EP3684322 - PHARMACEUTICAL MANUFACTURING INSTALLATION AND METHOD OF MANUFACTURING OF A PHARMACEUTICAL PRODUCT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.02.2023 Database last updated on 15.11.2024 | |
Former | The patent has been granted Status updated on 18.03.2022 | ||
Former | Grant of patent is intended Status updated on 01.11.2021 | ||
Former | Request for examination was made Status updated on 24.09.2021 | ||
Former | Grant of patent is intended Status updated on 25.05.2021 | ||
Former | Request for examination was made Status updated on 26.06.2020 | ||
Former | The international publication has been made Status updated on 30.03.2019 | ||
Former | unknown Status updated on 05.10.2018 | Most recent event Tooltip | 15.11.2024 | Change - lapse in a contracting state Updated state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states F. Hoffmann-La Roche AG Grenzacherstrasse 124 4070 Basel / CH | [2020/31] | Inventor(s) | 01 /
SIBIK, Juraj c/o F. Hoffmann-La Roche AG Grenzacherstrasse 124 4070 Basel / CH | 02 /
CHALUS, Pascal c/o F. Hoffmann-La Roche AG Grenzacherstrasse 124 4070 Basel / CH | [2020/31] | Representative(s) | Latscha Schöllhorn Partner AG Grellingerstrasse 60 4052 Basel / CH | [2020/31] | Application number, filing date | 18773748.1 | 20.09.2018 | [2020/31] | WO2018EP75415 | Priority number, date | EP20170192423 | 21.09.2017 Original published format: EP 17192423 | [2020/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019057802 | Date: | 28.03.2019 | Language: | EN | [2019/13] | Type: | A1 Application with search report | No.: | EP3684322 | Date: | 29.07.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.03.2019 takes the place of the publication of the European patent application. | [2020/31] | Type: | B1 Patent specification | No.: | EP3684322 | Date: | 20.04.2022 | Language: | EN | [2022/16] | Search report(s) | International search report - published on: | EP | 28.03.2019 | Classification | IPC: | A61J3/10, G01N27/22, G01N33/15 | [2020/31] | CPC: |
A61J3/10 (EP,US);
B30B11/005 (US);
G01N21/9508 (US);
G01N27/221 (EP,US);
G01N33/15 (EP,US);
B30B11/006 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/31] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | PHARMAZEUTISCHE PRODUKTIONSEINRICHTUNG UND VERFAHREN ZUR HERSTELLUNG EINES PHARMAZEUTISCHEN PRODUKTS | [2020/31] | English: | PHARMACEUTICAL MANUFACTURING INSTALLATION AND METHOD OF MANUFACTURING OF A PHARMACEUTICAL PRODUCT | [2020/31] | French: | INSTALLATION DE FABRICATION PHARMACEUTIQUE ET PROCÉDÉ DE FABRICATION D'UN PRODUIT PHARMACEUTIQUE | [2020/31] | Entry into regional phase | 20.04.2020 | National basic fee paid | 20.04.2020 | Designation fee(s) paid | 20.04.2020 | Examination fee paid | Examination procedure | 20.04.2020 | Examination requested [2020/31] | 20.04.2020 | Date on which the examining division has become responsible | 05.11.2020 | Amendment by applicant (claims and/or description) | 26.05.2021 | Communication of intention to grant the patent | 23.09.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 02.11.2021 | Communication of intention to grant the patent | 11.03.2022 | Fee for grant paid | 11.03.2022 | Fee for publishing/printing paid | 11.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 23.01.2023 | No opposition filed within time limit [2023/13] | Fees paid | Renewal fee | 24.09.2020 | Renewal fee patent year 03 | 22.09.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.09.2018 | AL | 20.04.2022 | AT | 20.04.2022 | BG | 20.04.2022 | CY | 20.04.2022 | CZ | 20.04.2022 | DK | 20.04.2022 | EE | 20.04.2022 | ES | 20.04.2022 | FI | 20.04.2022 | HR | 20.04.2022 | IT | 20.04.2022 | LT | 20.04.2022 | LV | 20.04.2022 | MC | 20.04.2022 | MK | 20.04.2022 | MT | 20.04.2022 | NL | 20.04.2022 | PL | 20.04.2022 | RO | 20.04.2022 | RS | 20.04.2022 | SE | 20.04.2022 | SI | 20.04.2022 | SK | 20.04.2022 | SM | 20.04.2022 | NO | 20.07.2022 | GR | 21.07.2022 | IS | 20.08.2022 | PT | 22.08.2022 | IE | 20.09.2022 | LU | 20.09.2022 | BE | 30.09.2022 | [2024/51] |
Former [2024/44] | HU | 20.09.2018 | |
AL | 20.04.2022 | ||
AT | 20.04.2022 | ||
CY | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
MK | 20.04.2022 | ||
MT | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
IE | 20.09.2022 | ||
LU | 20.09.2022 | ||
BE | 30.09.2022 | ||
Former [2024/27] | HU | 20.09.2018 | |
AL | 20.04.2022 | ||
AT | 20.04.2022 | ||
CY | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
MK | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
IE | 20.09.2022 | ||
LU | 20.09.2022 | ||
BE | 30.09.2022 | ||
Former [2024/24] | HU | 20.09.2018 | |
AL | 20.04.2022 | ||
AT | 20.04.2022 | ||
CY | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
IE | 20.09.2022 | ||
LU | 20.09.2022 | ||
BE | 30.09.2022 | ||
Former [2024/21] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CY | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
IE | 20.09.2022 | ||
LU | 20.09.2022 | ||
BE | 30.09.2022 | ||
Former [2024/11] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
IE | 20.09.2022 | ||
LU | 20.09.2022 | ||
BE | 30.09.2022 | ||
Former [2023/42] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
IE | 20.09.2022 | ||
LU | 20.09.2022 | ||
BE | 30.09.2022 | ||
Former [2023/33] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
IE | 20.09.2022 | ||
LU | 20.09.2022 | ||
Former [2023/30] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
LU | 20.09.2022 | ||
Former [2023/25] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/22] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/17] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/09] | AT | 20.04.2022 | |
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/07] | AT | 20.04.2022 | |
DK | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2022/51] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2022/50] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
PT | 22.08.2022 | ||
Former [2022/49] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
PT | 22.08.2022 | ||
Former [2022/47] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
LT | 20.04.2022 | ||
NL | 20.04.2022 | ||
SE | 20.04.2022 | ||
NO | 20.07.2022 | ||
PT | 22.08.2022 | ||
Former [2022/44] | NL | 20.04.2022 | Cited in | International search | [A]DE2502098 (KILIAN & CO GMBH) [A] 1-39 * page 3, lines 9-11; figures 1-3 * * page 4, lines 1-8 * * page 9, lines 14-18 * * page 10, lines 3-10, 24-25 *; | [A]US5135113 (MAYER DANIEL W [US], et al) [A] 1-39 * column 4, lines 42-43 * * column 5, lines 59-62 *; | [A]US2003059614 (SADEK HANI [US], et al) [A] 1,24* paragraphs [0104] - [0105]; figure 13 *; | [A]US2009026373 (MERTENS RICHARD [DE], et al) [A] 1-39 * paragraphs [0002] , [0037] , [0038] *; | [A]US2009237090 (ALIMI YOUSEF [US], et al) [A] 1,24 * paragraphs [0006] , [0036]; figures 1,2a,2b,4 * |