EP3605646 - BATTERY PACK HAVING BOTTOM CONNECTION TYPE TRAY AND METHOD OF MANUFACTURING THE SAME. [Right-click to bookmark this link] | |||
Former [2020/06] | BATTERY PACK HAVING BOTTOM CONNECTION TYPE TRAY AND MANUFACTURING METHOD THEREOF | ||
[2021/07] | Status | No opposition filed within time limit Status updated on 24.12.2021 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 15.01.2021 | ||
Former | Grant of patent is intended Status updated on 10.11.2020 | ||
Former | Request for examination was made Status updated on 03.01.2020 | ||
Former | The international publication has been made Status updated on 11.05.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states LG Chem, Ltd. 128, Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | [2020/06] | Inventor(s) | 01 /
KIM, Kyung Mo 188 Munji-ro Yuseong-gu Daejeon 34122 / KR | 02 /
MOON, Jeong Oh 188 Munji-ro Yuseong-gu Daejeon 34122 / KR | 03 /
LEE, Jung Hoon 188 Munji-ro Yuseong-gu Daejeon 34122 / KR | 04 /
CHI, Ho June 188 Munji-ro Yuseong-gu Daejeon 34122 / KR | 05 /
PARK, Jin Yong 188 Munji-ro Yuseong-gu Daejeon 34122 / KR | [2020/06] | Representative(s) | Plasseraud IP 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | [2020/06] | Application number, filing date | 18871903.3 | 04.09.2018 | [2020/06] | WO2018KR10286 | Priority number, date | KR20170143721 | 31.10.2017 Original published format: KR 20170143721 | [2020/06] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019088438 | Date: | 09.05.2019 | Language: | KO | [2019/19] | Type: | A1 Application with search report | No.: | EP3605646 | Date: | 05.02.2020 | Language: | EN | [2020/06] | Type: | B1 Patent specification | No.: | EP3605646 | Date: | 17.02.2021 | Language: | EN | [2021/07] | Search report(s) | International search report - published on: | KR | 09.05.2019 | (Supplementary) European search report - dispatched on: | EP | 19.06.2020 | Classification | IPC: | H01M2/10, H01M2/30, B29C45/14, B29L31/34, H01M2/20, B60L50/50 | [2020/30] | CPC: |
H01M50/204 (EP,KR,US);
B29C45/14467 (US);
B29C45/14 (EP,KR);
B60L50/50 (EP,KR);
B60L50/64 (KR,US);
B60L50/66 (KR);
H01M50/256 (KR);
H01M50/296 (EP,KR,US);
H01M50/298 (EP,KR,US);
H01M50/503 (EP,KR,US);
H01M50/543 (KR);
B29L2031/3468 (KR,US);
|
Former IPC [2020/06] | H01M2/10, H01M2/30, B29C45/14, B29L31/34 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/06] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | BATTERIEPACK MIT BODENVERBINDUNGSARTIGEM FACH UND HERSTELLUNGSVERFAHREN DAFÜR | [2020/06] | English: | BATTERY PACK HAVING BOTTOM CONNECTION TYPE TRAY AND METHOD OF MANUFACTURING THE SAME. | [2021/07] | French: | BLOC-BATTERIE AYANT UN SUPPORT DE TYPE À CONNEXION INFÉRIEURE ET SON PROCÉDÉ DE FABRICATION | [2020/06] |
Former [2020/06] | BATTERY PACK HAVING BOTTOM CONNECTION TYPE TRAY AND MANUFACTURING METHOD THEREOF | Entry into regional phase | 29.10.2019 | Translation filed | 29.10.2019 | National basic fee paid | 29.10.2019 | Search fee paid | 29.10.2019 | Designation fee(s) paid | 29.10.2019 | Examination fee paid | Examination procedure | 29.10.2019 | Examination requested [2020/06] | 09.09.2020 | Amendment by applicant (claims and/or description) | 11.11.2020 | Communication of intention to grant the patent | 06.01.2021 | Fee for grant paid | 06.01.2021 | Fee for publishing/printing paid | 06.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 18.11.2021 | No opposition filed within time limit [2022/04] | Fees paid | Renewal fee | 24.09.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.09.2018 | AL | 17.02.2021 | AT | 17.02.2021 | CY | 17.02.2021 | CZ | 17.02.2021 | DK | 17.02.2021 | EE | 17.02.2021 | ES | 17.02.2021 | FI | 17.02.2021 | HR | 17.02.2021 | IT | 17.02.2021 | LT | 17.02.2021 | LV | 17.02.2021 | MC | 17.02.2021 | MK | 17.02.2021 | NL | 17.02.2021 | RO | 17.02.2021 | RS | 17.02.2021 | SI | 17.02.2021 | SK | 17.02.2021 | SM | 17.02.2021 | TR | 17.02.2021 | BG | 17.05.2021 | NO | 17.05.2021 | GR | 18.05.2021 | IS | 17.06.2021 | PT | 17.06.2021 | IE | 04.09.2021 | LU | 04.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | [2024/29] |
Former [2024/23] | HU | 04.09.2018 | |
AL | 17.02.2021 | ||
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
MK | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
IE | 04.09.2021 | ||
LU | 04.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/33] | HU | 04.09.2018 | |
AL | 17.02.2021 | ||
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
IE | 04.09.2021 | ||
LU | 04.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/30] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
IE | 04.09.2021 | ||
LU | 04.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
IE | 04.09.2021 | ||
LU | 04.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/35] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
IE | 04.09.2021 | ||
LU | 04.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
LU | 04.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/25] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/23] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/13] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/10] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/08] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/07] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/50] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/49] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/48] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/46] | AT | 17.02.2021 | |
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/42] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RS | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/38] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RS | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/37] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
RS | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/36] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/35] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/33] | FI | 17.02.2021 | |
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | Documents cited: | Search | [Y]CN104393209 (UNIV HUNAN) [Y] 1-13 * the whole document *; | [Y]WO2017183012 (EVANS JUSTIN [US]) [Y] 1-13* page 3, line 9 - page 5, line 7; figures 1,2 * | International search | [Y]KR20120081823 (V ENS [KR]) [Y] 13 * See claims 1-4. *; | [A]US2013037336 (OJEDA PETER A [US], et al) [A] 1-13* See the entire document. *; | [A]KR20130140245 (HYUNDAI MOTOR CO LTD [KR], et al) [A] 1-13 * See the entire document. *; | [A]JP5541100B (MITSUBISHI MOTORS CORP.) [A] 1-13 * See the entire document. *; | [XY]CN104393209 (UNIV HUNAN) [X] 1-12 * See paragraphs [0056]-[0064]; claims 1-5; and figures 1-14 * [Y] 13 | by applicant | KR20170143721 |