| EP3662369 - SYSTEM AND METHOD FOR SECURING A COMPUTER SYSTEM FROM THREATS INTRODUCED BY USB DEVICES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.01.2024 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 03.02.2023 | ||
| Former | Grant of patent is intended Status updated on 30.10.2022 | ||
| Former | Request for examination was made Status updated on 08.05.2020 | ||
| Former | The international publication has been made Status updated on 16.02.2019 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Cyber Sepio Systems Ltd 63 Rothschild Street 6578510 Tel Aviv / IL | [2020/24] | Inventor(s) | 01 /
APPLEBOUM, Yosef 11018 Gainsborough Rd. Potomac, Maryland 20854 / US | 02 /
BRATSPIESS, Iftah 11 Maharal Street 6248111 Tel-Aviv / IL | 03 /
BEN-ATAR, Bentsi 5 Ha'Imaot Street 7402559 Ness Ziona / IL | [2020/24] | Representative(s) | Zacco GmbH Bayerstrasse 83 80335 München / DE | [2020/24] | Application number, filing date | 18844545.6 | 01.08.2018 | [2020/24] | WO2018IL50857 | Priority number, date | IL20170253823 | 03.08.2017 Original published format: IL 25382317 | IL20170254573 | 18.09.2017 Original published format: IL 25457317 | [2020/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019030748 | Date: | 14.02.2019 | Language: | EN | [2019/07] | Type: | A1 Application with search report | No.: | EP3662369 | Date: | 10.06.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.02.2019 takes the place of the publication of the European patent application. | [2020/24] | Type: | B1 Patent specification | No.: | EP3662369 | Date: | 08.03.2023 | Language: | EN | [2023/10] | Search report(s) | International search report - published on: | US | 14.02.2019 | (Supplementary) European search report - dispatched on: | EP | 23.03.2021 | Classification | IPC: | G06F11/00, G06F21/60, G06F21/85, G06F21/55 | [2021/16] | CPC: |
G06F21/552 (EP,IL,US);
G06F21/85 (EP,IL,US);
G06F21/577 (IL,US);
G06F21/606 (EP);
G06F21/73 (IL,US)
|
| Former IPC [2020/24] | G06F11/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR SICHERUNG EINES RECHNERSYSTEMS GEGEN DURCH USB-GERÄTE EINGEFÜHRTE BEDROHUNGEN | [2020/24] | English: | SYSTEM AND METHOD FOR SECURING A COMPUTER SYSTEM FROM THREATS INTRODUCED BY USB DEVICES | [2020/24] | French: | SYSTÈME ET PROCÉDÉ DE SÉCURISATION D'UN SYSTÈME INFORMATIQUE CONTRE DES MENACES INTRODUITES PAR DES DISPOSITIFS USB | [2022/45] |
| Former [2020/24] | SYSTÈME ET PROCÉDÉ DE SÉCURISATION D'UN SYSTÈME INFORMATIQUE CONTRE DES MENACES INTRODUITES ÈAR DES DISPOSITIFS USB | Entry into regional phase | 18.02.2020 | National basic fee paid | 18.02.2020 | Search fee paid | 18.02.2020 | Designation fee(s) paid | 18.02.2020 | Examination fee paid | Examination procedure | 18.02.2020 | Examination requested [2020/24] | 13.10.2021 | Amendment by applicant (claims and/or description) | 31.10.2022 | Communication of intention to grant the patent | 23.01.2023 | Fee for grant paid | 23.01.2023 | Fee for publishing/printing paid | 23.01.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 11.12.2023 | No opposition filed within time limit [2024/07] | Fees paid | Renewal fee | 03.07.2020 | Renewal fee patent year 03 | 13.08.2021 | Renewal fee patent year 04 | 28.06.2022 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 01.08.2018 | HU | 01.08.2018 | AT | 08.03.2023 | BG | 08.03.2023 | CZ | 08.03.2023 | DK | 08.03.2023 | EE | 08.03.2023 | ES | 08.03.2023 | FI | 08.03.2023 | HR | 08.03.2023 | IT | 08.03.2023 | LT | 08.03.2023 | LV | 08.03.2023 | MC | 08.03.2023 | NL | 08.03.2023 | PL | 08.03.2023 | RO | 08.03.2023 | RS | 08.03.2023 | SE | 08.03.2023 | SI | 08.03.2023 | SK | 08.03.2023 | SM | 08.03.2023 | TR | 08.03.2023 | NO | 08.06.2023 | GR | 09.06.2023 | IS | 08.07.2023 | PT | 10.07.2023 | IE | 01.08.2023 | LU | 01.08.2023 | BE | 31.08.2023 | CH | 31.08.2023 | FR | 31.08.2023 | [2026/04] |
| Former [2025/39] | CY | 01.08.2018 | |
| HU | 01.08.2018 | ||
| AT | 08.03.2023 | ||
| BG | 08.03.2023 | ||
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| IT | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| IE | 01.08.2023 | ||
| LU | 01.08.2023 | ||
| BE | 31.08.2023 | ||
| CH | 31.08.2023 | ||
| FR | 31.08.2023 | ||
| Former [2025/36] | CY | 01.08.2018 | |
| AT | 08.03.2023 | ||
| BG | 08.03.2023 | ||
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| IT | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| IE | 01.08.2023 | ||
| LU | 01.08.2023 | ||
| BE | 31.08.2023 | ||
| CH | 31.08.2023 | ||
| FR | 31.08.2023 | ||
| Former [2024/51] | AT | 08.03.2023 | |
| BG | 08.03.2023 | ||
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| IT | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| IE | 01.08.2023 | ||
| LU | 01.08.2023 | ||
| BE | 31.08.2023 | ||
| CH | 31.08.2023 | ||
| FR | 31.08.2023 | ||
| Former [2024/36] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| IT | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| IE | 01.08.2023 | ||
| LU | 01.08.2023 | ||
| BE | 31.08.2023 | ||
| CH | 31.08.2023 | ||
| FR | 31.08.2023 | ||
| Former [2024/34] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| IT | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| IE | 01.08.2023 | ||
| LU | 01.08.2023 | ||
| CH | 31.08.2023 | ||
| FR | 31.08.2023 | ||
| Former [2024/33] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| IT | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| IE | 01.08.2023 | ||
| LU | 01.08.2023 | ||
| CH | 31.08.2023 | ||
| Former [2024/26] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| IT | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| LU | 01.08.2023 | ||
| CH | 31.08.2023 | ||
| Former [2024/24] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| LU | 01.08.2023 | ||
| CH | 31.08.2023 | ||
| Former [2024/21] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| LU | 01.08.2023 | ||
| Former [2024/16] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2024/10] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2023/50] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2023/49] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| PT | 10.07.2023 | ||
| Former [2023/48] | AT | 08.03.2023 | |
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| PT | 10.07.2023 | ||
| Former [2023/46] | ES | 08.03.2023 | |
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| PT | 10.07.2023 | ||
| Former [2023/38] | ES | 08.03.2023 | |
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| Former [2023/37] | ES | 08.03.2023 | |
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| Former [2023/36] | ES | 08.03.2023 | |
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| Former [2023/35] | ES | 08.03.2023 | |
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| Former [2023/34] | ES | 08.03.2023 | |
| LT | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| Former [2023/33] | ES | 08.03.2023 | |
| LT | 08.03.2023 | Documents cited: | Search | [XI] US2014215637 (MOORE TERRILL M et al.) [X] 1-4,7-15,19,20,26 * abstract * * paragraph [0024] * * paragraph [0028] - paragraph [0040] * * claims 21, 27-32 * * figure 3 *[I] 5,6,16-18,21-25 | [XI] US8230149 (LONG NGO BACH et al.) [X] 1-4,8,9,11,13,14,19,20,26 * abstract * * column 2, line 54 - column 7, line 10 * * column 13, line 24 - column 15, line 25 * * claims 1, 7 * * figures 1, 6 *[I] 5-7,10,12,15-18,21-25 | [XI] US2016373408 (WENTWORTH STRAFFORD et al.) [X] 1-4,8-13,19,20,26 * abstract * * paragraph [0046] - paragraph [0068] * * figures 5-7 *[I] 5-7,14-18,21-25 | International search | [XY] US2014337558 (POWERS JUDSON et al.) [X] 1-24, 26 * , entire document, especially abstract and para [0004], [0036], [0043], [0048]-[0055], [0058].[0061], Figs. 1A-1F. *[Y] 25 | [Y] US2009002085 (TARNG MIN MING et al.) [Y] 25 * , entire document, especially abstract and para [0113], [0140]-[0142]. * | [A] US2015365237 (SOFFER AVIV et al.) [A] 1-26 * , entire document. * | by applicant | WO2017158593 | US2014215637 | US8230149 | US2016373408 |