| EP3623041 - HOLLOW STRUCTURE PARTICLES, METHOD FOR PRODUCING SAME AND WHITE INK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.01.2023 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 04.02.2022 | ||
| Former | Grant of patent is intended Status updated on 29.09.2021 | ||
| Former | Examination is in progress Status updated on 25.09.2020 | ||
| Former | Request for examination was made Status updated on 14.02.2020 | ||
| Former | The international publication has been made Status updated on 17.11.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Nippon Kayaku Kabushiki Kaisha 1-1, Marunouchi 2-chome Chiyoda-ku Tokyo 100-0005 / JP | [2020/12] | Inventor(s) | 01 /
HARA, Yukihiro c/o NIPPON KAYAKU KABUSHIKI KAISHA Research Planning Division 31-12, Shimo 3-chome Kita-ku Tokyo 115-8588 / JP | 02 /
NOHARA, Akihiro c/o NIPPON KAYAKU KABUSHIKI KAISHA Research Planning Division 31-12, Shimo 3-chome Kita-ku Tokyo 115-8588 / JP | [2020/12] | Representative(s) | Maiwald GmbH Elisenhof Elisenstraße 3 80335 München / DE | [N/P] |
| Former [2020/12] | Parchmann, Stefanie Maiwald Patentanwalts- und Rechtsanwaltsgesellschaft mbH Elisenhof Elisenstraße 3 80335 München / DE | Application number, filing date | 18798808.4 | 08.05.2018 | [2020/12] | WO2018JP17705 | Priority number, date | JP20170094319 | 11.05.2017 Original published format: JP 2017094319 | [2020/12] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018207751 | Date: | 15.11.2018 | Language: | JA | [2018/46] | Type: | A1 Application with search report | No.: | EP3623041 | Date: | 18.03.2020 | Language: | EN | [2020/12] | Type: | B1 Patent specification | No.: | EP3623041 | Date: | 09.03.2022 | Language: | EN | [2022/10] | Search report(s) | International search report - published on: | JP | 15.11.2018 | (Supplementary) European search report - dispatched on: | EP | 17.01.2020 | Classification | IPC: | B01J13/02, B01J13/22 | [2021/40] | CPC: |
B01J13/02 (EP);
C09D11/322 (EP,US);
B01J13/04 (US);
B01J13/203 (EP);
B01J13/206 (EP);
B01J13/22 (EP);
B41J2/2117 (US);
B41M5/00 (EP);
B41M5/0023 (US);
C01G23/04 (EP);
C01G23/047 (EP);
C04B38/009 (EP);
C09C1/363 (US);
C09C1/3661 (US);
C09C1/3692 (US);
C09D11/037 (US);
C01P2004/34 (US);
C01P2004/61 (US);
C01P2004/62 (US);
C01P2004/64 (US);
C01P2004/84 (US);
C01P2006/60 (US)
(-)
| C-Set: |
C04B38/009, C04B35/462, C04B38/067 (EP)
|
| Former IPC [2020/12] | B01J13/18, B41M5/00, C01G23/04, C01G23/047, C09D11/322, B01J13/14, B01J13/20, C04B38/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | PARTIKEL MIT HOHLSTRUKTUR, VERFAHREN ZU IHRER HERSTELLUNG UND WEISSE TINTE | [2020/12] | English: | HOLLOW STRUCTURE PARTICLES, METHOD FOR PRODUCING SAME AND WHITE INK | [2020/12] | French: | PARTICULES À STRUCTURE CREUSE, LEUR PROCÉDÉ DE PRODUCTION ET ENCRE BLANCHE | [2020/12] | Entry into regional phase | 27.11.2019 | Translation filed | 27.11.2019 | National basic fee paid | 27.11.2019 | Search fee paid | 27.11.2019 | Designation fee(s) paid | 27.11.2019 | Examination fee paid | Examination procedure | 27.11.2019 | Examination requested [2020/12] | 09.04.2020 | Amendment by applicant (claims and/or description) | 24.09.2020 | Despatch of a communication from the examining division (Time limit: M04) | 22.12.2020 | Reply to a communication from the examining division | 06.04.2021 | Despatch of a communication from the examining division (Time limit: M04) | 25.05.2021 | Reply to a communication from the examining division | 30.09.2021 | Communication of intention to grant the patent | 01.02.2022 | Fee for grant paid | 01.02.2022 | Fee for publishing/printing paid | 01.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 12.12.2022 | No opposition filed within time limit [2023/07] | Fees paid | Renewal fee | 27.03.2020 | Renewal fee patent year 03 | 31.05.2021 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.05.2018 | AL | 09.03.2022 | AT | 09.03.2022 | CY | 09.03.2022 | CZ | 09.03.2022 | DK | 09.03.2022 | EE | 09.03.2022 | ES | 09.03.2022 | FI | 09.03.2022 | HR | 09.03.2022 | IT | 09.03.2022 | LT | 09.03.2022 | LV | 09.03.2022 | MC | 09.03.2022 | MK | 09.03.2022 | MT | 09.03.2022 | NL | 09.03.2022 | PL | 09.03.2022 | RO | 09.03.2022 | RS | 09.03.2022 | SE | 09.03.2022 | SI | 09.03.2022 | SK | 09.03.2022 | SM | 09.03.2022 | TR | 09.03.2022 | IE | 08.05.2022 | LU | 08.05.2022 | BE | 31.05.2022 | CH | 31.05.2022 | LI | 31.05.2022 | BG | 09.06.2022 | NO | 09.06.2022 | GR | 10.06.2022 | IS | 09.07.2022 | PT | 11.07.2022 | [2026/04] |
| Former [2024/44] | HU | 08.05.2018 | |
| AL | 09.03.2022 | ||
| AT | 09.03.2022 | ||
| CY | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| MK | 09.03.2022 | ||
| MT | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 08.05.2022 | ||
| LU | 08.05.2022 | ||
| BE | 31.05.2022 | ||
| CH | 31.05.2022 | ||
| LI | 31.05.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2024/24] | HU | 08.05.2018 | |
| AL | 09.03.2022 | ||
| AT | 09.03.2022 | ||
| CY | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| MK | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 08.05.2022 | ||
| LU | 08.05.2022 | ||
| BE | 31.05.2022 | ||
| CH | 31.05.2022 | ||
| LI | 31.05.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2024/23] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CY | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| MK | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 08.05.2022 | ||
| LU | 08.05.2022 | ||
| BE | 31.05.2022 | ||
| CH | 31.05.2022 | ||
| LI | 31.05.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2024/20] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CY | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 08.05.2022 | ||
| LU | 08.05.2022 | ||
| BE | 31.05.2022 | ||
| CH | 31.05.2022 | ||
| LI | 31.05.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/35] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 08.05.2022 | ||
| LU | 08.05.2022 | ||
| BE | 31.05.2022 | ||
| CH | 31.05.2022 | ||
| LI | 31.05.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/25] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 08.05.2022 | ||
| LU | 08.05.2022 | ||
| BE | 31.05.2022 | ||
| CH | 31.05.2022 | ||
| LI | 31.05.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/20] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 08.05.2022 | ||
| LU | 08.05.2022 | ||
| CH | 31.05.2022 | ||
| LI | 31.05.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/10] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| LU | 08.05.2022 | ||
| CH | 31.05.2022 | ||
| LI | 31.05.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/09] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| LU | 08.05.2022 | ||
| CH | 31.05.2022 | ||
| LI | 31.05.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/08] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| LU | 08.05.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/07] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/06] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/01] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/51] | AT | 09.03.2022 | |
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/50] | AT | 09.03.2022 | |
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| PL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/49] | AT | 09.03.2022 | |
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/48] | AT | 09.03.2022 | |
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/47] | AT | 09.03.2022 | |
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/44] | FI | 09.03.2022 | |
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| Former [2022/39] | FI | 09.03.2022 | |
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| Former [2022/36] | HR | 09.03.2022 | |
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| Former [2022/35] | HR | 09.03.2022 | |
| LT | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| Former [2022/33] | LT | 09.03.2022 | |
| NO | 09.06.2022 | Documents cited: | Search | [XAI] JP2009298614 (JGC CATALYSTS & CHEMICALS LTD et al.) [X] 1-3 * claims 2,5 *[A] 5-14 [I] 4 | [XAI] CN104046117 [X] 1,3 * example 1 *[A] 5-14 [I] 2,4 | International search | [X] JP2008074645 (NITTETSU MINING CO LTD et al.) [X] 1-3, 11-14 * , claims, example 3, paragraphs [0057], [0065]-[0067] (Family: none) * | [X] CN104671282 (YAO PENGCHENG et al.) [X] 1-3, 11-14 * , claims, examples 1-4, paragraph [0003] (Family: none) * | [A] JP2006307125 (TOTO LTD et al.) [A] 1-14 * (Family: none) * | [X] SONG, X. ET AL.: "Fabrication of Hollow Hybrid Microspheres Coated with Silica/Titania via Sol-Gel Process and Enhanced Photocatalytic Activities", J. PHYS. CHEM. C, vol. 111, no. 23, 16 May 2007 (2007-05-16), pages 8180 - 8187, XP055561264, ISSN: 1932-7447 [X] 1-4 * , in particular, Introduction, Preparation of Hollow Si02/Ti02 Double-Shell Hybrid Microspheres and Doping Nitrogen Procedure., XRD Analysis., fig. 4 * DOI: http://dx.doi.org/10.1021/jp071142j | by applicant | JP2013023676 | JPH06330606 | JPH05138009 | JPH06142491 | WO2013115071 | PROCEEDINGS OF THE MEETING OF THE SOCIETY OF POWDER TECHNOLOGY, JAPAN, vol. 2011, 2011, pages 25 - 26 | J. PHYS. CHEM. C, vol. 113, 2009, pages 20240 - 20245 | XIONG WEN (DAVID) LOULYNDEN A. ARCHERZICHAO YANG, ADV. MATER., vol. 20, 2008, pages 3987 - 4019 |