EP3607659 - SUCCESSIVE APPROXIMATION REGISTER (SAR) ANALOG TO DIGITAL CONVERTER (ADC) DYNAMIC RANGE EXTENSION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.05.2022 Database last updated on 01.01.2025 | |
Former | The patent has been granted Status updated on 12.06.2021 | ||
Former | Grant of patent is intended Status updated on 28.03.2021 | ||
Former | Examination is in progress Status updated on 20.03.2020 | ||
Former | Request for examination was made Status updated on 10.01.2020 | ||
Former | unknown Status updated on 04.12.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Shenzhen Goodix Technology Co., Ltd. Floor 13, Phase B, Tengfei Industrial Building Futian Free Trade Zone Shenzhen, Guangdong 518045 / CN | [2020/07] | Inventor(s) | 01 /
Farid, Ali Floor 13, Phase B Tengfei Industrial Building Futian Free Trade Zone Shenzhen, Guangdong 518045 / CN | 02 /
Emira, Ahmed Floor 13, Phase B Tengfei Industrial Building Futian Free Trade Zone Shenzhen, Guangdong 518045 / CN | 03 /
Aboudina, Mohamed Floor 13, Phase B Tengfei Industrial Building Futian Free Trade Zone Shenzhen, Guangdong 518045 / CN | 04 /
Elwan, Hassan Osama Floor 13, Phase B Tengfei Industrial Building Futian Free Trade Zone Shenzhen, Guangdong 518045 / CN | [2020/07] | Representative(s) | Herrero & Asociados, S.L. Edificio Aqua - Agustín de Foxá, 4-10 28036 Madrid / ES | [N/P] |
Former [2020/07] | Herrero & Asociados, S.L. Cedaceros, 1 28014 Madrid / ES | Application number, filing date | 18806958.7 | 31.10.2018 | [2020/07] | WO2018CN113159 | Priority number, date | US201815993625 | 31.05.2018 Original published format: US201815993625 | [2020/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019227845 | Date: | 05.12.2019 | Language: | EN | [2019/49] | Type: | A1 Application with search report | No.: | EP3607659 | Date: | 12.02.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.12.2019 takes the place of the publication of the European patent application. | [2020/07] | Type: | B1 Patent specification | No.: | EP3607659 | Date: | 07.07.2021 | Language: | EN | [2021/27] | Search report(s) | International search report - published on: | CN | 05.12.2019 | (Supplementary) European search report - dispatched on: | EP | 26.06.2019 | Classification | IPC: | H03M1/40, H03M1/12, H03M1/46 | [2020/07] | CPC: |
H03M1/462 (EP,US);
H03M1/468 (EP,CN,US);
H03M1/129 (EP,US);
H03M1/403 (EP,US);
H03M1/466 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | DYNAMIKBEREICHSERWEITERUNG EINES ANALOG-DIGITAL-WANDLERS (ADC) MIT SUKZESSIVEM APPROXIMATIONS-REGISTER (SAR) | [2020/07] | English: | SUCCESSIVE APPROXIMATION REGISTER (SAR) ANALOG TO DIGITAL CONVERTER (ADC) DYNAMIC RANGE EXTENSION | [2020/07] | French: | REGISTRE D'APPROXIMATION SUCCESSIVE (SAR) ANALOGIQUE À L'EXTENSION DE LA GAMME DYNAMIQUE DU CONVERTISSEUR NUMÉRIQUE (ADC) | [2020/07] | Examination procedure | 03.12.2018 | Examination requested [2020/07] | 07.01.2020 | Amendment by applicant (claims and/or description) | 07.01.2020 | Date on which the examining division has become responsible | 24.03.2020 | Despatch of a communication from the examining division (Time limit: M04) | 16.07.2020 | Reply to a communication from the examining division | 16.03.2021 | Cancellation of oral proceeding that was planned for 30.03.2021 | 29.03.2021 | Communication of intention to grant the patent | 30.03.2021 | Date of oral proceedings (cancelled) | 28.05.2021 | Fee for grant paid | 28.05.2021 | Fee for publishing/printing paid | 28.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 08.04.2022 | No opposition filed within time limit [2022/24] | Fees paid | Renewal fee | 29.10.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.10.2018 | AL | 07.07.2021 | AT | 07.07.2021 | CY | 07.07.2021 | CZ | 07.07.2021 | DK | 07.07.2021 | EE | 07.07.2021 | ES | 07.07.2021 | FI | 07.07.2021 | HR | 07.07.2021 | IT | 07.07.2021 | LT | 07.07.2021 | LV | 07.07.2021 | MC | 07.07.2021 | MK | 07.07.2021 | MT | 07.07.2021 | NL | 07.07.2021 | PL | 07.07.2021 | RO | 07.07.2021 | RS | 07.07.2021 | SE | 07.07.2021 | SI | 07.07.2021 | SK | 07.07.2021 | SM | 07.07.2021 | TR | 07.07.2021 | BG | 07.10.2021 | NO | 07.10.2021 | GR | 08.10.2021 | BE | 31.10.2021 | CH | 31.10.2021 | FR | 31.10.2021 | IE | 31.10.2021 | LI | 31.10.2021 | LU | 31.10.2021 | IS | 07.11.2021 | PT | 08.11.2021 | [2024/42] |
Former [2024/29] | HU | 31.10.2018 | |
AL | 07.07.2021 | ||
AT | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
MK | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
TR | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
IE | 31.10.2021 | ||
LI | 31.10.2021 | ||
LU | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2024/23] | HU | 31.10.2018 | |
AL | 07.07.2021 | ||
AT | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
MK | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
IE | 31.10.2021 | ||
LI | 31.10.2021 | ||
LU | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2023/33] | HU | 31.10.2018 | |
AL | 07.07.2021 | ||
AT | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
IE | 31.10.2021 | ||
LI | 31.10.2021 | ||
LU | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2023/30] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
IE | 31.10.2021 | ||
LI | 31.10.2021 | ||
LU | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/48] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
IE | 31.10.2021 | ||
LI | 31.10.2021 | ||
LU | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/41] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
LU | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/37] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
LU | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/36] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
BE | 31.10.2021 | ||
LU | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/35] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
BE | 31.10.2021 | ||
LU | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/33] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
BE | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/29] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/25] | AT | 07.07.2021 | |
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/24] | AT | 07.07.2021 | |
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SK | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/21] | AT | 07.07.2021 | |
DK | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/11] | AT | 07.07.2021 | |
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/09] | AT | 07.07.2021 | |
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
LT | 07.07.2021 | ||
NL | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
PT | 08.11.2021 | ||
Former [2022/08] | AT | 07.07.2021 | |
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
LT | 07.07.2021 | ||
NL | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
Former [2022/07] | AT | 07.07.2021 | |
LT | 07.07.2021 | ||
NL | 07.07.2021 | ||
NO | 07.10.2021 | Documents cited: | Search | [X]US5675340 (HESTER RICHARD KNIGHT [US], et al) [X] 1-15 * figure 9 * * column 12, line 16 - column 14, line 38 *; | [X]US2016218735 (MIKKELSEN SINDRE [NO], et al) [X] 1-15 * figure 3 ** paragraphs [0027] - [0033] *; | [X]US9432046 (YU GUANG-WEN [TW], et al) [X] 1-15 * figure 1 * * column 1, line 1 - column 2, line 11 * * column 2, line 34 - column 3, line 59 * |