EP3577321 - COATED FLANGE BOLT HOLE AND METHODS OF FORMING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.05.2023 Database last updated on 12.10.2024 | |
Former | The patent has been granted Status updated on 27.05.2022 | ||
Former | Grant of patent is intended Status updated on 27.01.2022 | ||
Former | Request for examination was made Status updated on 08.11.2019 | ||
Former | The international publication has been made Status updated on 11.08.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2019/50] | Inventor(s) | 01 /
PARTHASARATHY, Bala, Srinivasan 1 Research Circle Niskayuna, NY 12309 / US | 02 /
SUNDARARAJAN, Guruprasad Plot 122 Export Promotion Industrial Park Bangalore 560 066 Karnataka / IN | 03 /
DOLLEY, Evan, Jarrett 1 Research Circle Niskayuna, NY 12309 / US | 04 /
AJDELSZTAJN, Leonardo 1 Research Circle Niskayuna, NY 12309 / US | [2019/50] | Representative(s) | Openshaw & Co. 8 Castle Street Farnham, Surrey GU9 7HR / GB | [2019/50] | Application number, filing date | 18747567.8 | 17.01.2018 | [2019/50] | WO2018US14029 | Priority number, date | US201715425257 | 06.02.2017 Original published format: US201715425257 | [2019/50] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018144221 | Date: | 09.08.2018 | Language: | EN | [2018/32] | Type: | A1 Application with search report | No.: | EP3577321 | Date: | 11.12.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 09.08.2018 takes the place of the publication of the European patent application. | [2019/50] | Type: | B1 Patent specification | No.: | EP3577321 | Date: | 29.06.2022 | Language: | EN | [2022/26] | Search report(s) | International search report - published on: | KR | 09.08.2018 | (Supplementary) European search report - dispatched on: | EP | 17.11.2020 | Classification | IPC: | F01D25/28, F01D25/00, F04D29/64, B23P6/00, F04D29/52 | [2022/03] | CPC: |
F04D29/644 (EP,US);
B23P6/007 (EP);
F01D25/007 (EP,US);
F01D25/243 (EP,US);
F04D29/522 (EP,US);
F05D2230/311 (EP,US);
F05D2230/80 (EP,US)
(-)
|
Former IPC [2019/50] | F01D25/28, F01D25/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/50] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | BEDECKTE FLANSCHBOLZENÖFFNUNG UND VERFAHREN ZUR FORMUNG DAVON | [2019/50] | English: | COATED FLANGE BOLT HOLE AND METHODS OF FORMING THE SAME | [2019/50] | French: | TROU DE BOULON À BRIDE REVÊTU ET PROCÉDÉS DE FORMATION DE CELUI-CI | [2019/50] | Entry into regional phase | 06.09.2019 | National basic fee paid | 06.09.2019 | Search fee paid | 06.09.2019 | Designation fee(s) paid | 06.09.2019 | Examination fee paid | Examination procedure | 06.09.2019 | Examination requested [2019/50] | 19.05.2021 | Amendment by applicant (claims and/or description) | 28.01.2022 | Communication of intention to grant the patent | 23.05.2022 | Fee for grant paid | 23.05.2022 | Fee for publishing/printing paid | 23.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 30.03.2023 | No opposition filed within time limit [2023/23] | Fees paid | Renewal fee | 21.01.2020 | Renewal fee patent year 03 | 20.01.2021 | Renewal fee patent year 04 | 20.01.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 29.06.2022 | AT | 29.06.2022 | CZ | 29.06.2022 | DK | 29.06.2022 | EE | 29.06.2022 | ES | 29.06.2022 | FI | 29.06.2022 | HR | 29.06.2022 | IT | 29.06.2022 | LT | 29.06.2022 | LV | 29.06.2022 | MC | 29.06.2022 | NL | 29.06.2022 | PL | 29.06.2022 | RO | 29.06.2022 | RS | 29.06.2022 | SE | 29.06.2022 | SI | 29.06.2022 | SK | 29.06.2022 | SM | 29.06.2022 | BG | 29.09.2022 | NO | 29.09.2022 | GR | 30.09.2022 | IS | 29.10.2022 | PT | 31.10.2022 | IE | 17.01.2023 | LU | 17.01.2023 | BE | 31.01.2023 | CH | 31.01.2023 | LI | 31.01.2023 | [2024/29] |
Former [2024/11] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
IT | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
IE | 17.01.2023 | ||
LU | 17.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2024/08] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
IE | 17.01.2023 | ||
LU | 17.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/49] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
LU | 17.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/47] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
LU | 17.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/43] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
LU | 17.01.2023 | ||
Former [2023/37] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/22] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/21] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/17] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/12] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/11] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
PT | 31.10.2022 | ||
Former [2023/09] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
PT | 31.10.2022 | ||
Former [2023/08] | AT | 29.06.2022 | |
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2023/07] | AT | 29.06.2022 | |
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2023/02] | FI | 29.06.2022 | |
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2022/50] | FI | 29.06.2022 | |
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2022/49] | FI | 29.06.2022 | |
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2022/47] | FI | 29.06.2022 | |
LT | 29.06.2022 | ||
SE | 29.06.2022 | ||
NO | 29.09.2022 | Documents cited: | Search | [XAI]DE102009060756 (LUFTHANSA TECHNIK AG [DE]) [X] 1,2,4,7,8,10-12,14 * figure 2 * * paragraphs [0004] , [0015] * * paragraphs [0011] , [0046] - [0053] * * paragraphs [0021] - [0025] * [A] 3,5,6,13,15 [I] 9; | [X]US2012160664 (IVORY STEVEN [US], et al) [X] 1 * claim 1 ** paragraphs [0016] - [0020] * | International search | [A]JP2005180599 (KAYABA INDUSTRY CO LTD) [A] 1-20* See abstract and figure 2. *; | [Y]JP2013160298 (TOYOTA MOTOR CORP, et al) [Y] 1-20 * See abstract, paragraphs [0037]-[0044], and figures 1-4. *; | [A]US2013280524 (MABUCHI KATSUMI [JP]) [A] 1-20 * See paragraphs [0029]-[0030] and figures 1-2. *; | [A]JP2014055334 (JFE STEEL CORP) [A] 1-20 * See abstract and paragraphs [0013]-[0027]. *; | [Y]US8895887 (TRAPP TIMOTHY JOSEPH [US], et al) [Y] 1-20 * See column 2, lines 16-23, column 3, line 31 - column 4, line 67 and figures 1-4. * |