EP3626017 - SYSTEM AND METHOD FOR UE RANDOM ACCESS OVER WIDE BANDWIDTH WITH SUBSET RESTRICTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 15.11.2024 | |
Former | The patent has been granted Status updated on 25.03.2022 | ||
Former | Grant of patent is intended Status updated on 11.11.2021 | ||
Former | Request for examination was made Status updated on 21.02.2020 | ||
Former | The international publication has been made Status updated on 02.02.2019 | Most recent event Tooltip | 15.11.2024 | Change - lapse in a contracting state Updated state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2020/13] | Inventor(s) | 01 /
LIU, Bin 13559 Peach Tree Way San Diego California 92130 / US | 02 /
XIA, Pengfei 5798 Blazing Star Ln San Diego California 92130 / US | [2020/13] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2020/13] | Application number, filing date | 18837218.9 | 13.07.2018 | [2020/13] | WO2018CN95652 | Priority number, date | US201715660769 | 26.07.2017 Original published format: US201715660769 | [2020/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019019932 | Date: | 31.01.2019 | Language: | EN | [2019/05] | Type: | A1 Application with search report | No.: | EP3626017 | Date: | 25.03.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 31.01.2019 takes the place of the publication of the European patent application. | [2020/13] | Type: | B1 Patent specification | No.: | EP3626017 | Date: | 27.04.2022 | Language: | EN | [2022/17] | Search report(s) | International search report - published on: | CN | 31.01.2019 | (Supplementary) European search report - dispatched on: | EP | 28.05.2020 | Classification | IPC: | H04W74/08, // H04W74/00 | [2020/26] | CPC: |
H04W74/0808 (EP,US);
H04W74/085 (KR,US);
H04W24/10 (KR);
H04W74/002 (KR,US);
H04W74/006 (EP,KR,US);
H04W74/0816 (KR);
|
Former IPC [2020/13] | H04W72/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEM UND VERFAHREN FÜR ZUFALLSZUGRIFF EINES BENUTZERGERÄTS ÜBER BREITE BANDBREITE MIT SUBSETBEGRENZUNG | [2020/13] | English: | SYSTEM AND METHOD FOR UE RANDOM ACCESS OVER WIDE BANDWIDTH WITH SUBSET RESTRICTION | [2020/13] | French: | SYSTÈME ET PROCÉDÉ D'ACCÈS ALÉATOIRE PAR UN UE SUR UNE LARGE BANDE PASSANTE AVEC RESTRICTION DE SOUS-ENSEMBLE | [2020/13] | Entry into regional phase | 20.12.2019 | National basic fee paid | 20.12.2019 | Search fee paid | 20.12.2019 | Designation fee(s) paid | 20.12.2019 | Examination fee paid | Examination procedure | 20.12.2019 | Examination requested [2020/13] | 10.12.2020 | Amendment by applicant (claims and/or description) | 12.11.2021 | Communication of intention to grant the patent | 21.03.2022 | Fee for grant paid | 21.03.2022 | Fee for publishing/printing paid | 21.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 31.07.2020 | Renewal fee patent year 03 | 30.07.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.07.2018 | AL | 27.04.2022 | AT | 27.04.2022 | BG | 27.04.2022 | CY | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | ES | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | IT | 27.04.2022 | LT | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | MK | 27.04.2022 | MT | 27.04.2022 | NL | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SE | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | IE | 13.07.2022 | LU | 13.07.2022 | NO | 27.07.2022 | GR | 28.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | FR | 31.07.2022 | LI | 31.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | [2024/51] |
Former [2024/44] | HU | 13.07.2018 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
MT | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 13.07.2022 | ||
LU | 13.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/23] | HU | 13.07.2018 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 13.07.2022 | ||
LU | 13.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/20] | HU | 13.07.2018 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 13.07.2022 | ||
LU | 13.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/18] | HU | 13.07.2018 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 13.07.2022 | ||
LU | 13.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/11] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 13.07.2022 | ||
LU | 13.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/33] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 13.07.2022 | ||
LU | 13.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/25] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
LU | 13.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/22] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
LU | 13.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/21] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
LU | 13.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/17] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/11] | AT | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/09] | AT | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/07] | AT | 27.04.2022 | |
DK | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/51] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/50] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/49] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/47] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
LT | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
NO | 27.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/44] | NL | 27.04.2022 | Documents cited: | Search | [XI]WO2017097203 (HUAWEI TECH CO LTD [CN]); | International search | [A]US2011222486 (HART BRIAN D [US]); | [A]US2012014269 (RAY SIDDHARTH [US], et al); | [A]CN105472741 (ZTE CORP); | [A]WO2016053639 (QUALCOMM INC [US]) |