| EP3649492 - METHOD FOR CALIBRATING A MAGNETIC LOCATOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.06.2023 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 22.07.2022 | ||
| Former | Grant of patent is intended Status updated on 12.05.2022 | ||
| Former | Request for examination was made Status updated on 10.04.2020 | ||
| Former | The international publication has been made Status updated on 12.01.2019 | ||
| Former | unknown Status updated on 03.10.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states MinMaxMedical 5 Avenue du Grand Sablon 38700 La Tronche / FR | [2020/20] | Inventor(s) | 01 /
CHAVE, Mickaël 9 rue des Alpes 38120 Saint Egreve / FR | 02 /
HUGUEL, Loïc 400 rue Félix Faure 38950 Saint Martin Le Vinoux / FR | 03 /
ROUSSEAU, Sandra 28 route de Lyon 38000 Grenoble / FR | [2020/32] |
| Former [2020/20] | 01 /
CHAVE, Mickaël 9 rue des Alpes 38120 Saint Egreve / FR | ||
| 02 /
HUGUEL, Loïc 36 rue Menon 38000 Grenoble / FR | |||
| 03 /
ROUSSEAU, Sandra 28 route de Lyon 38000 Grenoble / FR | Representative(s) | Regimbeau 20, rue de Chazelles 75847 Paris Cedex 17 / FR | [2020/20] | Application number, filing date | 18773509.7 | 05.07.2018 | [2020/20] | WO2018FR51688 | Priority number, date | FR20170056376 | 06.07.2017 Original published format: FR 1756376 | [2020/20] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2019008284 | Date: | 10.01.2019 | Language: | FR | [2019/02] | Type: | A1 Application with search report | No.: | EP3649492 | Date: | 13.05.2020 | Language: | FR | The application published by WIPO in one of the EPO official languages on 10.01.2019 takes the place of the publication of the European patent application. | [2020/20] | Type: | B1 Patent specification | No.: | EP3649492 | Date: | 24.08.2022 | Language: | FR | [2022/34] | Search report(s) | International search report - published on: | EP | 10.01.2019 | Classification | IPC: | G01V13/00, G01V3/10, G01S5/02 | [2020/20] | CPC: |
G01V13/00 (EP);
G01D18/00 (US);
G01B11/14 (US);
G01D5/20 (US);
G01V3/10 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR KALIBRIERUNG EINES MAGNETISCHEN ORTUNGSGERÄTES | [2020/20] | English: | METHOD FOR CALIBRATING A MAGNETIC LOCATOR | [2020/20] | French: | PROCEDE DE CALIBRATION D'UN LOCALISATEUR MAGNETIQUE | [2020/20] | Entry into regional phase | 05.02.2020 | National basic fee paid | 05.02.2020 | Designation fee(s) paid | 05.02.2020 | Examination fee paid | Examination procedure | 05.02.2020 | Examination requested [2020/20] | 05.02.2020 | Date on which the examining division has become responsible | 26.08.2020 | Amendment by applicant (claims and/or description) | 13.05.2022 | Communication of intention to grant the patent | 15.07.2022 | Fee for grant paid | 15.07.2022 | Fee for publishing/printing paid | 15.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 25.05.2023 | No opposition filed within time limit [2023/31] | Fees paid | Renewal fee | 05.02.2020 | Renewal fee patent year 03 | 26.07.2021 | Renewal fee patent year 04 | 27.06.2022 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 05.07.2018 | HU | 05.07.2018 | AL | 24.08.2022 | AT | 24.08.2022 | BG | 24.08.2022 | CZ | 24.08.2022 | DK | 24.08.2022 | EE | 24.08.2022 | ES | 24.08.2022 | FI | 24.08.2022 | HR | 24.08.2022 | IT | 24.08.2022 | LT | 24.08.2022 | LV | 24.08.2022 | MC | 24.08.2022 | NL | 24.08.2022 | PL | 24.08.2022 | RO | 24.08.2022 | RS | 24.08.2022 | SE | 24.08.2022 | SI | 24.08.2022 | SK | 24.08.2022 | SM | 24.08.2022 | TR | 24.08.2022 | NO | 24.11.2022 | GR | 25.11.2022 | IS | 24.12.2022 | PT | 26.12.2022 | [2026/04] |
| Former [2025/39] | CY | 05.07.2018 | |
| HU | 05.07.2018 | ||
| AL | 24.08.2022 | ||
| AT | 24.08.2022 | ||
| BG | 24.08.2022 | ||
| CZ | 24.08.2022 | ||
| DK | 24.08.2022 | ||
| EE | 24.08.2022 | ||
| ES | 24.08.2022 | ||
| FI | 24.08.2022 | ||
| HR | 24.08.2022 | ||
| IT | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| MC | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RO | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| SI | 24.08.2022 | ||
| SK | 24.08.2022 | ||
| SM | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2025/36] | CY | 05.07.2018 | |
| AL | 24.08.2022 | ||
| AT | 24.08.2022 | ||
| BG | 24.08.2022 | ||
| CZ | 24.08.2022 | ||
| DK | 24.08.2022 | ||
| EE | 24.08.2022 | ||
| ES | 24.08.2022 | ||
| FI | 24.08.2022 | ||
| HR | 24.08.2022 | ||
| IT | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| MC | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RO | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| SI | 24.08.2022 | ||
| SK | 24.08.2022 | ||
| SM | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2024/51] | AL | 24.08.2022 | |
| AT | 24.08.2022 | ||
| BG | 24.08.2022 | ||
| CZ | 24.08.2022 | ||
| DK | 24.08.2022 | ||
| EE | 24.08.2022 | ||
| ES | 24.08.2022 | ||
| FI | 24.08.2022 | ||
| HR | 24.08.2022 | ||
| IT | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| MC | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RO | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| SI | 24.08.2022 | ||
| SK | 24.08.2022 | ||
| SM | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2024/26] | AL | 24.08.2022 | |
| AT | 24.08.2022 | ||
| CZ | 24.08.2022 | ||
| DK | 24.08.2022 | ||
| EE | 24.08.2022 | ||
| ES | 24.08.2022 | ||
| FI | 24.08.2022 | ||
| HR | 24.08.2022 | ||
| IT | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| MC | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RO | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| SI | 24.08.2022 | ||
| SK | 24.08.2022 | ||
| SM | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2024/14] | AL | 24.08.2022 | |
| AT | 24.08.2022 | ||
| CZ | 24.08.2022 | ||
| DK | 24.08.2022 | ||
| EE | 24.08.2022 | ||
| ES | 24.08.2022 | ||
| FI | 24.08.2022 | ||
| HR | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| MC | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RO | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| SI | 24.08.2022 | ||
| SK | 24.08.2022 | ||
| SM | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2023/37] | AL | 24.08.2022 | |
| AT | 24.08.2022 | ||
| CZ | 24.08.2022 | ||
| DK | 24.08.2022 | ||
| EE | 24.08.2022 | ||
| ES | 24.08.2022 | ||
| FI | 24.08.2022 | ||
| HR | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RO | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| SI | 24.08.2022 | ||
| SK | 24.08.2022 | ||
| SM | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2023/29] | AL | 24.08.2022 | |
| AT | 24.08.2022 | ||
| CZ | 24.08.2022 | ||
| DK | 24.08.2022 | ||
| EE | 24.08.2022 | ||
| ES | 24.08.2022 | ||
| FI | 24.08.2022 | ||
| HR | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RO | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| SK | 24.08.2022 | ||
| SM | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2023/23] | AT | 24.08.2022 | |
| CZ | 24.08.2022 | ||
| DK | 24.08.2022 | ||
| EE | 24.08.2022 | ||
| ES | 24.08.2022 | ||
| FI | 24.08.2022 | ||
| HR | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RO | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| SK | 24.08.2022 | ||
| SM | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2023/22] | AT | 24.08.2022 | |
| CZ | 24.08.2022 | ||
| DK | 24.08.2022 | ||
| ES | 24.08.2022 | ||
| FI | 24.08.2022 | ||
| HR | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RO | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| SM | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2023/21] | DK | 24.08.2022 | |
| FI | 24.08.2022 | ||
| HR | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| SM | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2023/20] | FI | 24.08.2022 | |
| HR | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| SM | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2023/12] | FI | 24.08.2022 | |
| HR | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| IS | 24.12.2022 | ||
| PT | 26.12.2022 | ||
| Former [2023/11] | FI | 24.08.2022 | |
| HR | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| PL | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| PT | 26.12.2022 | ||
| Former [2023/10] | FI | 24.08.2022 | |
| HR | 24.08.2022 | ||
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| GR | 25.11.2022 | ||
| PT | 26.12.2022 | ||
| Former [2023/09] | FI | 24.08.2022 | |
| LT | 24.08.2022 | ||
| LV | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| NO | 24.11.2022 | ||
| PT | 26.12.2022 | ||
| Former [2023/08] | FI | 24.08.2022 | |
| LT | 24.08.2022 | ||
| NL | 24.08.2022 | ||
| RS | 24.08.2022 | ||
| SE | 24.08.2022 | ||
| NO | 24.11.2022 | Cited in | International search | [A] US2017176623 (APPLEBY RODNEY et al.) [A] 1-9 * figures 1-3 * * paragraphs [0117] - [0123] - [0136] , [0137] , [0161] - [0163] - [0183] - [0199] * | [A] US8635043 (OLSSON MARK S et al.) [A] 1-9 * figures 1-3 * * column 1, line 33 - line 41 * * column 2, line 53 - line 63 * * column 3, line 27 - line 41 * * column 5, line 3 - line 32 * | [A] US5066917 (STOLARCZYK LARRY G et al.) [A] 1-9 * figures 1,4,10,13,15 * * column 3, line 50 - line 63 * * column 6, line 26 - column 7, line 27 * * column 15, line 27 - column 16, line 7 * * column 18, line 8 - line 38 * * column 18, line 58 - column 20, line 19 * | [A] ZIKMUND A ET AL: "Calibration of the 3-D Coil System's Orthogonality", IEEE TRANSACTIONS ON MAGNETICS, IEEE SERVICE CENTER, NEW YORK, NY, US, vol. 49, no. 1, 1 January 2013 (2013-01-01), pages 66 - 68, XP011483184, ISSN: 0018-9464, DOI: 10.1109/TMAG.2012.2218583 [A] 1-9 * page 66 - page 68 * DOI: http://dx.doi.org/10.1109/TMAG.2012.2218583 |