blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3669506

EP3669506 - STREAM CONTROL SYSTEM FOR USE IN A NETWORK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.03.2023
Database last updated on 29.10.2024
FormerThe patent has been granted
Status updated on  08.04.2022
FormerGrant of patent is intended
Status updated on  10.01.2022
FormerRequest for examination was made
Status updated on  22.05.2020
FormerThe international publication has been made
Status updated on  22.02.2019
Formerunknown
Status updated on  15.08.2018
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Koninklijke KPN N.V.
Wilhelminakade 123
3072 AP Rotterdam / NL
For all designated states
Nederlandse Organisatie voor toegepast- natuurwetenschappelijk Onderzoek TNO
Anna van Buerenplein 1
2595 DA Den Haag / NL
[2020/26]
Inventor(s)01 / D'ACUNTO, Lucia
Bagijnhof 106
2611 AS Delft / NL
02 / ZURANIEWSKI, Piotr, Wojciech
Thomas Jeffersonlaan 617
2285 AX Rijswijk / NL
03 / GUNKEL, Simon
Clarissenhof 49
1115 CB Duivendrecht / NL
04 / THOMAS, Emmanuel
Noorderhof 8
2611 WD Delft / NL
 [2020/26]
Representative(s)Wuyts, Koenraad Maria
Koninklijke KPN N.V.
Intellectual Property Group
P.O. Box 25110
3001 HC Rotterdam / NL
[2020/26]
Application number, filing date18749836.513.08.2018
[2020/26]
WO2018EP71897
Priority number, dateEP2017018613414.08.2017         Original published format: EP 17186134
EP2018018144503.07.2018         Original published format: EP 18181445
[2020/26]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019034591
Date:21.02.2019
Language:EN
[2019/08]
Type: A1 Application with search report 
No.:EP3669506
Date:24.06.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 21.02.2019 takes the place of the publication of the European patent application.
[2020/26]
Type: B1 Patent specification 
No.:EP3669506
Date:11.05.2022
Language:EN
[2022/19]
Search report(s)International search report - published on:EP21.02.2019
ClassificationIPC:H04L29/06
[2020/26]
CPC:
H04L65/80 (EP,US); H04N21/2662 (US); H04L65/1094 (EP);
H04L65/612 (EP,US); H04L65/752 (EP); H04L65/762 (EP);
H04L65/765 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/26]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:STREAM-STEUERUNGSSYSTEM ZUR VERWENDUNG IN EINEM NETZWERK[2020/26]
English:STREAM CONTROL SYSTEM FOR USE IN A NETWORK[2020/26]
French:SYSTÈME DE COMMANDE DE FLUX DESTINÉ À ÊTRE UTILISÉ DANS UN RÉSEAU[2021/47]
Former [2020/26]SYSTÈME DE CONTRÔLE DE FLUX DEVANT ÊTRE UTILISÉ DANS UN RÉSEAU
Entry into regional phase16.03.2020National basic fee paid 
16.03.2020Designation fee(s) paid 
16.03.2020Examination fee paid 
Examination procedure16.03.2020Examination requested  [2020/26]
16.03.2020Date on which the examining division has become responsible
29.10.2020Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
08.01.2021Amendment by applicant (claims and/or description)
11.01.2022Communication of intention to grant the patent
05.04.2022Fee for grant paid
05.04.2022Fee for publishing/printing paid
05.04.2022Receipt of the translation of the claim(s)
Divisional application(s)EP22169445.8  / EP4068734
Opposition(s)14.02.2023No opposition filed within time limit [2023/16]
Request for further processing for:11.01.2021Request for further processing filed
11.01.2021Full payment received (date of receipt of payment)
Request granted
21.01.2021Decision despatched
Fees paidRenewal fee
31.08.2020Renewal fee patent year 03
31.08.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.08.2018
AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
MK11.05.2022
MT11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IE13.08.2022
LU13.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
IS11.09.2022
PT12.09.2022
[2024/44]
Former [2024/27]HU13.08.2018
AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
MK11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IE13.08.2022
LU13.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
IS11.09.2022
PT12.09.2022
Former [2024/24]HU13.08.2018
AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IE13.08.2022
LU13.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
IS11.09.2022
PT12.09.2022
Former [2024/21]AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IE13.08.2022
LU13.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/42]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IE13.08.2022
LU13.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/33]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IE13.08.2022
LU13.08.2022
CH31.08.2022
LI31.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/25]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
LU13.08.2022
CH31.08.2022
LI31.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/21]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
LU13.08.2022
CH31.08.2022
LI31.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/17]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/16]AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/09]AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/07]AT11.05.2022
DK11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
PL11.05.2022
RS11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2022/51]AT11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
PL11.05.2022
RS11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2022/50]AT11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
PL11.05.2022
RS11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
PT12.09.2022
Former [2022/49]AT11.05.2022
ES11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
PT12.09.2022
Former [2022/47]AT11.05.2022
ES11.05.2022
LT11.05.2022
NO11.08.2022
PT12.09.2022
Cited inInternational search[X]US2013138828  (STRASMAN NERY [IL], et al) [X] 1-14 * paragraph [0087] - paragraph [0184]; figure 3 *;
 [X]US2015156243  (SKOG ROBERT [SE], et al) [X] 1-14 * abstract * * paragraph [0025] - paragraph [0030] * * paragraph [0045] * * paragraph [0059] - paragraph [0076] *;
 [A]US2016142902  (RAMAMURTHI VISHWANATH [US], et al) [A] 1-14 * abstract ** paragraph [0042] - paragraph [0048] *
by applicantWO2014147538
    - "Delivering stable high-quality video: an SDN architecture with DASH assisting network elements", JAN WILLEM KLEINROUWELER; SERGIO CABRERO; PABLO CESAR, Proceedings of the 7th International Conference on Multimedia Systems (MMSys '16, ACM, (20160000), page 10
    - JAMES NIGHTINGALE; QI WANG; JOSE M. ALCARAZ CALERO; ENRIQUE CHIRIVELLA-PEREZ; MARIAN ULBRICHT; JESUS A. ALONSO-LOPEZ; RICARDO PRET, "QoE-Driven, Energy-Aware Video Adaptation in 5G Networks: The SELFNET Self-Optimisation Use Case", International Journal of Distributed Sensor Networks, vol. 12, no. 1, (20160000), URL: http://dx.doi.org/10.1155/2016/7829305
    - "Towards network-wide QoE fairness using openflow-assisted adaptive video streaming", PANAGIOTIS GEORGOPOULOS; YEHIA ELKHATIB; MATTHEW BROADBENT; MU MU; NICHOLAS RACE, Proceedings of the 2013 ACM SIGCOMM workshop on Future human-centric multimedia networking (FhMN '13, ACM, (20130000), pages 15 - 20
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.