EP3568961 - SYSTEM AND METHOD FOR COMMUNICATIONS WITH REDUCED PEAK TO AVERAGE POWER RATIO [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.06.2022 Database last updated on 12.10.2024 | |
Former | The patent has been granted Status updated on 25.06.2021 | ||
Former | Grant of patent is intended Status updated on 07.02.2021 | ||
Former | Request for examination was made Status updated on 18.10.2019 | ||
Former | The international publication has been made Status updated on 04.08.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2019/47] | Inventor(s) | 01 /
BAKULIN, Mikhail Germanovich Ul. Kirova 35-31 Podolsk Moskovskaya obl. 142110 / RU | 02 /
OVECHKIN, Gennady Vladimirovich Ul. Gagarina 14-27 Ryazan 390005 / RU | 03 /
KREYNDELIN, Vitaly Borisovich Ul. Novorossijskaja 32-142 Moscow 109559 / RU | 04 /
ABDOLI, Javad 249 Tandalee Cres. Kanata Ontario K2M 0A1 / CA | [2019/47] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2019/47] | Application number, filing date | 18744237.1 | 17.01.2018 | [2019/47] | WO2018CN73077 | Priority number, date | US201715415442 | 25.01.2017 Original published format: US201715415442 | [2019/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018137530 | Date: | 02.08.2018 | Language: | EN | [2018/31] | Type: | A1 Application with search report | No.: | EP3568961 | Date: | 20.11.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.08.2018 takes the place of the publication of the European patent application. | [2019/47] | Type: | B1 Patent specification | No.: | EP3568961 | Date: | 28.07.2021 | Language: | EN | [2021/30] | Search report(s) | International search report - published on: | CN | 02.08.2018 | (Supplementary) European search report - dispatched on: | EP | 06.12.2019 | Classification | IPC: | H04L27/26, H04J13/00, H04B1/69, H04B7/0456 | [2020/02] | CPC: |
H04B1/69 (EP,US);
H04L27/2615 (US);
H04B7/0465 (EP,US);
H04J13/00 (EP,US);
H04L25/03936 (US);
H04L27/2614 (EP);
H04L27/2636 (EP)
(-)
|
Former IPC [2019/47] | H04L27/26 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR KOMMUNIKATION MIT VERRINGERTEM VERHÄLTNIS VON SPITZENLEISTUNG ZU DURCHSCHNITTSLEISTUNG | [2019/47] | English: | SYSTEM AND METHOD FOR COMMUNICATIONS WITH REDUCED PEAK TO AVERAGE POWER RATIO | [2019/47] | French: | SYSTÈME ET PROCÉDÉ PERMETTANT DES COMMUNICATIONS AYANT UN RAPPORT DE PUISSANCE DE MAXIMALE/PUISSANCE MOYENNE RÉDUIT | [2019/47] | Entry into regional phase | 12.08.2019 | National basic fee paid | 12.08.2019 | Search fee paid | 12.08.2019 | Designation fee(s) paid | 12.08.2019 | Examination fee paid | Examination procedure | 12.08.2019 | Examination requested [2019/47] | 04.06.2020 | Amendment by applicant (claims and/or description) | 08.02.2021 | Communication of intention to grant the patent | 18.06.2021 | Fee for grant paid | 18.06.2021 | Fee for publishing/printing paid | 18.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 29.04.2022 | No opposition filed within time limit [2022/27] | Fees paid | Renewal fee | 31.01.2020 | Renewal fee patent year 03 | 31.01.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.01.2018 | AL | 28.07.2021 | AT | 28.07.2021 | CY | 28.07.2021 | CZ | 28.07.2021 | DK | 28.07.2021 | EE | 28.07.2021 | ES | 28.07.2021 | FI | 28.07.2021 | HR | 28.07.2021 | IT | 28.07.2021 | LT | 28.07.2021 | LV | 28.07.2021 | MC | 28.07.2021 | MK | 28.07.2021 | MT | 28.07.2021 | NL | 28.07.2021 | PL | 28.07.2021 | RO | 28.07.2021 | RS | 28.07.2021 | SE | 28.07.2021 | SI | 28.07.2021 | SK | 28.07.2021 | SM | 28.07.2021 | BG | 28.10.2021 | NO | 28.10.2021 | GR | 29.10.2021 | IS | 28.11.2021 | PT | 29.11.2021 | GB | 17.01.2022 | IE | 17.01.2022 | LU | 17.01.2022 | BE | 31.01.2022 | CH | 31.01.2022 | FR | 31.01.2022 | LI | 31.01.2022 | [2024/44] |
Former [2024/24] | HU | 17.01.2018 | |
AL | 28.07.2021 | ||
AT | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
MK | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 17.01.2022 | ||
IE | 17.01.2022 | ||
LU | 17.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2024/23] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
MK | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 17.01.2022 | ||
IE | 17.01.2022 | ||
LU | 17.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2024/20] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 17.01.2022 | ||
IE | 17.01.2022 | ||
LU | 17.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/09] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 17.01.2022 | ||
IE | 17.01.2022 | ||
LU | 17.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/03] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 17.01.2022 | ||
LU | 17.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/01] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 17.01.2022 | ||
LU | 17.01.2022 | ||
BE | 31.01.2022 | ||
FR | 31.01.2022 | ||
Former [2022/50] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 17.01.2022 | ||
LU | 17.01.2022 | ||
FR | 31.01.2022 | ||
Former [2022/47] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
GB | 17.01.2022 | ||
LU | 17.01.2022 | ||
Former [2022/46] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
LU | 17.01.2022 | ||
Former [2022/39] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/36] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/29] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/25] | AT | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/24] | AT | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/21] | AT | 28.07.2021 | |
DK | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/10] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/09] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
PT | 29.11.2021 | ||
Former [2022/08] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
Former [2022/07] | AT | 28.07.2021 | |
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
NO | 28.10.2021 | Documents cited: | Search | [I]US2016330265 (ABDOLI JAVAD [CA], et al) [I] 1-13 * paragraphs [0043] - [0045] * | [XI] - SHARP, "Multiple access schemes for NR", vol. RAN WG1, no. Gothenburg, Sweden; 20160822 - 20160826, (20160812), 3GPP DRAFT; R1-167615, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_86/Docs/, (20160812), XP051142084 [X] 1,6-11 * pages 2-4 * [I] 2-5,12,13 | International search | [XY]US2016050039 (MA JIANGLEI [CA], et al) [X] 21, 22 * description, paragraphs [0025]-[0054], [0063]-[0067], figures 1-7 description, paragraphs [0025]-[0054], [0063]-[0067], figures 1-7 * [Y] 1-20; | [A]CN105723637 (HUAWEI TECH CO LTD) [A] 1-22 * the whole document *; | [A]US2016353446 (ABDOLI JAVAD [CA], et al) [A] 1-22 * the whole document * | [Y] - SAMSUNG, "Discussion on low PAPR non-orthogonal multiple access", 3GPP TSG RAN WGI Meeting #86bis R1-1609036, (20161014), XP051158402 [Y] 1-20 | by applicant | US2016330265 | US2016050039 | - "Multiple access schemes for NR", SHARP, 3GPP DRAFT; Rl-167615, 3RD GENERATION PARTNERSHIP PROJECT (3GPP, MOBILE COMPETENCE CENTRE |