EP3714315 - A CONICAL OPTICAL COMBINER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.02.2023 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 04.03.2022 | ||
Former | Grant of patent is intended Status updated on 27.10.2021 | ||
Former | Request for examination was made Status updated on 28.08.2020 | ||
Former | The international publication has been made Status updated on 28.05.2019 | Most recent event Tooltip | 15.11.2024 | Change - lapse in a contracting state Updated state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Elbit Systems Ltd. Advanced Technology Center Hof Hacarmel P.O. Box 539 3100401 Haifa / IL | [2020/40] | Inventor(s) | 01 /
SCHNEIDER, Ron P O Box 539 3100401 Haifa / IL | 02 /
BENESH, Gil P O Box 539 3100401 Haifa / IL | 03 /
ARLIEVSKY, Aron P O Box 539 3100401 Haifa / IL | [2020/40] | Representative(s) | Pearl Cohen Zedek Latzer Baratz UK LLP The Gridiron Building One Pancras Square London N1C 4AG / GB | [2020/40] | Application number, filing date | 18877916.9 | 20.11.2018 | [2020/40] | WO2018IL51250 | Priority number, date | IL20170255795 | 20.11.2017 Original published format: IL 25579517 | [2020/40] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019097522 | Date: | 23.05.2019 | Language: | EN | [2019/21] | Type: | A1 Application with search report | No.: | EP3714315 | Date: | 30.09.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.05.2019 takes the place of the publication of the European patent application. | [2020/40] | Type: | B1 Patent specification | No.: | EP3714315 | Date: | 06.04.2022 | Language: | EN | [2022/14] | Search report(s) | International search report - published on: | IL | 23.05.2019 | (Supplementary) European search report - dispatched on: | EP | 04.12.2020 | Classification | IPC: | G02B27/01, G02B27/10, G02B27/12, G02B27/14, G02B27/28 | [2021/01] | CPC: |
G02B27/0172 (EP,US);
G02B27/017 (IL);
G02B27/0179 (US);
G02B27/1066 (EP);
G02B27/123 (EP);
G02B27/144 (EP);
G02B27/283 (EP);
G02F1/0072 (IL);
G02B2027/011 (EP,US);
G02B2027/0118 (US);
G02B2027/012 (EP);
G02B2027/013 (EP,US);
|
Former IPC [2020/40] | G02B27/01, G02F1/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/40] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | KONISCHER OPTISCHER KOMBINATOR | [2020/40] | English: | A CONICAL OPTICAL COMBINER | [2020/40] | French: | COMBINATEUR OPTIQUE CONIQUE | [2020/40] | Entry into regional phase | 19.06.2020 | National basic fee paid | 19.06.2020 | Search fee paid | 19.06.2020 | Designation fee(s) paid | 19.06.2020 | Examination fee paid | Examination procedure | 19.06.2020 | Examination requested [2020/40] | 28.10.2021 | Communication of intention to grant the patent | 23.02.2022 | Fee for grant paid | 23.02.2022 | Fee for publishing/printing paid | 23.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 10.01.2023 | No opposition filed within time limit [2023/11] | Fees paid | Renewal fee | 13.11.2020 | Renewal fee patent year 03 | 19.10.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.11.2018 | AL | 06.04.2022 | AT | 06.04.2022 | BG | 06.04.2022 | CY | 06.04.2022 | CZ | 06.04.2022 | DK | 06.04.2022 | EE | 06.04.2022 | FI | 06.04.2022 | HR | 06.04.2022 | LT | 06.04.2022 | LV | 06.04.2022 | MC | 06.04.2022 | MK | 06.04.2022 | MT | 06.04.2022 | NL | 06.04.2022 | PL | 06.04.2022 | RO | 06.04.2022 | RS | 06.04.2022 | SE | 06.04.2022 | SI | 06.04.2022 | SK | 06.04.2022 | SM | 06.04.2022 | TR | 06.04.2022 | NO | 06.07.2022 | GR | 07.07.2022 | IS | 06.08.2022 | PT | 08.08.2022 | IE | 20.11.2022 | LU | 20.11.2022 | BE | 30.11.2022 | CH | 30.11.2022 | LI | 30.11.2022 | [2024/51] |
Former [2024/44] | HU | 20.11.2018 | |
AL | 06.04.2022 | ||
AT | 06.04.2022 | ||
CY | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
MK | 06.04.2022 | ||
MT | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
TR | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
IE | 20.11.2022 | ||
LU | 20.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/29] | HU | 20.11.2018 | |
AL | 06.04.2022 | ||
AT | 06.04.2022 | ||
CY | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
MK | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
TR | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
IE | 20.11.2022 | ||
LU | 20.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/27] | HU | 20.11.2018 | |
AL | 06.04.2022 | ||
AT | 06.04.2022 | ||
CY | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
MK | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
IE | 20.11.2022 | ||
LU | 20.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/24] | HU | 20.11.2018 | |
AL | 06.04.2022 | ||
AT | 06.04.2022 | ||
CY | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
IE | 20.11.2022 | ||
LU | 20.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/21] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CY | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
IE | 20.11.2022 | ||
LU | 20.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/49] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
IE | 20.11.2022 | ||
LU | 20.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/48] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
IE | 20.11.2022 | ||
LU | 20.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/37] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
LU | 20.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/35] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/31] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/25] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/17] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/09] | AT | 06.04.2022 | |
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/07] | AT | 06.04.2022 | |
DK | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2022/51] | AT | 06.04.2022 | |
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2022/50] | AT | 06.04.2022 | |
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/49] | AT | 06.04.2022 | |
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/47] | AT | 06.04.2022 | |
FI | 06.04.2022 | ||
LT | 06.04.2022 | ||
NL | 06.04.2022 | ||
SE | 06.04.2022 | ||
NO | 06.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/44] | NL | 06.04.2022 | Documents cited: | Search | [A]WO9820381 (HONEYWELL INC [US]) [A] 1-11 * the whole document *; | [A]US2010195056 (YOO JINN-CHOU [TW], et al) [A] 1-11 * figures 1,2 *; | [A]US2012119978 (BORDER JOHN N [US], et al) [A] 1-11 * figures 4,5 *; | [A]US2015153577 (NIKITIN IGOR [DE], et al) [A] 1-11* figures 5,6 *; | [A]US2016139413 (GRIBETZ MERON [US], et al) [A] 1-11 * figures 2,4 *; | [A]US2017212352 (COBB JOSHUA MONROE [US], et al) [A] 1-11 * the whole document * | International search | [A]US2012212400 (BORDER JOHN N [US], et al) [A] 1-11 * The whole document *; | [A]US2016026253 (BRADSKI GARY R [US], et al) [A] 1-11* The whole document * |