EP3665722 - SYSTEM AND METHOD FOR IMPLEMENTING CONFIGURABLE CONVOLUTED NEURAL NETWORKS WITH FLASH MEMORIES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.05.2024 Database last updated on 21.12.2024 | |
Former | The patent has been granted Status updated on 23.06.2023 | ||
Former | Grant of patent is intended Status updated on 09.02.2023 | ||
Former | Examination is in progress Status updated on 10.06.2022 | ||
Former | Request for examination was made Status updated on 15.05.2020 | ||
Former | The international publication has been made Status updated on 22.03.2019 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Silicon Storage Technology, Inc. 450 Holger Way San Jose, CA 95134 / US | [2020/25] | Inventor(s) | 01 /
TIWARI, Vipin 10753 Craigtown Ln. Dublin, CA 94568 / US | 02 /
DO, Nhan 20451 Walnut Ave. Saratoga, CA 95070 / US | [2020/25] | Representative(s) | Betten & Resch Patent- und Rechtsanwälte PartGmbB Maximiliansplatz 14 80333 München / DE | [2020/25] | Application number, filing date | 18856570.9 | 22.08.2018 | [2020/25] | WO2018US47438 | Priority number, date | US201762558984P | 15.09.2017 Original published format: US 201762558984 P | US201816107282 | 21.08.2018 Original published format: US201816107282 | [2020/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019055182 | Date: | 21.03.2019 | Language: | EN | [2019/12] | Type: | A1 Application with search report | No.: | EP3665722 | Date: | 17.06.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.03.2019 takes the place of the publication of the European patent application. | [2020/25] | Type: | B1 Patent specification | No.: | EP3665722 | Date: | 26.07.2023 | Language: | EN | [2023/30] | Search report(s) | International search report - published on: | US | 21.03.2019 | (Supplementary) European search report - dispatched on: | EP | 28.09.2021 | Classification | IPC: | G11C16/04, G11C5/02, G11C7/10, G06N3/04, G06N3/063, G11C16/24, H10B41/30, G06N3/045, G06N3/048, G06N3/065 | [2023/09] | CPC: |
G11C16/0425 (EP,KR,US);
G06N3/045 (EP);
G06N3/048 (EP);
G06N3/061 (KR,US);
G06N3/063 (US);
G06N3/065 (EP);
G11C16/24 (EP,US);
G11C5/02 (EP);
G11C7/1006 (EP);
|
Former IPC [2021/23] | G11C16/04, G11C5/02, G11C7/10, H01L27/11521, G06N3/04, G06N3/063, G11C16/24 | ||
Former IPC [2020/25] | H01L27/02, H01L27/04, H01L27/07, H01L27/11507, H01L27/11517, H01L29/02, G11C7/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/25] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR IMPLEMENTIERUNG KONFIGURIERBARER GEFALTETER NEURONALER NETZE MIT FLASH-SPEICHERN | [2020/25] | English: | SYSTEM AND METHOD FOR IMPLEMENTING CONFIGURABLE CONVOLUTED NEURAL NETWORKS WITH FLASH MEMORIES | [2020/25] | French: | SYSTÈME ET PROCÉDÉ DE MISE EN OEUVRE DE RÉSEAUX NEURONAUX CONVOLUTÉS CONFIGURABLES AVEC DES MÉMOIRES FLASH | [2020/25] | Entry into regional phase | 12.03.2020 | National basic fee paid | 12.03.2020 | Search fee paid | 12.03.2020 | Designation fee(s) paid | 12.03.2020 | Examination fee paid | Examination procedure | 12.03.2020 | Examination requested [2020/25] | 08.04.2022 | Amendment by applicant (claims and/or description) | 09.06.2022 | Despatch of a communication from the examining division (Time limit: M04) | 10.10.2022 | Reply to a communication from the examining division | 10.02.2023 | Communication of intention to grant the patent | 19.06.2023 | Fee for grant paid | 19.06.2023 | Fee for publishing/printing paid | 19.06.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | EP23179955.2 / EP4235512 | EP23180121.8 / EP4235513 | Opposition(s) | 29.04.2024 | No opposition filed within time limit [2024/27] | Fees paid | Renewal fee | 19.08.2020 | Renewal fee patent year 03 | 18.08.2021 | Renewal fee patent year 04 | 19.08.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 26.07.2023 | BG | 26.07.2023 | CZ | 26.07.2023 | DK | 26.07.2023 | EE | 26.07.2023 | ES | 26.07.2023 | FI | 26.07.2023 | HR | 26.07.2023 | IT | 26.07.2023 | LT | 26.07.2023 | LV | 26.07.2023 | MC | 26.07.2023 | PL | 26.07.2023 | RO | 26.07.2023 | RS | 26.07.2023 | SE | 26.07.2023 | SI | 26.07.2023 | SK | 26.07.2023 | SM | 26.07.2023 | IE | 22.08.2023 | LU | 22.08.2023 | BE | 31.08.2023 | CH | 31.08.2023 | GB | 26.10.2023 | NO | 26.10.2023 | GR | 27.10.2023 | IS | 26.11.2023 | PT | 27.11.2023 | [2024/51] |
Former [2024/36] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
EE | 26.07.2023 | ||
ES | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
IT | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
MC | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SI | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
IE | 22.08.2023 | ||
LU | 22.08.2023 | ||
BE | 31.08.2023 | ||
CH | 31.08.2023 | ||
GB | 26.10.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/33] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
EE | 26.07.2023 | ||
ES | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
IT | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
MC | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
IE | 22.08.2023 | ||
LU | 22.08.2023 | ||
CH | 31.08.2023 | ||
GB | 26.10.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/26] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
EE | 26.07.2023 | ||
ES | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
IT | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
MC | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 22.08.2023 | ||
CH | 31.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/23] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
EE | 26.07.2023 | ||
ES | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
MC | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SK | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 22.08.2023 | ||
CH | 31.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/22] | AT | 26.07.2023 | |
CZ | 26.07.2023 | ||
DK | 26.07.2023 | ||
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
PL | 26.07.2023 | ||
RO | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 22.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/21] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
PL | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SM | 26.07.2023 | ||
LU | 22.08.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/20] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
PL | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
SM | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/10] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
HR | 26.07.2023 | ||
LT | 26.07.2023 | ||
LV | 26.07.2023 | ||
PL | 26.07.2023 | ||
RS | 26.07.2023 | ||
SE | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
PT | 27.11.2023 | ||
Former [2024/09] | AT | 26.07.2023 | |
FI | 26.07.2023 | ||
LT | 26.07.2023 | ||
SE | 26.07.2023 | ||
NO | 26.10.2023 | ||
GR | 27.10.2023 | ||
IS | 26.11.2023 | ||
Former [2024/08] | LT | 26.07.2023 | |
NO | 26.10.2023 | ||
GR | 27.10.2023 | Documents cited: | Search | [YA]US2005185464 (CHIH YEU-DER [TW]); | [A]US2015145060 (ZHOU ZHIBIAO [SG], et al); | [AI]US2016254269 (KIM JINHO [US], et al); | International search | [Y]US5554874 (DOLUCA SINAN [US]); | [A]US6222777 (KHIEU CONG [US]); | [YA]US2002089014 (CHERN GEENG-CHUAN [US]); | [A]US2013100756 (LIAO WEI-LI [TW], et al); | [Y]US2016254269 (KIM JINHO [US], et al) |