EP3746748 - DIFFERENTIAL FLOW MEASUREMENT WITH CORIOLIS FLOWMETER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.04.2024 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 05.05.2023 | ||
Former | Grant of patent is intended Status updated on 21.04.2023 | ||
Former | Examination is in progress Status updated on 04.03.2022 | ||
Former | Request for examination was made Status updated on 01.10.2021 | ||
Former | Examination is in progress Status updated on 16.09.2021 | ||
Former | Request for examination was made Status updated on 06.11.2020 | ||
Former | The international publication has been made Status updated on 03.08.2019 | ||
Former | unknown Status updated on 22.12.2018 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Weatherford Technology Holdings, LLC 2000 St. James Place Houston, TX 77056 / US | [2021/23] |
Former [2020/50] | For all designated states Weatherford Technology Holdings, LLC 2000 St. James Place Houston Texas 77056 / US | Inventor(s) | 01 /
DILLARD, Walter 11909 Spencer Road - FM 529 Houston, TX 77041 / US | 02 /
PARK, Sang (Paul) 11909 Spencer Road - FM 529 Houston, TX 77041 / US | 03 /
VIERAITIS, David 11909 Spencer Road - FM 529 Houston, TX 77041 / US | [2023/02] |
Former [2021/23] | 01 /
VIERAITIS, David 11909 Spencer Road - FM 529 Houston, TX 77041 / US | ||
Former [2020/50] | 01 /
VIERAITIS, David 11909 Spencer Road FM 529 Houston, Texas 77041 / US | Representative(s) | Marks & Clerk LLP 15 Fetter Lane London EC4A 1BW / GB | [2023/23] |
Former [2020/50] | Docherty, Andrew John Marks & Clerk LLP Aurora 120 Bothwell Street Glasgow G2 7JS / GB | Application number, filing date | 18816427.1 | 26.11.2018 | [2020/50] | WO2018US62438 | Priority number, date | US201815882900 | 29.01.2018 Original published format: US201815882900 | [2020/50] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019147332 | Date: | 01.08.2019 | Language: | EN | [2019/31] | Type: | A1 Application with search report | No.: | EP3746748 | Date: | 09.12.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.08.2019 takes the place of the publication of the European patent application. | [2020/50] | Type: | B1 Patent specification | No.: | EP3746748 | Date: | 07.06.2023 | Language: | EN | [2023/23] | Search report(s) | International search report - published on: | EP | 01.08.2019 | (Supplementary) European search report - dispatched on: | EP | 07.03.2022 | Classification | IPC: | E21B21/08, E21B21/10, G01F1/34, G01F1/40, G01F5/00, G01F1/74, G01F1/84 | [2022/47] | CPC: |
G01F1/84 (EP);
G01F1/44 (US);
E21B21/08 (EP);
E21B21/10 (EP);
E21B47/10 (EP,US);
G01F1/34 (EP,US);
G01F1/40 (EP,US);
G01F1/80 (US);
G01F1/8427 (US);
|
Former IPC [2022/14] | G01F1/34, G01F1/40, G01F1/80, G01F5/00, G01F1/74, G01F1/84 | ||
Former IPC [2020/50] | G01F1/34, G01F1/40, G01F1/80, G01F5/00, G01F1/74 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/50] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | DIFFERENZIALDURCHFLUSSMESSUNG MIT CORIOLISDURCHFLUSSMESSER | [2022/10] | English: | DIFFERENTIAL FLOW MEASUREMENT WITH CORIOLIS FLOWMETER | [2020/50] | French: | DÉBIMÈTRIE DIFFÉRENTIELLE AVEC DÉBIMÈTRE CORIOLIS | [2023/01] |
Former [2020/50] | DIFFERENZDRUCKMESSUNG MIT CORIOLIS-DURCHFLUSSMESSER | ||
Former [2020/50] | MESURE DE DÉBIT DIFFÉRENTIEL AVEC UN DÉBITMÈTRE DE CORIOLIS | Entry into regional phase | 08.07.2020 | National basic fee paid | 08.07.2020 | Designation fee(s) paid | 08.07.2020 | Examination fee paid | Examination procedure | 08.07.2020 | Examination requested [2020/50] | 08.07.2020 | Date on which the examining division has become responsible | 18.03.2021 | Amendment by applicant (claims and/or description) | 07.03.2022 | Despatch of a communication from the examining division to which search results under Rule 164(2) EPC are annexed (Time limit: M04) [2022/14] | 07.03.2022 | Despatch of a communication from the examining division (Time limit: M04) | 28.06.2022 | Reply to a communication from the examining division | 15.12.2022 | Communication of intention to grant the patent | 20.04.2023 | Fee for grant paid | 20.04.2023 | Fee for publishing/printing paid | 20.04.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 08.03.2024 | No opposition filed within time limit [2024/20] | Fees paid | Renewal fee | 13.11.2020 | Renewal fee patent year 03 | 10.11.2021 | Renewal fee patent year 04 | 13.10.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 07.06.2023 | BG | 07.06.2023 | CZ | 07.06.2023 | DK | 07.06.2023 | EE | 07.06.2023 | ES | 07.06.2023 | FI | 07.06.2023 | HR | 07.06.2023 | IT | 07.06.2023 | LT | 07.06.2023 | LV | 07.06.2023 | MC | 07.06.2023 | NL | 07.06.2023 | PL | 07.06.2023 | RO | 07.06.2023 | RS | 07.06.2023 | SE | 07.06.2023 | SI | 07.06.2023 | SK | 07.06.2023 | SM | 07.06.2023 | GR | 08.09.2023 | IS | 07.10.2023 | PT | 09.10.2023 | IE | 26.11.2023 | LU | 26.11.2023 | BE | 30.11.2023 | CH | 30.11.2023 | FR | 30.11.2023 | [2024/51] |
Former [2024/47] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
IT | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
IE | 26.11.2023 | ||
LU | 26.11.2023 | ||
BE | 30.11.2023 | ||
CH | 30.11.2023 | ||
FR | 30.11.2023 | ||
Former [2024/46] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
IT | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
IE | 26.11.2023 | ||
LU | 26.11.2023 | ||
CH | 30.11.2023 | ||
Former [2024/34] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
IT | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
LU | 26.11.2023 | ||
CH | 30.11.2023 | ||
Former [2024/32] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
IT | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/26] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
IT | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/24] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/22] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/10] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/09] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
Former [2024/08] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
GR | 08.09.2023 | ||
Former [2024/03] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
GR | 08.09.2023 | ||
Former [2024/01] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
GR | 08.09.2023 | ||
Former [2023/52] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
GR | 08.09.2023 | ||
Former [2023/51] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
GR | 08.09.2023 | ||
Former [2023/50] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
GR | 08.09.2023 | ||
Former [2023/48] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
Former [2023/46] | ES | 07.06.2023 | Cited in | International search | [A]US5661232 (VAN CLEVE CRAIG BRAINERD [US], et al) [A] 1-3,6-12,17,18,20,21,24-30* figures 2, 5, 7 *; | [XI]US5861561 (VAN CLEVE CRAIG BRAINERD [US], et al) [X] 1-3,6-9,11,17,18,20,21,24-27,29 * figure 1 * * column 4, line 1 - line 24 * * column 5, line 45 - line 60 * * column 10, line 45 - line 55 * * column 11, line 46 - line 51 * * column 3, line 66 - column 4, line 37 * [I] 10,12,28,30; | [A]WO2014004166 (ROSEMOUNT INC [US]) [A] 10,12,28,30 * page 3, line 6 - line 15 * | Examination | US6561043 | WO2013005091 | US8657034 | WO2014183136 | US2016084024 | EP3221558 | US2017328151 |