blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3665677

EP3665677 - AUTOMATED CLINICAL DOCUMENTATION SYSTEM AND METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.05.2024
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  02.06.2023
FormerGrant of patent is intended
Status updated on  13.03.2023
FormerRequest for examination was made
Status updated on  15.05.2020
FormerThe international publication has been made
Status updated on  16.02.2019
Most recent event   Tooltip02.08.2024Lapse of the patent in a contracting state
New state(s): BE, SI
published on 04.09.2024  [2024/36]
Applicant(s)For all designated states
Nuance Communications, Inc.
One Wayside Road
Burlington, MA 01803 / US
[2023/27]
Former [2020/25]For all designated states
Nuance Communications, Inc.
One Wayside Road
Burlington, MA 01803 / US
Inventor(s)01 / GALLOPYN, Guido Remi Marcel
14 Dorothy E. Lucey Drive
Newburyport Massachusetts 01950 / US
02 / SHARMA, Dushyant
36 Cambridge Road
Unit 27
Woburn Massachusetts 01801 / US
03 / JOST, Uwe Helmut
119 Tavern Road
Groton Massachusetts 01450 / US
04 / OWEN, Donald E.
9002 Pecky Cypress Way
Orlando Florida 32836 / US
05 / NAYLOR, Patrick A.
63 Culver Lane
Reading Berkshire RG6 1DX / GB
06 / NOUR-ELDIN, Amr
100 Harrison Garden Blvd.
Unit 612
Toronto Ontario M2N OC2 / CA
07 / ALMENDRO BARREDA, Daniel Paulino
Flat 4 Otley House
102 Gillespie Road
London Greater London N5 1LQ / GB
 [2020/25]
Representative(s)CMS Cameron McKenna Nabarro Olswang LLP
Cannon Place
78 Cannon Street
London EC4N 6AF / GB
[2023/27]
Former [2020/25]Barker Brettell LLP
100 Hagley Road
Edgbaston
Birmingham B16 8QQ / GB
Application number, filing date18843586.109.08.2018
[2020/25]
WO2018US45987
Priority number, dateUS201762543762P10.08.2017         Original published format: US 201762543762 P
US201862638809P05.03.2018         Original published format: US 201862638809 P
[2020/25]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019032815
Date:14.02.2019
Language:EN
[2019/07]
Type: A1 Application with search report 
No.:EP3665677
Date:17.06.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 14.02.2019 takes the place of the publication of the European patent application.
[2020/25]
Type: B1 Patent specification 
No.:EP3665677
Date:05.07.2023
Language:EN
[2023/27]
Search report(s)International search report - published on:US14.02.2019
(Supplementary) European search report - dispatched on:EP26.03.2021
ClassificationIPC:G10L25/48, G16H10/20, G06F40/174, G06F40/30, G06N3/006, H04R3/00, G06V40/16, G06V40/10, H04L51/222, // G10L21/0216, G10L21/0208, G10L21/0272, G10L15/26, H04N7/18, H04R1/40, H04R3/12
[2023/13]
CPC:
G06F40/174 (EP,US); A61B5/7405 (US); G06F16/637 (US);
G06F16/685 (US); G06F16/904 (US); G06F18/25 (US);
G06F21/6245 (US); G06F3/16 (US); G06F40/30 (EP,US);
G06F40/40 (US); G06K19/07762 (US); G06N3/006 (EP,US);
G06T7/00 (US); G06V20/10 (US); G06V20/52 (US);
G06V40/103 (EP,US); G06V40/16 (EP,US); G06V40/172 (US);
G06V40/23 (US); G10L15/08 (US); G10L17/00 (US);
G10L21/0232 (US); G10L25/48 (EP); G11B27/10 (US);
G16B50/00 (US); G16H10/20 (EP,US); G16H10/60 (US);
G16H15/00 (US); G16H30/00 (US); G16H30/20 (US);
G16H30/40 (US); G16H40/20 (US); G16H40/60 (US);
G16H40/63 (US); G16H50/20 (US); G16H50/30 (US);
G16H80/00 (US); G16Y20/00 (US); H04L51/02 (US);
H04L51/222 (EP,US); H04N7/183 (US); H04R1/326 (US);
H04R3/005 (EP,US); H04R3/12 (EP,US); G06N20/00 (EP);
G06T2207/10024 (US); G06T2207/10044 (US); G06T2207/10048 (US);
G06T2207/10116 (US); G06T2207/10132 (US); G10L15/1815 (US);
G10L15/22 (US); G10L15/26 (EP,US); G10L2021/02082 (EP,US);
G10L2021/02166 (EP); G10L21/0272 (EP); H04N7/181 (EP,US);
H04R1/406 (EP,US); H04R2420/07 (US); H04R3/02 (US);
H04S2400/15 (EP,US) (-)
Former IPC [2021/17]G10L21/0272, G10L25/48, G16H10/60, G06F40/174, G06F40/30, G06K9/00, G06N3/00, G16H10/20, G16H15/00, H04R3/00, H04R3/02, H04R3/12, H04R1/40, H04N7/18, H04L12/58, G16H50/20, G16H20/10, G16H40/63, G16H40/67, // G10L21/0216, G10L15/26
Former IPC [2020/25]G10L21/0272, G06F16/60
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/25]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:AUTOMATISIERTES KLINISCHES DOKUMENTATIONSSYSTEM UND -VERFAHREN[2020/25]
English:AUTOMATED CLINICAL DOCUMENTATION SYSTEM AND METHOD[2020/25]
French:SYSTÈME ET PROCÉDÉ DE DOCUMENTATION CLINIQUE AUTOMATISÉE[2020/25]
Entry into regional phase10.03.2020National basic fee paid 
10.03.2020Search fee paid 
10.03.2020Designation fee(s) paid 
10.03.2020Examination fee paid 
Examination procedure10.03.2020Examination requested  [2020/25]
25.10.2021Amendment by applicant (claims and/or description)
14.03.2023Communication of intention to grant the patent
31.05.2023Fee for grant paid
31.05.2023Fee for publishing/printing paid
31.05.2023Receipt of the translation of the claim(s)
Opposition(s)08.04.2024No opposition filed within time limit [2024/24]
Fees paidRenewal fee
28.08.2020Renewal fee patent year 03
26.08.2021Renewal fee patent year 04
18.07.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT05.07.2023
CZ05.07.2023
DK05.07.2023
EE05.07.2023
ES05.07.2023
FI05.07.2023
HR05.07.2023
IT05.07.2023
LT05.07.2023
LV05.07.2023
MC05.07.2023
NL05.07.2023
PL05.07.2023
RO05.07.2023
RS05.07.2023
SE05.07.2023
SI05.07.2023
SK05.07.2023
SM05.07.2023
IE09.08.2023
LU09.08.2023
BE31.08.2023
CH31.08.2023
NO05.10.2023
GR06.10.2023
IS05.11.2023
PT06.11.2023
[2024/36]
Former [2024/33]AT05.07.2023
CZ05.07.2023
DK05.07.2023
EE05.07.2023
ES05.07.2023
FI05.07.2023
HR05.07.2023
IT05.07.2023
LT05.07.2023
LV05.07.2023
MC05.07.2023
NL05.07.2023
PL05.07.2023
RO05.07.2023
RS05.07.2023
SE05.07.2023
SK05.07.2023
SM05.07.2023
IE09.08.2023
LU09.08.2023
CH31.08.2023
NO05.10.2023
GR06.10.2023
IS05.11.2023
PT06.11.2023
Former [2024/26]AT05.07.2023
CZ05.07.2023
DK05.07.2023
EE05.07.2023
ES05.07.2023
FI05.07.2023
HR05.07.2023
IT05.07.2023
LT05.07.2023
LV05.07.2023
MC05.07.2023
NL05.07.2023
PL05.07.2023
RO05.07.2023
RS05.07.2023
SE05.07.2023
SK05.07.2023
SM05.07.2023
LU09.08.2023
CH31.08.2023
NO05.10.2023
GR06.10.2023
IS05.11.2023
PT06.11.2023
Former [2024/23]AT05.07.2023
CZ05.07.2023
DK05.07.2023
EE05.07.2023
ES05.07.2023
FI05.07.2023
HR05.07.2023
LT05.07.2023
LV05.07.2023
MC05.07.2023
NL05.07.2023
PL05.07.2023
RO05.07.2023
RS05.07.2023
SE05.07.2023
SK05.07.2023
SM05.07.2023
LU09.08.2023
CH31.08.2023
NO05.10.2023
GR06.10.2023
IS05.11.2023
PT06.11.2023
Former [2024/22]AT05.07.2023
CZ05.07.2023
DK05.07.2023
ES05.07.2023
FI05.07.2023
HR05.07.2023
LT05.07.2023
LV05.07.2023
NL05.07.2023
PL05.07.2023
RO05.07.2023
RS05.07.2023
SE05.07.2023
SM05.07.2023
LU09.08.2023
NO05.10.2023
GR06.10.2023
IS05.11.2023
PT06.11.2023
Former [2024/21]AT05.07.2023
ES05.07.2023
FI05.07.2023
HR05.07.2023
LT05.07.2023
LV05.07.2023
NL05.07.2023
PL05.07.2023
RS05.07.2023
SE05.07.2023
SM05.07.2023
LU09.08.2023
NO05.10.2023
GR06.10.2023
IS05.11.2023
PT06.11.2023
Former [2024/20]AT05.07.2023
ES05.07.2023
FI05.07.2023
HR05.07.2023
LT05.07.2023
LV05.07.2023
NL05.07.2023
PL05.07.2023
RS05.07.2023
SE05.07.2023
SM05.07.2023
NO05.10.2023
GR06.10.2023
IS05.11.2023
PT06.11.2023
Former [2024/10]AT05.07.2023
ES05.07.2023
FI05.07.2023
HR05.07.2023
LT05.07.2023
LV05.07.2023
NL05.07.2023
PL05.07.2023
RS05.07.2023
SE05.07.2023
NO05.10.2023
GR06.10.2023
IS05.11.2023
PT06.11.2023
Former [2024/09]AT05.07.2023
ES05.07.2023
FI05.07.2023
LT05.07.2023
NL05.07.2023
SE05.07.2023
NO05.10.2023
GR06.10.2023
IS05.11.2023
Former [2024/08]LT05.07.2023
NL05.07.2023
NO05.10.2023
GR06.10.2023
Former [2024/05]NL05.07.2023
Documents cited:Search[A]US2010088095  (JOHN JOSEPH CHOWALLOOR [IN]);
 [XY]US2017116392  (CASELLA DOS SANTOS MARIANA [BE]);
 [Y]US9668066  (BETTS DAVID ANTHONY [GB], et al)
International search[Y]CN101790752  (QUALCOMM INC);
 [Y]US2014093135  (REID C SHANE [US], et al);
 [XY]CN106448722  (IFLYTEK CO LTD)
by applicantUS2017116392
 US9668066
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.