EP3697680 - PULL-IN BUOY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.05.2024 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 23.06.2023 | ||
Former | Grant of patent is intended Status updated on 19.02.2023 | ||
Former | Request for examination was made Status updated on 24.07.2020 | ||
Former | The international publication has been made Status updated on 26.04.2019 | ||
Former | unknown Status updated on 27.10.2018 | Most recent event Tooltip | 11.10.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 13.11.2024 [2024/46] | Applicant(s) | For all designated states Sealoading Holding AS Kittelsbuktveien 5 4836 Arendal / NO | [2021/44] |
Former [2020/35] | For all designated states Cefront Technology AS Kittelsbuktveien 5 4836 Arendal / NO | Inventor(s) | 01 /
SMEDAL, Arne Revesandveien 302 4818 Færvik / NO | 02 /
SYVERTSEN, Kåre Dønnestadveien 37 4658 Tveit / NO | [2020/35] | Representative(s) | Bryn Aarflot AS Patent Stortingsgata 8 0161 Oslo / NO | [2023/30] |
Former [2020/35] | Protector IP AS Pilestredet 33 0166 Oslo / NO | Application number, filing date | 18786745.2 | 12.10.2018 | [2020/35] | WO2018EP77837 | Priority number, date | NO20170001655 | 17.10.2017 Original published format: NO 20171655 | [2020/35] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019076741 | Date: | 25.04.2019 | Language: | EN | [2019/17] | Type: | A1 Application with search report | No.: | EP3697680 | Date: | 26.08.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.04.2019 takes the place of the publication of the European patent application. | [2020/35] | Type: | B1 Patent specification | No.: | EP3697680 | Date: | 26.07.2023 | Language: | EN | [2023/30] | Search report(s) | International search report - published on: | EP | 25.04.2019 | Classification | IPC: | B63B27/34, B66C13/02, B63B27/30, B63B21/20, // B63B22/02 | [2023/07] | CPC: |
B63B27/30 (EP);
B63B27/34 (EP,NO);
B63B21/20 (EP);
B66C13/02 (EP,NO);
B63B22/021 (EP,NO)
|
Former IPC [2020/35] | B63B27/30, B63B21/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/35] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | EINZUGSBOJE | [2020/35] | English: | PULL-IN BUOY | [2020/35] | French: | BOUÉE DE TRACTION | [2020/35] | Entry into regional phase | 21.04.2020 | National basic fee paid | 21.04.2020 | Designation fee(s) paid | 21.04.2020 | Examination fee paid | Examination procedure | 21.04.2020 | Examination requested [2020/35] | 21.04.2020 | Date on which the examining division has become responsible | 18.11.2020 | Amendment by applicant (claims and/or description) | 20.02.2023 | Communication of intention to grant the patent | 08.06.2023 | Fee for grant paid | 08.06.2023 | Fee for publishing/printing paid | 08.06.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 29.04.2024 | No opposition filed within time limit [2024/27] | Fees paid | Renewal fee | 20.10.2020 | Renewal fee patent year 03 | 21.10.2021 | Renewal fee patent year 04 | 14.10.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 26.07.2023 | HR | 26.07.2023 | MC | 26.07.2023 | RO | 26.07.2023 | RS | 26.07.2023 | SK | 26.07.2023 | SM | 26.07.2023 | IE | 12.10.2023 | NO | 26.10.2023 | GR | 27.10.2023 | CH | 31.10.2023 | IS | 26.11.2023 | [2024/46] |
Former [2024/34] | CZ | 26.07.2023 | |
HR | 26.07.2023 | ||
MC | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
CH | 31.10.2023 | ||
IS | 26.11.2023 | ||
Former [2024/28] | CZ | 26.07.2023 | |
HR | 26.07.2023 | ||
MC | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
Former [2024/23] | CZ | 26.07.2023 | |
HR | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
Former [2024/20] | HR | 26.07.2023 | |
RS | 26.07.2023 | ||
SM | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
Former [2024/10] | HR | 26.07.2023 | |
RS | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
Former [2024/09] | NO | 26.10.2023 | |
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
Former [2024/08] | NO | 26.10.2023 | |
GR | 27.10.2023 | Cited in | International search | [YA]GB1337520 (CONTINENTAL OIL CO) [Y] 1-7 * page 1, line 76 - page 3, line 40; figures 1-7 *[A] 8-10; | [YDA]WO2014083056 (AKER ENGINEERING & TECHNOLOGY [NO]) [YD] 1-7 * page 9, line 29 - page 21, line 16; figures 1-6 * [A] 8-10 | by applicant | GB2461713 | US2014034137 | WO2014083056 |