EP3711271 - TECHNIQUE FOR CONFIGURING A PHASE TRACKING REFERENCE SIGNAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.11.2022 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 03.12.2021 | ||
Former | Grant of patent is intended Status updated on 08.07.2021 | ||
Former | Request for examination was made Status updated on 21.08.2020 | ||
Former | The international publication has been made Status updated on 28.05.2019 | ||
Former | unknown Status updated on 01.12.2018 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (Publ) 164 83 Stockholm / SE | [2020/39] | Inventor(s) | 01 /
MOLÉS CASES, Vicent Calle Escultor Esteve Edo 2 12520 Nules (Castellon) / ES | 02 /
FRENNE, Mattias Arkeologvägen 20 75443 Uppsala / SE | [2020/39] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2020/39] | Application number, filing date | 18804575.1 | 15.11.2018 | [2020/39] | WO2018EP81400 | Priority number, date | US201762587967P | 17.11.2017 Original published format: US 201762587967 P | [2020/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019096919 | Date: | 23.05.2019 | Language: | EN | [2019/21] | Type: | A1 Application with search report | No.: | EP3711271 | Date: | 23.09.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.05.2019 takes the place of the publication of the European patent application. | [2020/39] | Type: | B1 Patent specification | No.: | EP3711271 | Date: | 05.01.2022 | Language: | EN | [2022/01] | Search report(s) | International search report - published on: | EP | 23.05.2019 | Classification | IPC: | H04L27/26 | [2020/39] | CPC: |
H04L5/0051 (EP,KR,US);
H04B7/0452 (KR,RU);
H04L27/2636 (KR);
H04L41/0803 (RU,US);
H04L5/0044 (KR);
H04L5/0048 (US);
H04L5/0053 (KR);
H04L5/0094 (EP,KR,US);
H04W56/0035 (KR);
H04W72/0453 (RU,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUM KONFIGURIEREN EINES PHASENVERFOLGENDEN REFERENZSIGNALS | [2020/39] | English: | TECHNIQUE FOR CONFIGURING A PHASE TRACKING REFERENCE SIGNAL | [2020/39] | French: | TECHNIQUE DE CONFIGURATION D'UN SIGNAL DE RÉFÉRENCE DE SUIVI DE PHASE | [2020/39] | Entry into regional phase | 17.06.2020 | National basic fee paid | 17.06.2020 | Designation fee(s) paid | 17.06.2020 | Examination fee paid | Examination procedure | 17.09.2019 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 17.06.2020 | Examination requested [2020/39] | 17.06.2020 | Date on which the examining division has become responsible | 15.06.2021 | Amendment by applicant (claims and/or description) | 09.07.2021 | Communication of intention to grant the patent | 10.11.2021 | Fee for grant paid | 10.11.2021 | Fee for publishing/printing paid | 10.11.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21207759.8 / EP4009567 | Opposition(s) | 06.10.2022 | No opposition filed within time limit [2022/50] | Fees paid | Renewal fee | 27.11.2020 | Renewal fee patent year 03 | 29.11.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 05.01.2022 | AT | 05.01.2022 | CY | 05.01.2022 | EE | 05.01.2022 | FI | 05.01.2022 | HR | 05.01.2022 | LT | 05.01.2022 | LV | 05.01.2022 | MC | 05.01.2022 | MK | 05.01.2022 | RS | 05.01.2022 | SI | 05.01.2022 | SK | 05.01.2022 | SM | 05.01.2022 | BG | 05.04.2022 | GR | 06.04.2022 | IS | 05.05.2022 | PT | 05.05.2022 | [2024/27] |
Former [2024/21] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
CY | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
RS | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2023/31] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
MC | 05.01.2022 | ||
RS | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2023/10] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
RS | 05.01.2022 | ||
SI | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2023/01] | AL | 05.01.2022 | |
AT | 05.01.2022 | ||
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
RS | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/49] | AT | 05.01.2022 | |
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
RS | 05.01.2022 | ||
SK | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/48] | AT | 05.01.2022 | |
EE | 05.01.2022 | ||
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
RS | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/47] | AT | 05.01.2022 | |
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
RS | 05.01.2022 | ||
SM | 05.01.2022 | ||
BG | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/42] | AT | 05.01.2022 | |
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
RS | 05.01.2022 | ||
BG | 05.04.2022 | ||
GR | 06.04.2022 | ||
IS | 05.05.2022 | ||
PT | 05.05.2022 | ||
Former [2022/39] | AT | 05.01.2022 | |
FI | 05.01.2022 | ||
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
RS | 05.01.2022 | ||
BG | 05.04.2022 | ||
GR | 06.04.2022 | ||
PT | 05.05.2022 | ||
Former [2022/36] | AT | 05.01.2022 | |
HR | 05.01.2022 | ||
LT | 05.01.2022 | ||
LV | 05.01.2022 | ||
RS | 05.01.2022 | ||
BG | 05.04.2022 | ||
GR | 06.04.2022 | ||
PT | 05.05.2022 | ||
Former [2022/35] | HR | 05.01.2022 | |
LT | 05.01.2022 | ||
RS | 05.01.2022 | ||
BG | 05.04.2022 | ||
PT | 05.05.2022 | ||
Former [2022/34] | LT | 05.01.2022 | |
PT | 05.05.2022 | ||
Former [2022/33] | LT | 05.01.2022 | Cited in | International search | [Y]US2017294926 (ISLAM MUHAMMAD NAZMUL [US], et al) [Y] 4-32,36-64 * paragraph [0090] - paragraph [0091] * * paragraph [0065] - paragraph [0066] * * paragraph [0072] - paragraph [0076] * * paragraph [0094] - paragraph [0100] * * paragraph [0113] *; | [A] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for data (Release 15)", (20171012), 3GPP DRAFT; R1-1718819, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_90b/Docs/, (20171012), XP051353428 [A] 1-82 * section 5 * | [XYI] - INTEL SAMSUNG HUAWEI HISILICON ZTE SANECHIPS IITH CEWIT IITM TEJAS NETWORKS RELIANCE JIO PANASONIC INTERDIGITAL MITSUBISHI ERICSSO, "JOINT WF on PTRS", (20171012), 3GPP DRAFT; R1-1718998, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_90b/Docs/, (20171012), XP051353472 [X] 1,2,33,34,65-82 * page 3 - page 5 * [Y] 4-32,36-64 [I] 3,35 | [Y] - ERICSSON, "Summary of PTRS open issues", vol. RAN WG1, no. Prague, Czech Republic; 20171009 - 20171013, (20171009), 3GPP DRAFT; R1-1718845 PTRS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_90b/Docs/, (20171009), XP051353320 [Y] 4-32,36-64 * sections 2,3 * | [Y] - HUAWEI ET AL, "Summary for remaining issues of RS multiplexing", vol. RAN WG1, no. Prague, Czech Republic; 20171009 - 20171013, (20171009), 3GPP DRAFT; R1-1718851 SUMMARY FOR REMAINING ISSUES OF RS MULTIPLEXING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ;, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_90b/Docs/, (20171009), XP051353323 [Y] 4-32,36-64 * sections 2 and 3 * | [Y] - ERICSSON, "RRC parameters for PTRS", vol. RAN WG1, no. Prague, CZ; 20171009 - 20171013, (20171017), 3GPP DRAFT; R1-1719071, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_90b/Docs/, (20171017), XP051353613 [Y] 4-32,36-64 * section 1 * |