| EP3672791 - MANUFACTURING MODULE FOR THE MANUFACTURE OF OPHTHALMIC LENSES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.05.2024 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 26.05.2023 | ||
| Former | Grant of patent is intended Status updated on 18.01.2023 | ||
| Former | Request for examination was made Status updated on 29.05.2020 | ||
| Former | The international publication has been made Status updated on 02.03.2019 | ||
| Former | unknown Status updated on 06.10.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states ALCON INC. Rue Louis-d'Affry 6 1701 Fribourg / CH | [2020/27] | Inventor(s) | 01 /
ZONG, Shu c/o Ciba Vision GmbH Postfach 4 63868 Grosswallstadt / DE | 02 /
HAGMANN, Peter Lerchenweg 10 88289 Waldburg / DE | 03 /
BIEL, Roger c/o CIBA Vision GmbH Postfach 4 63868 Grosswallstadt / DE | 04 /
HEINRICH, Axel c/o Ciba Vision GmbH Postfach 4 63868 Grosswallstadt / DE | 05 /
PIRL, Stephan c/o Ciba Vision GmbH Postfach 4 63868 Grosswallstadt / DE | [2020/27] | Representative(s) | Bohest AG Holbeinstrasse 36-38 4051 Basel / CH | [2020/27] | Application number, filing date | 18774117.8 | 22.08.2018 | [2020/27] | WO2018IB56368 | Priority number, date | US201762549558P | 24.08.2017 Original published format: US 201762549558 P | [2020/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019038697 | Date: | 28.02.2019 | Language: | EN | [2019/09] | Type: | A1 Application with search report | No.: | EP3672791 | Date: | 01.07.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.02.2019 takes the place of the publication of the European patent application. | [2020/27] | Type: | B1 Patent specification | No.: | EP3672791 | Date: | 28.06.2023 | Language: | EN | [2023/26] | Search report(s) | International search report - published on: | EP | 28.02.2019 | Classification | IPC: | B29D11/00 | [2020/27] | CPC: |
B29D11/00125 (EP,US);
G02B1/043 (US);
B29D11/00173 (US);
B29D11/00182 (EP,US);
B29D11/00259 (EP,US);
B29D11/0048 (US);
B29D11/00509 (EP,US);
G02C7/027 (US);
B29C2035/0827 (US);
B29D11/0023 (US);
B29D11/0025 (US);
B29D11/00442 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | HERSTELLUNGSMODUL FÜR DIE HERSTELLUNG VON BRILLENGLÄSERN | [2020/27] | English: | MANUFACTURING MODULE FOR THE MANUFACTURE OF OPHTHALMIC LENSES | [2020/27] | French: | MODULE DE FABRICATION POUR LA FABRICATION DE LENTILLES OPHTALMIQUES | [2020/27] | Entry into regional phase | 16.03.2020 | National basic fee paid | 16.03.2020 | Designation fee(s) paid | 16.03.2020 | Examination fee paid | Examination procedure | 16.03.2020 | Examination requested [2020/27] | 16.03.2020 | Date on which the examining division has become responsible | 02.12.2020 | Amendment by applicant (claims and/or description) | 19.01.2023 | Communication of intention to grant the patent | 15.05.2023 | Fee for grant paid | 15.05.2023 | Fee for publishing/printing paid | 15.05.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 02.04.2024 | No opposition filed within time limit [2024/23] | Fees paid | Renewal fee | 13.08.2020 | Renewal fee patent year 03 | 13.08.2021 | Renewal fee patent year 04 | 26.07.2022 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 22.08.2018 | AT | 28.06.2023 | BG | 28.06.2023 | CZ | 28.06.2023 | DK | 28.06.2023 | EE | 28.06.2023 | ES | 28.06.2023 | FI | 28.06.2023 | HR | 28.06.2023 | IT | 28.06.2023 | LT | 28.06.2023 | LV | 28.06.2023 | MC | 28.06.2023 | NL | 28.06.2023 | PL | 28.06.2023 | RO | 28.06.2023 | RS | 28.06.2023 | SE | 28.06.2023 | SI | 28.06.2023 | SK | 28.06.2023 | SM | 28.06.2023 | TR | 28.06.2023 | LU | 22.08.2023 | FR | 28.08.2023 | BE | 31.08.2023 | CH | 31.08.2023 | NO | 28.09.2023 | GR | 29.09.2023 | IS | 28.10.2023 | PT | 30.10.2023 | [2026/04] |
| Former [2025/36] | CY | 22.08.2018 | |
| AT | 28.06.2023 | ||
| BG | 28.06.2023 | ||
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| ES | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| IT | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SI | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| LU | 22.08.2023 | ||
| FR | 28.08.2023 | ||
| BE | 31.08.2023 | ||
| CH | 31.08.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/51] | AT | 28.06.2023 | |
| BG | 28.06.2023 | ||
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| ES | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| IT | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SI | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| LU | 22.08.2023 | ||
| FR | 28.08.2023 | ||
| BE | 31.08.2023 | ||
| CH | 31.08.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/36] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| ES | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| IT | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SI | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| LU | 22.08.2023 | ||
| FR | 28.08.2023 | ||
| BE | 31.08.2023 | ||
| CH | 31.08.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/34] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| ES | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| IT | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| LU | 22.08.2023 | ||
| FR | 28.08.2023 | ||
| CH | 31.08.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/26] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| ES | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| IT | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| LU | 22.08.2023 | ||
| CH | 31.08.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/24] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| ES | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| LU | 22.08.2023 | ||
| CH | 31.08.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/22] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| DK | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| ES | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| LU | 22.08.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/21] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| ES | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| LU | 22.08.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/16] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| ES | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| MC | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/10] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| EE | 28.06.2023 | ||
| ES | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| PL | 28.06.2023 | ||
| RO | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| PT | 30.10.2023 | ||
| Former [2024/09] | AT | 28.06.2023 | |
| CZ | 28.06.2023 | ||
| ES | 28.06.2023 | ||
| FI | 28.06.2023 | ||
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| IS | 28.10.2023 | ||
| Former [2024/08] | FI | 28.06.2023 | |
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| SK | 28.06.2023 | ||
| SM | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2024/03] | FI | 28.06.2023 | |
| HR | 28.06.2023 | ||
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2024/01] | HR | 28.06.2023 | |
| LT | 28.06.2023 | ||
| LV | 28.06.2023 | ||
| NL | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2023/52] | HR | 28.06.2023 | |
| NL | 28.06.2023 | ||
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2023/51] | HR | 28.06.2023 | |
| RS | 28.06.2023 | ||
| SE | 28.06.2023 | ||
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2023/50] | SE | 28.06.2023 | |
| NO | 28.09.2023 | ||
| GR | 29.09.2023 | ||
| Former [2023/48] | SE | 28.06.2023 | |
| NO | 28.09.2023 | Cited in | International search | [XYI] US2010258962 (DOERR NORBERT et al.) | [XAI] EP0969956 (NOVARTIS AG et al.) | [XAI] US6113817 (HERBRECHTSMEIER PETER et al.) | [YA] US2011089585 (BIEL ROGER et al.) | [A] EP0183324 (IOR IND OTTICHE RIUNITE et al.) | [A] US2015147425 (BIEL ROGER et al.) | [A] US6627124 (HERBRECHTSMEIER PETER et al.) | [A] US2016176092 (ATKINSON HAYDEN et al.) | [A] US2002190405 (CAMERON ROBERT et al.) | [A] US6082987 (SU KAI C et al.) | [A] US2007257387 (HOFMANN GREGORY J et al.) | by applicant | WO2015078798 | WO2011045397 | WO2008116856 | WO2011045384 | WO2012080468 | WO2011045380 | WO03016855 | WO2012066060 | WO2015036432 | WO2009103732 | WO2007060173 | WO2014049053 | WO2014049050 | US5609246 | WO2011026868 |