EP3650896 - TRANSPARENT DISPLAY APPARATUS AND PREPARATION METHOD THEREFOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.12.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 23.12.2022 | ||
Former | Grant of patent is intended Status updated on 28.09.2022 | ||
Former | Examination is in progress Status updated on 25.03.2022 | ||
Former | Request for examination was made Status updated on 10.04.2020 | ||
Former | The international publication has been made Status updated on 12.01.2019 | ||
Former | unknown Status updated on 31.10.2018 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states BOE TECHNOLOGY GROUP CO., LTD. No. 10 Jiuxianqiao Rd. Chaoyang District Beijing 100015 / CN | For all designated states FUZHOU BOE OPTOELECTRONICS TECHNOLOGY CO., LTD. No. 36 Xihuanbei Road Dianthus Street Fuqing Fujian 350300 / CN | [2020/20] | Inventor(s) | 01 /
WANG, Qiaoni No.9 Dize Rd. BDA Beijing 100176 / CN | 02 /
CHEN, Hui No.9 Dize Rd. BDA Beijing 100176 / CN | 03 /
LUO, Shijian No.9 Dize Rd. BDA Beijing 100176 / CN | 04 /
ZHANG, Xinyu No.9 Dize Rd. BDA Beijing 100176 / CN | 05 /
LIN, Yabin No.9 Dize Rd. BDA Beijing 100176 / CN | [2020/20] | Representative(s) | Klunker IP Patentanwälte PartG mbB Destouchesstraße 68 80796 München / DE | [2020/20] | Application number, filing date | 18789312.8 | 07.03.2018 | [2020/20] | WO2018CN78290 | Priority number, date | CN201710552654 | 07.07.2017 Original published format: CN201710552654 | [2020/20] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019007094 | Date: | 10.01.2019 | Language: | ZH | [2019/02] | Type: | A1 Application with search report | No.: | EP3650896 | Date: | 13.05.2020 | Language: | EN | [2020/20] | Type: | B1 Patent specification | No.: | EP3650896 | Date: | 25.01.2023 | Language: | EN | [2023/04] | Search report(s) | International search report - published on: | CN | 10.01.2019 | (Supplementary) European search report - dispatched on: | EP | 22.02.2021 | Classification | IPC: | G02B6/122, G02B1/00 | [2021/12] | CPC: |
G02B1/005 (EP,US);
G02B6/1225 (CN);
G02B3/0043 (US);
G02B5/08 (US);
G02B5/0808 (EP);
G02B6/0025 (EP);
|
Former IPC [2020/20] | G02B6/122 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | TRANSPARENTE ANZEIGEVORRICHTUNG UND HERSTELLUNGSVERFAHREN DAFÜR | [2020/20] | English: | TRANSPARENT DISPLAY APPARATUS AND PREPARATION METHOD THEREFOR | [2020/20] | French: | APPAREIL D'AFFICHAGE TRANSPARENT ET SON PROCÉDÉ DE PRÉPARATION | [2020/20] | Entry into regional phase | 31.10.2018 | Translation filed | 31.10.2018 | National basic fee paid | 31.10.2018 | Search fee paid | 31.10.2018 | Designation fee(s) paid | 31.10.2018 | Examination fee paid | Examination procedure | 31.10.2018 | Examination requested [2020/20] | 20.09.2021 | Amendment by applicant (claims and/or description) | 24.03.2022 | Despatch of a communication from the examining division (Time limit: M04) | 26.07.2022 | Reply to a communication from the examining division | 29.09.2022 | Communication of intention to grant the patent | 19.12.2022 | Fee for grant paid | 19.12.2022 | Fee for publishing/printing paid | 19.12.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 26.10.2023 | No opposition filed within time limit [2024/01] | Fees paid | Renewal fee | 24.03.2020 | Renewal fee patent year 03 | 24.03.2021 | Renewal fee patent year 04 | 25.03.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 25.01.2023 | CZ | 25.01.2023 | DK | 25.01.2023 | EE | 25.01.2023 | ES | 25.01.2023 | FI | 25.01.2023 | HR | 25.01.2023 | IT | 25.01.2023 | LT | 25.01.2023 | LV | 25.01.2023 | MC | 25.01.2023 | NL | 25.01.2023 | PL | 25.01.2023 | RO | 25.01.2023 | RS | 25.01.2023 | SE | 25.01.2023 | SI | 25.01.2023 | SK | 25.01.2023 | SM | 25.01.2023 | IE | 07.03.2023 | LU | 07.03.2023 | FR | 25.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | LI | 31.03.2023 | GB | 25.04.2023 | NO | 25.04.2023 | GR | 26.04.2023 | IS | 25.05.2023 | PT | 25.05.2023 | [2024/26] |
Former [2024/11] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SI | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
IE | 07.03.2023 | ||
LU | 07.03.2023 | ||
FR | 25.03.2023 | ||
BE | 31.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
GB | 25.04.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2024/09] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
IE | 07.03.2023 | ||
LU | 07.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
GB | 25.04.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2024/08] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
IE | 07.03.2023 | ||
LU | 07.03.2023 | ||
GB | 25.04.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2024/02] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
LU | 07.03.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/50] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/49] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/48] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/46] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/39] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/38] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/37] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/36] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/35] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
NO | 25.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/34] | ES | 25.01.2023 | |
LT | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
PT | 25.05.2023 | ||
Former [2023/33] | ES | 25.01.2023 | |
LT | 25.01.2023 | ||
NL | 25.01.2023 | ||
Former [2023/31] | NL | 25.01.2023 | Documents cited: | Search | [A]WO2013069740 (SHARP KK [JP], et al) [A] 1-15* the whole document *; | [A]US2016141452 (CHEN PENG [CN]) [A] 1-15 * paragraph [0024] - paragraph [0039] * * figures 3-5 * | International search | [A]JP2006343671 (TOKYO INST TECH, et al) [A] 1-20* , entire document *; | [Y]CN103529513 (UNIV ZHEJIANG TECHNOLOGY) [Y] 3-10, 12-15 * , description, paragraphs [0024]-[0048], and figures 1-8 *; | [A]CN104101940 (BOE TECHNOLOGY GROUP CO LTD, et al) [A] 1-20 * , entire document *; | [XY]CN106575034 (WAVE OPTICS LTD) [X] 1, 2, 11, 16-20 * , description, paragraphs [0002], [0003] and [0059]-[0065], and figures 16-20, description, paragraphs [0002], [0003] and [0059]-[0065], and figures 16-20 * [Y] 3-10, 12-15 |