blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3579628

EP3579628 - METHOD FOR TRANSMITTING PHYSICAL UPLINK SHARED CHANNEL IN WIRELESS COMMUNICATION SYSTEM AND DEVICE THEREFOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.06.2024
Database last updated on 10.07.2024
FormerThe patent has been granted
Status updated on  14.07.2023
FormerGrant of patent is intended
Status updated on  05.03.2023
FormerExamination is in progress
Status updated on  01.10.2021
FormerRequest for examination was made
Status updated on  08.11.2019
FormerThe international publication has been made
Status updated on  11.08.2018
Most recent event   Tooltip20.06.2024No opposition filed within time limitpublished on 24.07.2024 [2024/30]
Applicant(s)For all designated states
LG Electronics Inc.
128, Yeoui-daero
Yeongdeungpo-gu
Seoul 07336 / KR
[2019/50]
Inventor(s)01 / BAE, Duckhyun
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
02 / YI, Yunjung
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
03 / HWANG, Daesung
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
04 / BYUN, Ilmu
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
 [2019/50]
Representative(s)Plasseraud IP
104 Rue de Richelieu
CS92104
75080 Paris Cedex 02 / FR
[N/P]
Former [2019/50]Plasseraud IP
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Application number, filing date18747132.105.02.2018
[2019/50]
WO2018KR01502
Priority number, dateUS201762454872P05.02.2017         Original published format: US 201762454872 P
US201762475996P24.03.2017         Original published format: US 201762475996 P
US201862617072P12.01.2018         Original published format: US 201862617072 P
[2019/50]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018143741
Date:09.08.2018
Language:KO
[2018/32]
Type: A1 Application with search report 
No.:EP3579628
Date:11.12.2019
Language:EN
[2019/50]
Type: B1 Patent specification 
No.:EP3579628
Date:16.08.2023
Language:EN
[2023/33]
Search report(s)International search report - published on:KR09.08.2018
(Supplementary) European search report - dispatched on:EP20.01.2021
ClassificationIPC:H04L1/18, H04L1/08
[2023/13]
CPC:
H04L1/1887 (EP); H04W72/02 (EP,US); H04L1/0061 (US);
H04L1/08 (EP); H04L1/1819 (US); H04L5/0044 (EP);
H04L5/0051 (US); H04L5/0053 (EP); H04L5/0094 (EP);
H04L5/10 (US); H04W72/21 (US); H04W72/23 (US);
H04W72/56 (US); H04W72/569 (EP); H04L1/1664 (EP);
H04L1/1854 (EP) (-)
Former IPC [2020/47]H04W72/02, H04W72/10, H04W72/14, H04L1/18, H04L1/08
Former IPC [2019/50]H04W72/02, H04W72/10, H04W72/14
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/50]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN ZUR ÜBERTRAGUNG EINES PHYSIKALISCHEN GETEILTEN UPLINK-STEUERUNGSKANALS IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM UND VORRICHTUNG DAFÜR[2019/50]
English:METHOD FOR TRANSMITTING PHYSICAL UPLINK SHARED CHANNEL IN WIRELESS COMMUNICATION SYSTEM AND DEVICE THEREFOR[2019/50]
French:PROCÉDÉ DE TRANSMISSION D'UN CANAL PARTAGÉ DE LIAISON MONTANTE PHYSIQUE DANS UN SYSTÈME DE COMMUNICATION SANS FIL ET DISPOSITIF CORRESPONDANT[2019/50]
Entry into regional phase03.09.2019Translation filed 
03.09.2019National basic fee paid 
03.09.2019Search fee paid 
03.09.2019Designation fee(s) paid 
03.09.2019Examination fee paid 
Examination procedure03.09.2019Examination requested  [2019/50]
28.07.2021Amendment by applicant (claims and/or description)
05.10.2021Despatch of a communication from the examining division (Time limit: M04)
25.01.2022Reply to a communication from the examining division
29.03.2022Despatch of a communication from the examining division (Time limit: M04)
01.07.2022Reply to a communication from the examining division
06.09.2022Despatch of a communication from the examining division (Time limit: M04)
20.12.2022Reply to a communication from the examining division
06.03.2023Communication of intention to grant the patent
04.07.2023Fee for grant paid
04.07.2023Fee for publishing/printing paid
04.07.2023Receipt of the translation of the claim(s)
Opposition(s)17.05.2024No opposition filed within time limit [2024/30]
Fees paidRenewal fee
24.02.2020Renewal fee patent year 03
22.02.2021Renewal fee patent year 04
22.02.2022Renewal fee patent year 05
23.02.2023Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT16.08.2023
CZ16.08.2023
DK16.08.2023
EE16.08.2023
ES16.08.2023
FI16.08.2023
HR16.08.2023
LT16.08.2023
LV16.08.2023
NL16.08.2023
PL16.08.2023
RO16.08.2023
RS16.08.2023
SE16.08.2023
SK16.08.2023
SM16.08.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
[2024/23]
Former [2024/22]AT16.08.2023
CZ16.08.2023
DK16.08.2023
FI16.08.2023
HR16.08.2023
LT16.08.2023
LV16.08.2023
NL16.08.2023
PL16.08.2023
RO16.08.2023
RS16.08.2023
SE16.08.2023
SM16.08.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
Former [2024/20]AT16.08.2023
FI16.08.2023
HR16.08.2023
LT16.08.2023
LV16.08.2023
NL16.08.2023
PL16.08.2023
RS16.08.2023
SE16.08.2023
SM16.08.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
Former [2024/10]AT16.08.2023
FI16.08.2023
HR16.08.2023
LT16.08.2023
LV16.08.2023
NL16.08.2023
PL16.08.2023
RS16.08.2023
SE16.08.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
Former [2024/09]AT16.08.2023
FI16.08.2023
LT16.08.2023
NL16.08.2023
SE16.08.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
Former [2024/08]LT16.08.2023
NL16.08.2023
NO16.11.2023
GR17.11.2023
Documents cited:Search[XI]US2015257150  (YI YUNJUNG [KR], et al) [X] 1,13 * figures 21, 21A * * paragraphs [0259] - [0261] *[I] 14;
 [XI]US2016183290  (KO YOUNG JO [KR], et al) [X] 1,2,4,5,15 * paragraphs [0055] - [0057] * * paragraphs [0106] - [0108] * * figure 3 * * paragraphs [0112] - [0119] - [ 0123] * [I] 3,6,7;
 [XI]  - LG ELECTRONICS, "Remaining details for eMTC", vol. RAN WG1, no. St Julian's, Malta; 20160215 - 20160219, (20160214), 3GPP DRAFT; R1-160614 REL-13 EMTC REMAINING ISSUES_V1, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20160214), XP051053943 [X] 1,2,5,15 * pages 1-2 * [I] 3,4,6,7
 [XI]  - SAMSUNG, "Update on Summary of Collision Handling Aspects for LC/CE UEs", vol. RAN WG1, no. St Julians, Malta; 20160215 - 20160219, (20160224), 3GPP DRAFT; R1-161377 COLLISION HANDLING SUMMARY_V1, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_84/Docs/, (20160224), XP051079299 [X] 1,2,5,15 * pages 6, 7 * [I] 3,4,6,7
 [XAI]  - TSG RAN WG1, "Status Report to TSG 1 Work plan related evaluation", vol. TSG RAN, no. GÖTEBORG; 20160307 - 20160310, (20160306), 3GPP DRAFT; RP-160046 STATUS REPORT FOR FURTHER LTE PHYSICAL LAYER ENHANCEMENTS FOR MTC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/Docs/, (20160306), XP051076043 [X] 1,8,10 * page 4 * [A] 11 [I] 9
 [XI]  - CATT, "URLLC HARQ operation", vol. RAN WG1, no. Spokane, USA; 20170116 - 20170120, (20170116), 3GPP DRAFT; R1-1700205, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170116), XP051207744 [X] 8-10 * pages 1-2 * [I] 11
 [XI]  - ZTE ET AL, "Basic Grant-free Transmission for URLLC", vol. RAN WG1, no. Spokane, USA; 20170116 - 20170120, (20170116), 3GPP DRAFT; R1-1700253 BASIC GRANT-FREE TRANSMISSION FOR URLLC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170116), XP051207791 [X] 8 * page 4 * [I] 9
International search[A]US2014192767  (AU KELVIN KAR KIN [CA], et al)[A] 1-18;
 [YA]  - HUAWEI, "Grant-free transmission scheme for UL URLLC", Rl-1611689, 3GPP TSG RAN WG1 Meeting #87, Reno, USA, (20161105), XP051190092 [Y] 1-5, 12, 17-18 [A] 6-11, 13-16
 [Y]  - NOKIA, "Relationship between grant-free - and grant-based access", TSG RAN WG1 Meet ing Lisbon r1-1609655, Portugal, (20160930), XP051158535 [Y] 1-5, 12, 17-18
 [Y]  - NOKIA, "Grant-free to grant-based switching for URLLC", Rl-1612253, 3GPP TSG RAN WG1 Meeting #87, (20161105), XP051190367 [Y] 4-5, 12
 [Y]  - ERICSSON, "On Reference Signal Design for Grant-free Access", Rl-1612956, 3GPP TSG RAN WG1 Meeting #87, Reno USA, (20161104), XP051189566 [Y] 17
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.