EP3529896 - CIRCUIT AND METHOD FOR FACILITATING STARTUP TIME OF CRYSTAL OSCILLATOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.09.2021 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 25.09.2020 | ||
Former | Grant of patent is intended Status updated on 27.05.2020 | ||
Former | Request for examination was made Status updated on 26.07.2019 | ||
Former | The international publication has been made Status updated on 05.07.2019 | ||
Former | unknown Status updated on 21.09.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Shenzhen Goodix Technology Co., Ltd. Floor 13, Phase B, Tengfei Industrial Building Futian Free Trade Zone Shenzhen, Guangdong 518045 / CN | [2019/35] | Inventor(s) | 01 /
ABUELLIL, Amr Floor 13, Phase B, Tengfei Industrial Building Futian Free Trade Zone Shenzhen, Guangdong 518045 / CN | 02 /
SIVASUBRAMANIAM, Janakan Floor 13, Phase B, Tengfei Industrial Building Futian Free Trade Zone Shenzhen, Guangdong 518045 / CN | [2019/35] | Representative(s) | Pfenning, Meinig & Partner mbB Patent- und Rechtsanwälte Theresienhöhe 11a 80339 München / DE | [2019/35] | Application number, filing date | 18765790.3 | 03.08.2018 | [2019/35] | WO2018CN98614 | Priority number, date | US201715853942 | 25.12.2017 Original published format: US201715853942 | [2019/35] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019128235 | Date: | 04.07.2019 | Language: | EN | [2019/27] | Type: | A1 Application with search report | No.: | EP3529896 | Date: | 28.08.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.07.2019 takes the place of the publication of the European patent application. | [2019/35] | Type: | B1 Patent specification | No.: | EP3529896 | Date: | 28.10.2020 | Language: | EN | [2020/44] | Search report(s) | International search report - published on: | CN | 04.07.2019 | (Supplementary) European search report - dispatched on: | EP | 25.11.2019 | Classification | IPC: | H03K3/03, H03B5/06, H03B5/36, H03B29/00 | [2019/52] | CPC: |
H03B29/00 (EP,US);
H03B7/00 (CN);
H03B5/36 (US);
H03B1/02 (CN);
H03B5/06 (EP,US);
H03B5/364 (EP,US);
H03K3/0307 (EP);
H03L3/00 (US);
H03B2200/0074 (US);
H03B2200/0094 (EP,US)
(-)
|
Former IPC [2019/35] | H03K3/013 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/35] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SCHALTUNG UND VERFAHREN ZUR ERLEICHTERUNG DER STARTZEIT EINES KRISTALLOSZILLATORS | [2019/35] | English: | CIRCUIT AND METHOD FOR FACILITATING STARTUP TIME OF CRYSTAL OSCILLATOR | [2019/35] | French: | CIRCUIT ET PROCÉDÉ DESTINÉS À FACILITER LE TEMPS DE DÉMARRAGE D'UN OSCILLATEUR À QUARTZ | [2019/35] | Entry into regional phase | 20.09.2018 | National basic fee paid | 20.09.2018 | Search fee paid | 20.09.2018 | Designation fee(s) paid | 20.09.2018 | Examination fee paid | Examination procedure | 20.09.2018 | Examination requested [2019/35] | 28.02.2020 | Amendment by applicant (claims and/or description) | 28.05.2020 | Communication of intention to grant the patent | 09.09.2020 | Fee for grant paid | 09.09.2020 | Fee for publishing/printing paid | 09.09.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 29.07.2021 | No opposition filed within time limit [2021/40] | Fees paid | Renewal fee | 28.08.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.08.2018 | AL | 28.10.2020 | AT | 28.10.2020 | CY | 28.10.2020 | CZ | 28.10.2020 | DK | 28.10.2020 | EE | 28.10.2020 | ES | 28.10.2020 | FI | 28.10.2020 | HR | 28.10.2020 | IT | 28.10.2020 | LT | 28.10.2020 | LV | 28.10.2020 | MC | 28.10.2020 | MK | 28.10.2020 | NL | 28.10.2020 | PL | 28.10.2020 | RO | 28.10.2020 | RS | 28.10.2020 | SE | 28.10.2020 | SI | 28.10.2020 | SK | 28.10.2020 | SM | 28.10.2020 | BG | 28.01.2021 | NO | 28.01.2021 | GR | 29.01.2021 | IS | 28.02.2021 | PT | 01.03.2021 | [2024/23] |
Former [2023/33] | HU | 03.08.2018 | |
AL | 28.10.2020 | ||
AT | 28.10.2020 | ||
CY | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2023/30] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CY | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2022/23] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2022/18] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
PT | 01.03.2021 | ||
Former [2022/10] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
PT | 01.03.2021 | ||
Former [2021/50] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/48] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/45] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/37] | AT | 28.10.2020 | |
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/36] | AT | 28.10.2020 | |
CZ | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/35] | AT | 28.10.2020 | |
CZ | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/33] | AT | 28.10.2020 | |
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/32] | AT | 28.10.2020 | |
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/30] | AT | 28.10.2020 | |
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/28] | AT | 28.10.2020 | |
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LV | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/25] | AT | 28.10.2020 | |
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
LV | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/23] | AT | 28.10.2020 | |
FI | 28.10.2020 | ||
LV | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
PT | 01.03.2021 | ||
Former [2021/22] | FI | 28.10.2020 | |
RS | 28.10.2020 | ||
NO | 28.01.2021 | ||
PT | 01.03.2021 | ||
Former [2021/21] | FI | 28.10.2020 | |
PT | 01.03.2021 | ||
Former [2021/20] | FI | 28.10.2020 | Documents cited: | Search | [A]US2011037527 (SHRIVASTAVA AATMESH [IN], et al) [A] 1-20 * paragraphs [0034] , [0035] , [0041]; figure 4 *; | [A]KR20110114961 (SAMSUNG ELECTRO MECH [KR]) [A] 1-20 * paragraphs [0025] , [0026] , [0028] , [0029] , [0030]; figure 2 *; | [A]US9000852 (SINITSKY DENNIS [US], et al) [A] 1-20 * column 2, line 26 - column 3, line 38; figure 1 *; | [A] - ESMAEELZADEH HANI ET AL, "A precisely-timed energy injection technique achieving 58/10/2[mu]s start-up in 1.84/10/50MHz crystal oscillators", 2017 IEEE CUSTOM INTEGRATED CIRCUITS CONFERENCE (CICC), IEEE, (20170430), doi:10.1109/CICC.2017.7993605, pages 1 - 4, XP033130538 [A] 1-20 * page 2, paragraph II. - page 3; figure 3 * DOI: http://dx.doi.org/10.1109/CICC.2017.7993605 | International search | [A]US2010211372 (TROEDSSON NIKLAS [US]) [A] 1-20 * the whole document *; | [A]JP2011124849 (ASAHI KASEI DENSHI KK) [A] 1-20* the whole document *; | [A]US8237513 (MUENCH PAUL D [US], et al) [A] 1-20 * the whole document *; | [A]US8805905 (HARS LASZLO [US]) [A] 1-20 * the whole document *; | [A]CN104104361 (FREESCALE SEMICONDUCTOR INC) [A] 1-20 * description, paragraphs [0003]-[0004], [0018]-[0022] and figures 1-2 * |