Application with search report 
No.:EP3646644
Date:06.05.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 03.01.2019 takes the place of the publication of the European patent application.
[2020/19]
Type: B1 Patent specification 
No.:EP3646644
Date:10.11.2021
Language:EN
[2021/45]
Search report(s)International search report - published on:EP03.01.2019
ClassificationIPC:H04L5/00, H04W52/38, H04W52/14, H04W52/36, H04W52/34, H04W52/52
[2021/23]
CPC:
H04W52/365 (EP,US); H04L5/00 (US); H04L5/0082 (EP,US);
H04L5/0098 (EP,US); H04W52/346 (EP,US); H04W52/367 (EP,US);
H04W52/38 (EP,US); H04W52/52 (EP,US); H04W72/044 (US);
H04L5/0007 (EP,US); H04L5/001 (EP,US); H04W52/146 (EP,US);
Y02D30/70 (EP) (-)
Former IPC [2020/19]H04W52/34, H04W52/36, H04W52/52, H04W52/14
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/19]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:LEISTUNGSRESERVIERUNG FÜR TRÄGERAGGREGATIONSSIGNALISIERUNG BEI ABGEKÜRZTEN ÜBERTRAGUNGSZEITINTERVALLEN[2020/19]
English:POWER RESERVATION FOR CARRIER AGGREGATION SIGNALING DURING SHORTENED TRANSMISSION TIME INTERVALS[2020/19]
French:RÉSERVATION DE PUISSANCE POUR SIGNALISATION D'AGRÉGATION DE PORTEUSES PENDANT DES INTERVALLES DE TEMPS DE TRANSMISSION RACCOURCIS[2020/19]
Entry into regional phase06.12.2019National basic fee paid 
06.12.2019Designation fee(s) paid 
06.12.2019Examination fee paid 
Examination procedure06.12.2019Examination requested  [2020/19]
06.12.2019Date on which the examining division has become responsible
03.08.2020Amendment by applicant (claims and/or description)
18.12.2020Despatch of a communication from the examining division (Time limit: M04)
20.04.2021Reply to a communication from the examining division
08.06.2021Communication of intention to grant the patent
01.10.2021Fee for grant paid
01.10.2021Fee for publishing/printing paid
01.10.2021Receipt of the translation of the claim(s)
Opposition(s)11.08.2022No opposition filed within time limit [2022/42]
Fees paidRenewal fee
09.04.2020Renewal fee patent year 03
08.06.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.06.2018
AL10.11.2021
AT10.11.2021
CY10.11.2021
CZ10.11.2021
DK10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
IT10.11.2021
LT10.11.2021
LV10.11.2021
MC10.11.2021
MK10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SI10.11.2021
SK10.11.2021
SM10.11.2021
TR10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
IE27.06.2022
LU27.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
[2024/29]
Former [2024/24]HU27.06.2018
AL10.11.2021
AT10.11.2021
CY10.11.2021
CZ10.11.2021
DK10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
IT10.11.2021
LT10.11.2021
LV10.11.2021
MC10.11.2021
MK10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SI10.11.2021
SK10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
IE27.06.2022
LU27.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
Former [2024/23]AL10.11.2021
AT10.11.2021
CY10.11.2021
CZ10.11.2021
DK10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
IT10.11.2021
LT10.11.2021
LV10.11.2021
MC10.11.2021
MK10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SI10.11.2021
SK10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
IE27.06.2022
LU27.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
Former [2024/20]AL10.11.2021
AT10.11.2021
CY10.11.2021
CZ10.11.2021
DK10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
IT10.11.2021
LT10.11.2021
LV10.11.2021
MC10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SI10.11.2021
SK10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
IE27.06.2022
LU27.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
Former [2023/25]AL10.11.2021
AT10.11.2021
CZ10.11.2021
DK10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
IT10.11.2021
LT10.11.2021
LV10.11.2021
MC10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SI10.11.2021
SK10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
IE27.06.2022
LU27.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
Former [2023/21]AL10.11.2021
AT10.11.2021
CZ10.11.2021
DK10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
LT10.11.2021
LV10.11.2021
MC10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SI10.11.2021
SK10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
IE27.06.2022
LU27.06.2022
CH30.06.2022
LI30.06.2022
Former [2023/20]AL10.11.2021
AT10.11.2021
CZ10.11.2021
DK10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
LT10.11.2021
LV10.11.2021
MC10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SI10.11.2021
SK10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
IE27.06.2022
Former [2023/08]AL10.11.2021
AT10.11.2021
CZ10.11.2021
DK10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
LT10.11.2021
LV10.11.2021
MC10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SI10.11.2021
SK10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
Former [2023/01]AL10.11.2021
AT10.11.2021
CZ10.11.2021
DK10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
LT10.11.2021
LV10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SI10.11.2021
SK10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
Former [2022/49]AL10.11.2021
AT10.11.2021
CZ10.11.2021
DK10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
LT10.11.2021
LV10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SK10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
Former [2022/35]AT10.11.2021
CZ10.11.2021
DK10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
LT10.11.2021
LV10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SK10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
Former [2022/34]AT10.11.2021
EE10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
LT10.11.2021
LV10.11.2021
NL10.11.2021
PL10.11.2021
RO10.11.2021
RS10.11.2021
SE10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
Former [2022/33]AT10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
LT10.11.2021
LV10.11.2021
NL10.11.2021
PL10.11.2021
RS10.11.2021
SE10.11.2021
SM10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
Former [2022/25]AT10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
LT10.11.2021
LV10.11.2021
NL10.11.2021
PL10.11.2021
RS10.11.2021
SE10.11.2021
BG10.02.2022
NO10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
Former [2022/24]AT10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
LT10.11.2021
LV10.11.2021
NL10.11.2021
PL10.11.2021
RS10.11.2021
SE10.11.2021
BG10.02.2022
GR11.02.2022
IS10.03.2022
PT10.03.2022
Former [2022/23]AT10.11.2021
ES10.11.2021
FI10.11.2021
HR10.11.2021
LT10.11.2021
LV10.11.2021
PL10.11.2021
RS10.11.2021
BG10.02.2022
PT10.03.2022
Former [2022/22]AT10.11.2021
FI10.11.2021
LT10.11.2021
RS10.11.2021
BG10.02.2022
Former [2022/21]AT10.11.2021
RS10.11.2021
BG10.02.2022
Former [2022/19]BG10.02.2022
Cited inInternational search[XAI]WO2016137816  (QUALCOMM INC [US]) [X] 1-4,14,19,22,26-29,39,44,47,51-54 * paragraphs [0056] - [0060] - [0076] - [0080] * [A] 5-11,20,21,30-36,45,46[I] 12,13,15-18,23-25,37-43,48-50;
 [XAI]  - INTERDIGITAL INC, "Power Sharing Mechanisms with LTE-NR DC and NR DC", vol. RAN WG1, no. Qingdao, P.R. China; 20170627 - 20170630, (20170626), 3GPP DRAFT; R1-1710879 (R15 NR WI AI 5191 POWER SHARING), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170626), XP051300081 [X] 1-4,14,19,22,26-29,39,44,47,51-54 * pages 2,5-7 * [A] 5-11,20,21,30-36,45,46 [I] 12,13,15-18,23-25,37-43,48-50
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.