| EP3608128 - RESIN-METAL COMPOSITE MEMBER FOR TIRE, AND TIRE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.08.2024 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 25.08.2023 | ||
| Former | Grant of patent is intended Status updated on 12.04.2023 | ||
| Former | Examination is in progress Status updated on 21.10.2021 | ||
| Former | Request for examination was made Status updated on 10.01.2020 | ||
| Former | The international publication has been made Status updated on 13.10.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Bridgestone Corporation 1-1, Kyobashi 3-chome Chuo-ku Tokyo 104-8340 / JP | [2020/07] | Inventor(s) | 01 /
SUZUKI, Takahiro c/o BRIDGESTONE CORPORATION 1-1 Kyobashi 3-chome Chuo-ku Tokyo 104-8340 / JP | 02 /
KON, Seiji c/o BRIDGESTONE CORPORATION 1-1 Kyobashi 3-chome Chuo-ku Tokyo 104-8340 / JP | [2020/07] | Representative(s) | Marks & Clerk LLP 15 Fetter Lane London EC4A 1BW / GB | [2023/39] |
| Former [2020/07] | Oxley, Robin John George Marks & Clerk LLP 15 Fetter Lane London EC4A 1BW / GB | Application number, filing date | 18780584.1 | 28.03.2018 | [2020/07] | WO2018JP12979 | Priority number, date | JP20170075980 | 06.04.2017 Original published format: JP 2017075980 | [2020/07] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018186271 | Date: | 11.10.2018 | Language: | JA | [2018/41] | Type: | A1 Application with search report | No.: | EP3608128 | Date: | 12.02.2020 | Language: | EN | [2020/07] | Type: | B1 Patent specification | No.: | EP3608128 | Date: | 27.09.2023 | Language: | EN | [2023/39] | Search report(s) | International search report - published on: | JP | 11.10.2018 | (Supplementary) European search report - dispatched on: | EP | 27.10.2020 | Classification | IPC: | B60C1/00, B60C9/18, B60C13/00, B60C7/00, C08J5/06, B60C9/00, B60C9/22, B60C15/04 | [2023/16] | CPC: |
B60C9/22 (EP);
B60C9/0007 (EP,US);
B60C1/00 (EP);
B60C13/002 (EP);
B60C15/04 (EP,US);
B60C9/005 (EP);
B60C9/1835 (EP);
C08J5/06 (EP,US);
B60C2001/005 (EP);
B60C2007/005 (EP);
B60C2009/0014 (EP);
B60C2009/0021 (EP);
B60C2009/1857 (EP);
B60C2015/046 (US);
C08J2300/26 (EP);
C08J2367/00 (EP);
C08J2371/02 (EP);
C08J2377/00 (EP,US);
C08J2423/30 (US)
(-)
|
| Former IPC [2020/48] | B60C9/00, B60C5/01, B60C9/08, B60C9/20, B60C15/04, C09J7/20, C09J201/00, B60C9/22 | ||
| Former IPC [2020/07] | B60C9/00, B60C5/01, B60C9/08, B60C9/20, B60C15/04, C09J7/20, C09J201/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | HARZ-METALL-VERBUNDSTOFFELEMENT FÜR REIFEN SOWIE REIFEN | [2020/07] | English: | RESIN-METAL COMPOSITE MEMBER FOR TIRE, AND TIRE | [2020/07] | French: | ÉLÉMENT COMPOSITE RÉSINE-MÉTAL POUR PNEUMATIQUE, ET PNEUMATIQUE | [2020/07] | Entry into regional phase | 04.10.2019 | Translation filed | 04.10.2019 | National basic fee paid | 04.10.2019 | Search fee paid | 04.10.2019 | Designation fee(s) paid | 04.10.2019 | Examination fee paid | Examination procedure | 04.10.2019 | Examination requested [2020/07] | 14.05.2021 | Amendment by applicant (claims and/or description) | 20.10.2021 | Despatch of a communication from the examining division (Time limit: M04) | 24.02.2022 | Reply to a communication from the examining division | 01.09.2022 | Despatch of a communication from the examining division (Time limit: M04) | 10.01.2023 | Reply to a communication from the examining division | 13.04.2023 | Communication of intention to grant the patent | 21.08.2023 | Fee for grant paid | 21.08.2023 | Fee for publishing/printing paid | 21.08.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 28.06.2024 | No opposition filed within time limit [2024/36] | Fees paid | Renewal fee | 24.03.2020 | Renewal fee patent year 03 | 24.03.2021 | Renewal fee patent year 04 | 25.03.2022 | Renewal fee patent year 05 | 18.01.2023 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 28.03.2018 | HU | 28.03.2018 | AT | 27.09.2023 | BG | 27.09.2023 | CZ | 27.09.2023 | DK | 27.09.2023 | EE | 27.09.2023 | ES | 27.09.2023 | FI | 27.09.2023 | HR | 27.09.2023 | IT | 27.09.2023 | LT | 27.09.2023 | LV | 27.09.2023 | MC | 27.09.2023 | NL | 27.09.2023 | PL | 27.09.2023 | RO | 27.09.2023 | RS | 27.09.2023 | SE | 27.09.2023 | SI | 27.09.2023 | SK | 27.09.2023 | SM | 27.09.2023 | TR | 27.09.2023 | NO | 27.12.2023 | GR | 28.12.2023 | IS | 27.01.2024 | PT | 29.01.2024 | GB | 28.03.2024 | IE | 28.03.2024 | LU | 28.03.2024 | BE | 31.03.2024 | CH | 31.03.2024 | [2026/04] |
| Former [2025/41] | CY | 28.03.2018 | |
| HU | 28.03.2018 | ||
| AT | 27.09.2023 | ||
| BG | 27.09.2023 | ||
| CZ | 27.09.2023 | ||
| DK | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| HR | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SI | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| GB | 28.03.2024 | ||
| IE | 28.03.2024 | ||
| LU | 28.03.2024 | ||
| BE | 31.03.2024 | ||
| CH | 31.03.2024 | ||
| Former [2025/37] | CY | 28.03.2018 | |
| AT | 27.09.2023 | ||
| BG | 27.09.2023 | ||
| CZ | 27.09.2023 | ||
| DK | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| HR | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SI | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| GB | 28.03.2024 | ||
| IE | 28.03.2024 | ||
| LU | 28.03.2024 | ||
| BE | 31.03.2024 | ||
| CH | 31.03.2024 | ||
| Former [2025/20] | AT | 27.09.2023 | |
| BG | 27.09.2023 | ||
| CZ | 27.09.2023 | ||
| DK | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| HR | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SI | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| GB | 28.03.2024 | ||
| IE | 28.03.2024 | ||
| LU | 28.03.2024 | ||
| BE | 31.03.2024 | ||
| CH | 31.03.2024 | ||
| Former [2025/11] | AT | 27.09.2023 | |
| BG | 27.09.2023 | ||
| CZ | 27.09.2023 | ||
| DK | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SI | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| GB | 28.03.2024 | ||
| IE | 28.03.2024 | ||
| LU | 28.03.2024 | ||
| BE | 31.03.2024 | ||
| CH | 31.03.2024 | ||
| Former [2025/10] | AT | 27.09.2023 | |
| BG | 27.09.2023 | ||
| CZ | 27.09.2023 | ||
| DK | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SI | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| GB | 28.03.2024 | ||
| IE | 28.03.2024 | ||
| LU | 28.03.2024 | ||
| BE | 31.03.2024 | ||
| Former [2025/09] | AT | 27.09.2023 | |
| BG | 27.09.2023 | ||
| CZ | 27.09.2023 | ||
| DK | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SI | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| GB | 28.03.2024 | ||
| LU | 28.03.2024 | ||
| BE | 31.03.2024 | ||
| Former [2025/08] | AT | 27.09.2023 | |
| BG | 27.09.2023 | ||
| CZ | 27.09.2023 | ||
| DK | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SI | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| LU | 28.03.2024 | ||
| BE | 31.03.2024 | ||
| Former [2024/52] | AT | 27.09.2023 | |
| BG | 27.09.2023 | ||
| CZ | 27.09.2023 | ||
| DK | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SI | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| LU | 28.03.2024 | ||
| Former [2024/51] | AT | 27.09.2023 | |
| BG | 27.09.2023 | ||
| CZ | 27.09.2023 | ||
| DK | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SI | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| Former [2024/49] | AT | 27.09.2023 | |
| CZ | 27.09.2023 | ||
| DK | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SI | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| Former [2024/33] | AT | 27.09.2023 | |
| CZ | 27.09.2023 | ||
| DK | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| Former [2024/26] | AT | 27.09.2023 | |
| CZ | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| IT | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| Former [2024/25] | AT | 27.09.2023 | |
| CZ | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| Former [2024/23] | AT | 27.09.2023 | |
| CZ | 27.09.2023 | ||
| EE | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| FI | 27.09.2023 | ||
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| PT | 29.01.2024 | ||
| Former [2024/20] | FI | 27.09.2023 | |
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| Former [2024/14] | FI | 27.09.2023 | |
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| NL | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| Former [2024/10] | FI | 27.09.2023 | |
| LT | 27.09.2023 | ||
| LV | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| Former [2024/09] | FI | 27.09.2023 | |
| LT | 27.09.2023 | ||
| SE | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| Former [2024/08] | LT | 27.09.2023 | |
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | Documents cited: | Search | [XY] JP2011042235 (BRIDGESTONE CORP et al.) [X] 1-3,5-7,10-12 * paragraphs [0053] , [0 54] , [0055]; figures 1,2,10,13; claim - *[Y] 13 | [YA] WO2016084536 (BRIDGESTONE CORP et al.) [Y] 13 * paragraphs [0040] - [0046]; figures 1-3; claim - *[A] 1-12 | [A] JP2016056375 (BRIDGESTONE CORP et al.) [A] 1-13 * figure 6; claim - * | International search | [XA] JP2011042235 (BRIDGESTONE CORP et al.) [X] 1-3, 5-7, 10-12 * , paragraphs [0053]-[0054], [0060]-[0062], drawings & US 2012/0152428 A1, paragraphs [0206]-[0209], [0214]-[0216], figures & US 2016/0068028 A1 & WO 2011/021702 A1 & EP 2468531 A1 & EP 3002132 A1 & CN 102548774 A & CN 103818190 A *[A] 4, 8-9, 13 | [A] WO2014171462 (BRIDGESTONE CORP et al.) [A] 1-13 * , entire text & US 2016/0075180 A1, whole document & JP 2014-205462 A & EP 2987650 A1 & CN 105121179 A * | [A] JP2015007299 (TOKYO SEIKO CO LTD et al.) [A] 1-13 * , entire text & US 2016/0193878 A1, whole document & WO 2014/208480 A1 & EP 3015599 A1 & CN 104250940 A & TW 201500235 A & KR 10-2016-0023836 A & CA 2933314 A1 * | [A] JP2016056375 (BRIDGESTONE CORP et al.) [A] 1-13 * , entire text (Family: none) * | [A] WO2007083387 (TOYO TIRE & RUBBER CO et al.) [A] 1-13 * , entire text & US 2010/0126649 A1, whole document * | Examination | US2015064438 | by applicant | WO2014175453 | JP2004346273 | JPH05331256 | JP2017075980 |