EP3595499 - METHOD FOR INDIVIDUALLY ADJUSTING OUTPUT WATER TEMPERATURE IN A DEVICE COMPRISING MULTIPLE OUTLETS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.12.2022 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 24.12.2021 | ||
Former | Grant of patent is intended Status updated on 22.11.2021 | ||
Former | Request for examination was made Status updated on 20.12.2019 | ||
Former | The international publication has been made Status updated on 22.09.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Orbital Systems AB Hans Michelsensgatan 10A 211 20 Malmö / SE | [2020/04] | Inventor(s) | 01 /
RIDELL, Michael Ringdansvägen 53 245 42 Staffansdorp / SE | [2020/04] | Representative(s) | AWA Sweden AB Box 5117 200 71 Malmö / SE | [N/P] |
Former [2020/04] | AWA Sweden AB P.O. Box 5117 200 71 Malmö / SE | Application number, filing date | 18768447.7 | 12.03.2018 | [2020/04] | WO2018SE50234 | Priority number, date | SE20170050307 | 15.03.2017 Original published format: SE 1750307 | [2020/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018169474 | Date: | 20.09.2018 | Language: | EN | [2018/38] | Type: | A1 Application with search report | No.: | EP3595499 | Date: | 22.01.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.09.2018 takes the place of the publication of the European patent application. | [2020/04] | Type: | B1 Patent specification | No.: | EP3595499 | Date: | 26.01.2022 | Language: | EN | [2022/04] | Search report(s) | International search report - published on: | SE | 20.09.2018 | (Supplementary) European search report - dispatched on: | EP | 17.12.2020 | Classification | IPC: | A47K3/28, E03B1/04, E03C1/04 | [2020/04] | CPC: |
E03C1/00 (EP);
E03B1/041 (EP,KR,US);
E03C1/041 (KR,US);
A47K3/28 (KR);
C02F2209/02 (US);
E03B2001/045 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR INDIVIDUELLEN EINSTELLUNG DER AUSGANGWASSERTEMPERATUR IN EINER VORRICHTUNG MIT MEHREREN AUSGÄNGEN | [2020/04] | English: | METHOD FOR INDIVIDUALLY ADJUSTING OUTPUT WATER TEMPERATURE IN A DEVICE COMPRISING MULTIPLE OUTLETS | [2020/04] | French: | PROCÉDÉ DE RÉGLAGE INDIVIDUEL DE LA TEMPÉRATURE D'EAU DE SORTIE DANS UN DISPOSITIF COMPRENANT DE MULTIPLES SORTIES | [2020/04] | Entry into regional phase | 16.09.2019 | National basic fee paid | 16.09.2019 | Search fee paid | 16.09.2019 | Designation fee(s) paid | 16.09.2019 | Examination fee paid | Examination procedure | 16.09.2019 | Examination requested [2020/04] | 23.11.2021 | Communication of intention to grant the patent | 21.12.2021 | Fee for grant paid | 21.12.2021 | Fee for publishing/printing paid | 21.12.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 27.10.2022 | No opposition filed within time limit [2023/01] | Fees paid | Renewal fee | 18.02.2020 | Renewal fee patent year 03 | 15.02.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.03.2018 | AL | 26.01.2022 | AT | 26.01.2022 | CY | 26.01.2022 | CZ | 26.01.2022 | DK | 26.01.2022 | EE | 26.01.2022 | ES | 26.01.2022 | FI | 26.01.2022 | HR | 26.01.2022 | IT | 26.01.2022 | LT | 26.01.2022 | LV | 26.01.2022 | MC | 26.01.2022 | MK | 26.01.2022 | MT | 26.01.2022 | NL | 26.01.2022 | PL | 26.01.2022 | RO | 26.01.2022 | RS | 26.01.2022 | SE | 26.01.2022 | SI | 26.01.2022 | SK | 26.01.2022 | SM | 26.01.2022 | IE | 12.03.2022 | LU | 12.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | LI | 31.03.2022 | BG | 26.04.2022 | NO | 26.04.2022 | GR | 27.04.2022 | IS | 26.05.2022 | PT | 26.05.2022 | [2024/44] |
Former [2024/24] | HU | 12.03.2018 | |
AL | 26.01.2022 | ||
AT | 26.01.2022 | ||
CY | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
MK | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
IE | 12.03.2022 | ||
LU | 12.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2024/23] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CY | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
MK | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
IE | 12.03.2022 | ||
LU | 12.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2024/20] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CY | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
IE | 12.03.2022 | ||
LU | 12.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/35] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
IE | 12.03.2022 | ||
LU | 12.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/10] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
IE | 12.03.2022 | ||
LU | 12.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/09] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
IE | 12.03.2022 | ||
LU | 12.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/08] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
IE | 12.03.2022 | ||
LU | 12.03.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/01] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/49] | AT | 26.01.2022 | |
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/48] | AT | 26.01.2022 | |
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/47] | AT | 26.01.2022 | |
DK | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/46] | AT | 26.01.2022 | |
DK | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/42] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/39] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/36] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/35] | ES | 26.01.2022 | |
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
NL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/34] | ES | 26.01.2022 | |
LT | 26.01.2022 | ||
NL | 26.01.2022 | ||
NO | 26.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/33] | LT | 26.01.2022 | |
NL | 26.01.2022 | ||
NO | 26.04.2022 | ||
Former [2022/30] | NL | 26.01.2022 | Documents cited: | Search | [A]GB2497264 (LEE MARK [GB]) [A] 1 * figures 1,2 *; | [AP]WO2017111600 (HAMWELLS HOLDING B V [NL]) [AP] 1 * figures 1,2 *; | [AP]WO2017111593 (HAMWELLS HOLDING B V [NL]) [AP] 1* figure 1 * | International search | [A]US4359789 (ROBERTS GEORGE C) [A] 1-10 * ; abstract; column 1, line 9 - line 14; column 5, line 50 - line 64; column 6, line 21 - line 33; column 6, line 52 -line 68; figure 2 *; | [A]US5564462 (STORCH PAUL [US]) [A] 1-10* ; abstract; column 3, line 39 - line 50; column 6, line 23 -line 32; figure 1; claim 1 *; | [A]US5913614 (SMITH JAMES ANDREW [CA], et al) [A] 1-10 * ; abstract; column 3, line 58 - column 4, line 16; figure 1 *; | [A]US6286764 (GARVEY EDWARD C [US], et al) [A] 1-10 * ; abstract; column 16, line 58 -column 17, line 8; figure 5 *; | [A]US2006022062 (MORRIS DAVID L [US]) [A] 1-10 * ; abstract; paragraph [0047] *; | [A]US2008196156 (BREWIN PETER [GB]) [A] 1-10 * ; abstract; paragraphs [0045]-[0050]; figures 1-2 * |