| EP3655077 - NEBULIZER AND CONTAINER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.02.2024 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 17.03.2023 | ||
| Former | Grant of patent is intended Status updated on 08.11.2022 | ||
| Former | Request for examination was made Status updated on 24.04.2020 | ||
| Former | The international publication has been made Status updated on 26.01.2019 | ||
| Former | unknown Status updated on 15.08.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Boehringer Ingelheim International GmbH Binger Strasse 173 55216 Ingelheim am Rhein / DE | [2020/22] | Inventor(s) | 01 /
WUTTKE, Gilbert Boehringer Ingelheim International GmbH Corporate Patents Binger Strasse 173 55216 Ingelheim am Rhein / DE | 02 /
GRAESSL, Herbert Oberer Hofberg 3 71540 Murrhardt / DE | 03 /
KLADDERS, Heinrich Boehringer Ingelheim International GmbH Corporate Patents Binger Strasse173 55216 Ingelheim am Rhein / DE | [2020/22] | Representative(s) | Lutze, Oliver, et al Boehringer Ingelheim International GmbH Binger Straße 173 55216 Ingelheim am Rhein / DE | [N/P] |
| Former [2020/22] | Simon, Elke Anna Maria, et al Boehringer Ingelheim GmbH Binger Strasse 173 55216 Ingelheim am Rhein / DE | Application number, filing date | 18749743.3 | 23.07.2018 | [2020/22] | WO2018EP69945 | Priority number, date | EP20170020316 | 21.07.2017 Original published format: EP 17020316 | WO2018EP69833 | 20.07.2018 Original published format: PCT/EP2018/069833 | [2020/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2019016409 | Date: | 24.01.2019 | Language: | EN | [2019/04] | Type: | A2 Application without search report | No.: | EP3655077 | Date: | 27.05.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.01.2019 takes the place of the publication of the European patent application. | [2020/22] | Type: | B1 Patent specification | No.: | EP3655077 | Date: | 19.04.2023 | Language: | EN | [2023/16] | Search report(s) | International search report - published on: | EP | 28.02.2019 | Classification | IPC: | A61M11/00, A61M15/00, B05B11/00 | [2022/47] | CPC: |
A61M11/007 (EP,IL,KR,US);
A61M15/002 (IL,US);
A61M15/0035 (IL,US);
A61M15/0065 (EP,IL,KR);
A61M15/0073 (EP,IL,KR,US);
A61M15/0081 (EP,IL,KR,US);
B05B11/026 (EP,IL);
B05B11/028 (EP,IL);
B05B11/108 (EP,IL,KR);
B05B11/1091 (EP,IL,KR);
B05B9/0822 (EP,IL,KR);
B05B9/0838 (EP,IL);
B65D51/16 (IL,KR);
A61M2039/2426 (IL,US);
A61M2202/0468 (EP,IL,KR);
|
| Former IPC [2020/22] | A61M15/00, A61J1/14, B05B11/00, A61M11/00, B65D51/16 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ZERSTÄUBER UND BEHÄLTER | [2020/22] | English: | NEBULIZER AND CONTAINER | [2020/22] | French: | NÉBULISEUR ET RÉCIPIENT | [2020/22] | Entry into regional phase | 17.02.2020 | National basic fee paid | 17.02.2020 | Designation fee(s) paid | 17.02.2020 | Examination fee paid | Examination procedure | 17.02.2020 | Examination requested [2020/22] | 17.02.2020 | Date on which the examining division has become responsible | 31.03.2020 | Amendment by applicant (claims and/or description) | 09.11.2022 | Communication of intention to grant the patent | 07.03.2023 | Fee for grant paid | 07.03.2023 | Fee for publishing/printing paid | 07.03.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | EP23160370.5 / EP4218867 | Opposition(s) | 22.01.2024 | No opposition filed within time limit [2024/13] | Fees paid | Renewal fee | 23.03.2020 | Renewal fee patent year 03 | 02.08.2021 | Renewal fee patent year 04 | 01.08.2022 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 23.07.2018 | HU | 23.07.2018 | AT | 19.04.2023 | BG | 19.04.2023 | CZ | 19.04.2023 | DK | 19.04.2023 | EE | 19.04.2023 | ES | 19.04.2023 | FI | 19.04.2023 | HR | 19.04.2023 | IT | 19.04.2023 | LT | 19.04.2023 | LV | 19.04.2023 | MC | 19.04.2023 | PL | 19.04.2023 | RO | 19.04.2023 | RS | 19.04.2023 | SE | 19.04.2023 | SI | 19.04.2023 | SK | 19.04.2023 | SM | 19.04.2023 | TR | 19.04.2023 | NO | 19.07.2023 | GR | 20.07.2023 | IE | 23.07.2023 | LU | 23.07.2023 | CH | 31.07.2023 | IS | 19.08.2023 | PT | 21.08.2023 | [2026/04] |
| Former [2025/39] | CY | 23.07.2018 | |
| HU | 23.07.2018 | ||
| AT | 19.04.2023 | ||
| BG | 19.04.2023 | ||
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| IT | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SI | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IE | 23.07.2023 | ||
| LU | 23.07.2023 | ||
| CH | 31.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2025/36] | CY | 23.07.2018 | |
| AT | 19.04.2023 | ||
| BG | 19.04.2023 | ||
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| IT | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SI | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IE | 23.07.2023 | ||
| LU | 23.07.2023 | ||
| CH | 31.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/51] | AT | 19.04.2023 | |
| BG | 19.04.2023 | ||
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| IT | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SI | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IE | 23.07.2023 | ||
| LU | 23.07.2023 | ||
| CH | 31.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/33] | AT | 19.04.2023 | |
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| IT | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SI | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IE | 23.07.2023 | ||
| LU | 23.07.2023 | ||
| CH | 31.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/26] | AT | 19.04.2023 | |
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| IT | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SI | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| LU | 23.07.2023 | ||
| CH | 31.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/24] | AT | 19.04.2023 | |
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SI | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| LU | 23.07.2023 | ||
| CH | 31.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/18] | AT | 19.04.2023 | |
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| LU | 23.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/14] | AT | 19.04.2023 | |
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| MC | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/10] | AT | 19.04.2023 | |
| CZ | 19.04.2023 | ||
| DK | 19.04.2023 | ||
| EE | 19.04.2023 | ||
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RO | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/08] | AT | 19.04.2023 | |
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| SK | 19.04.2023 | ||
| SM | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/03] | AT | 19.04.2023 | |
| ES | 19.04.2023 | ||
| FI | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2024/01] | AT | 19.04.2023 | |
| ES | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| LT | 19.04.2023 | ||
| LV | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2023/51] | AT | 19.04.2023 | |
| ES | 19.04.2023 | ||
| HR | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| RS | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2023/50] | AT | 19.04.2023 | |
| ES | 19.04.2023 | ||
| PL | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| GR | 20.07.2023 | ||
| IS | 19.08.2023 | ||
| PT | 21.08.2023 | ||
| Former [2023/48] | AT | 19.04.2023 | |
| ES | 19.04.2023 | ||
| SE | 19.04.2023 | ||
| NO | 19.07.2023 | ||
| PT | 21.08.2023 | ||
| Former [2023/46] | ES | 19.04.2023 | |
| PT | 21.08.2023 | Cited in | International search | [XDI] WO2016012102 (BOEHRINGER INGELHEIM INT et al.) | [AP] WO2017129477 (BOEHRINGER INGELHEIM INT et al.) | [A] WO2009103510 (BOEHRINGER INGELHEIM PHARMA et al.) | [AD] WO2010094305 (BOEHRINGER INGELHEIM INT et al.) | [A] EP1312418 (STEAG MICROPARTS GMBH et al.) | [A] WO2015169732 (BOEHRINGER INGELHEIM INT et al.) | [A] WO2017080895 (BOEHRINGER INGELHEIM INT et al.) | [A] FR2650763 (BEDOU PATRICK et al.) | [A] US3940030 (KONDO HIROSI et al.) | [A] US5267674 (VON SCHUCKMANN ALFRED et al.) | [A] WO2015132714 (CLEVER S R L et al.) [A] 1-29,36-40 * the whole document, and especially the figures * | [XDI] WO2015001281 (APTAR FRANCE SAS et al.) [XD] 1-7,10-17,19,20,22,24-27,29,36-40 * the whole document, and especially page 3 lines 4-29, page 8 line 34 to page 11 line 10, page 12 lines 12-18, page 19 line 15 to page 25 line 12, claims 1-9 and figures 4a, 4b, 6c, 12a and 12b *[I] 8,9,18,21,23,28 | by applicant | WO2009047173 | WO9606011 | WO0049988 | WO2010094305 | WO2016012102 | US3940030 | WO2012162305 | WO2009115200 | WO2004024340 | EP2614848 |