EP3701231 - CORIOLIS MASS FLOW METER WITH TWO PAIRS OF MEASURING TUBES, AND METHOD FOR ZERO POINT CALIBRATING SUCH A MASS FLOW METER [Right-click to bookmark this link] | |||
Former [2020/36] | CORIOLIS MASS FLOW METER COMPRISING TWO MEASURING TUBE PAIRS, AND METHOD FOR THE ZERO-POINT ADJUSTMENT OF SUCH A MASS FLOW METER | ||
[2022/48] | Status | No opposition filed within time limit Status updated on 12.01.2024 Database last updated on 02.08.2024 | |
Former | The patent has been granted Status updated on 03.02.2023 | ||
Former | Grant of patent is intended Status updated on 14.11.2022 | ||
Former | Request for examination was made Status updated on 31.07.2020 | ||
Former | The international publication has been made Status updated on 04.05.2019 | ||
Former | unknown Status updated on 16.10.2018 | Most recent event Tooltip | 02.08.2024 | Lapse of the patent in a contracting state New state(s): BE | published on 04.09.2024 [2024/36] | Applicant(s) | For all designated states Endress+Hauser Flowtec AG Kägenstrasse 7 4153 Reinach / CH | [2020/36] | Inventor(s) | 01 /
ZHU, Hao Auenstrasse 235 85354 Freising / DE | [2020/36] | Representative(s) | Hahn, Christian, et al Endress+Hauser Group Services (Deutschland)AG +Co. KG Colmarer Straße 6 79576 Weil am Rhein / DE | [2023/10] |
Former [2020/36] | Andres, Angelika Maria Endress+Hauser Group Services (Deutschland) AG+Co. KG Colmarer Straße 6 79576 Weil am Rhein / DE | Application number, filing date | 18782403.2 | 02.10.2018 | [2020/36] | WO2018EP76797 | Priority number, date | DE201710125271 | 27.10.2017 Original published format: DE102017125271 | [2020/36] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2019081169 | Date: | 02.05.2019 | Language: | DE | [2019/18] | Type: | A1 Application with search report | No.: | EP3701231 | Date: | 02.09.2020 | Language: | DE | The application published by WIPO in one of the EPO official languages on 02.05.2019 takes the place of the publication of the European patent application. | [2020/36] | Type: | B1 Patent specification | No.: | EP3701231 | Date: | 08.03.2023 | Language: | DE | [2023/10] | Search report(s) | International search report - published on: | EP | 02.05.2019 | Classification | IPC: | G01F1/84, G01F25/10 | [2022/48] | CPC: |
G01F1/8431 (EP,US);
G01F1/8436 (EP,US);
G01F1/8422 (US);
G01F1/8427 (EP,US);
G01F1/8477 (EP,US);
G01F25/10 (EP)
|
Former IPC [2020/36] | G01F25/00, G01F1/84 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | CORIOLIS-MASSEDURCHFLUSSMESSGERÄT MIT ZWEI MESSROHRPAAREN, UND VERFAHREN ZUM NULLPUNKTABGLEICH EINES SOLCHEN MASSEDURCHFLUSSMESSGERÄTES | [2020/36] | English: | CORIOLIS MASS FLOW METER WITH TWO PAIRS OF MEASURING TUBES, AND METHOD FOR ZERO POINT CALIBRATING SUCH A MASS FLOW METER | [2022/48] | French: | DÉBITMÈTRE MASSIQUE DU TYPE CORIOLIS AVEC DEUX PAIRES DE TUBES DE MESURE, ET PROCÉDÉ DE CALIBRATION DE POINT ZÉRO D'UN TEL DÉBITMÈTRE MASSIQUE | [2022/48] |
Former [2020/36] | CORIOLIS MASS FLOW METER COMPRISING TWO MEASURING TUBE PAIRS, AND METHOD FOR THE ZERO-POINT ADJUSTMENT OF SUCH A MASS FLOW METER | ||
Former [2020/36] | DÉBITMÈTRE MASSIQUE À EFFET CORIOLIS COMPORTANT DEUX PAIRES DE TUBES DE MESURE ET PROCÉDÉ DE RÉGLAGE DU ZÉRO D'UN TEL DÉBITMÈTRE MASSIQUE À EFFET CORIOLIS | Entry into regional phase | 31.03.2020 | National basic fee paid | 31.03.2020 | Designation fee(s) paid | 31.03.2020 | Examination fee paid | Examination procedure | 31.03.2020 | Examination requested [2020/36] | 31.03.2020 | Date on which the examining division has become responsible | 14.12.2020 | Amendment by applicant (claims and/or description) | 15.11.2022 | Communication of intention to grant the patent | 26.01.2023 | Fee for grant paid | 26.01.2023 | Fee for publishing/printing paid | 26.01.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 11.12.2023 | No opposition filed within time limit [2024/07] | Fees paid | Renewal fee | 23.10.2020 | Renewal fee patent year 03 | 25.10.2021 | Renewal fee patent year 04 | 25.10.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 08.03.2023 | DK | 08.03.2023 | EE | 08.03.2023 | ES | 08.03.2023 | FI | 08.03.2023 | HR | 08.03.2023 | IT | 08.03.2023 | LT | 08.03.2023 | LV | 08.03.2023 | MC | 08.03.2023 | PL | 08.03.2023 | RO | 08.03.2023 | RS | 08.03.2023 | SE | 08.03.2023 | SI | 08.03.2023 | SK | 08.03.2023 | SM | 08.03.2023 | NO | 08.06.2023 | GR | 09.06.2023 | IS | 08.07.2023 | PT | 10.07.2023 | LU | 02.10.2023 | BE | 31.10.2023 | CH | 31.10.2023 | [2024/36] |
Former [2024/34] | CZ | 08.03.2023 | |
DK | 08.03.2023 | ||
EE | 08.03.2023 | ||
ES | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
IT | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
MC | 08.03.2023 | ||
PL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SI | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
LU | 02.10.2023 | ||
CH | 31.10.2023 | ||
Former [2024/30] | CZ | 08.03.2023 | |
DK | 08.03.2023 | ||
EE | 08.03.2023 | ||
ES | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
IT | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
MC | 08.03.2023 | ||
PL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SI | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
LU | 02.10.2023 | ||
Former [2024/28] | CZ | 08.03.2023 | |
DK | 08.03.2023 | ||
EE | 08.03.2023 | ||
ES | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
IT | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
MC | 08.03.2023 | ||
PL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SI | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
Former [2024/26] | CZ | 08.03.2023 | |
DK | 08.03.2023 | ||
EE | 08.03.2023 | ||
ES | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
IT | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
PL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SI | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
Former [2024/10] | CZ | 08.03.2023 | |
DK | 08.03.2023 | ||
EE | 08.03.2023 | ||
ES | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
PL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SI | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
Former [2023/50] | CZ | 08.03.2023 | |
EE | 08.03.2023 | ||
ES | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
PL | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SK | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
IS | 08.07.2023 | ||
PT | 10.07.2023 | ||
Former [2023/49] | CZ | 08.03.2023 | |
EE | 08.03.2023 | ||
ES | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
RO | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
PT | 10.07.2023 | ||
Former [2023/48] | EE | 08.03.2023 | |
ES | 08.03.2023 | ||
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
PT | 10.07.2023 | ||
Former [2023/46] | ES | 08.03.2023 | |
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
SM | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
PT | 10.07.2023 | ||
Former [2023/37] | ES | 08.03.2023 | |
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
NO | 08.06.2023 | ||
GR | 09.06.2023 | ||
Former [2023/36] | ES | 08.03.2023 | |
FI | 08.03.2023 | ||
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
LV | 08.03.2023 | ||
RS | 08.03.2023 | ||
SE | 08.03.2023 | ||
NO | 08.06.2023 | ||
Former [2023/35] | ES | 08.03.2023 | |
HR | 08.03.2023 | ||
LT | 08.03.2023 | ||
RS | 08.03.2023 | ||
NO | 08.06.2023 | ||
Former [2023/34] | ES | 08.03.2023 | |
LT | 08.03.2023 | ||
RS | 08.03.2023 | ||
Former [2023/33] | ES | 08.03.2023 | |
LT | 08.03.2023 | Cited in | International search | [YA]DE102004035971 (FLOWTEC AG [CH]) [Y] 1-4 * paragraphs [0008] - [0010] - [0044] , [0056] - [0058] - [0069] - [0078]; figures 2-9 * [A] 5-14; | [YA]US2009272173 (MCANALLY CRAIG B [US], et al) [Y] 1-4 * paragraphs [0069] - [0072]; figure 3 *[A] 5-14 | by applicant | DE102015104931 |