| EP3685742 - COMPOSITE WIRING, CAPACITANCE SENSOR, MULTIPLEXING CABLE, AND WIRING FOR INCORPORATION INTO ELEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.03.2024 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 21.04.2023 | ||
| Former | Grant of patent is intended Status updated on 13.12.2022 | ||
| Former | Examination is in progress Status updated on 26.05.2022 | ||
| Former | Request for examination was made Status updated on 26.06.2020 | ||
| Former | The international publication has been made Status updated on 28.05.2019 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Nippon Telegraph And Telephone Corporation 5-1 Otemachi 1-chome Chiyoda-ku, Tokyo 100-8116 / JP | [2020/31] | Inventor(s) | 01 /
TSUKADA, Shingo c/o NTT Intellectual Property Center 9-11 Midori-cho 3-chome Musashino-shi Tokyo 180-8585 / JP | 02 /
NAKASHIMA, Hiroshi c/o NTT Intellectual Property Center 9-11 Midori-cho 3-chome Musashino-shi Tokyo 180-8585 / JP | [2023/21] |
| Former [2020/31] | 01 /
TSUKADA Shingo c/o NTT Intellectual Property Center 9-11 Midori-cho 3-chome Musashino-shi Tokyo 180-8585 / JP | ||
| 02 /
NAKASHIMA Hiroshi c/o NTT Intellectual Property Center 9-11 Midori-cho 3-chome Musashino-shi Tokyo 180-8585 / JP | Representative(s) | Brevalex Tour Trinity 1 B Place de la Défense 92400 Courbevoie / FR | [N/P] |
| Former [2023/21] | Brevalex Tour Trinity 1 Bis Esplanade de La Défense CS 60347 92035 Paris La Défense Cedex / FR | ||
| Former [2020/31] | Brevalex 95, rue d'Amsterdam 75378 Paris Cedex 8 / FR | Application number, filing date | 18879111.5 | 13.11.2018 | [2020/31] | WO2018JP41951 | Priority number, date | JP20170220479 | 15.11.2017 Original published format: JP 2017220479 | [2020/31] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019098182 | Date: | 23.05.2019 | Language: | JA | [2019/21] | Type: | A1 Application with search report | No.: | EP3685742 | Date: | 29.07.2020 | Language: | EN | [2020/31] | Type: | B1 Patent specification | No.: | EP3685742 | Date: | 24.05.2023 | Language: | EN | [2023/21] | Search report(s) | International search report - published on: | JP | 23.05.2019 | (Supplementary) European search report - dispatched on: | EP | 23.09.2021 | Classification | IPC: | H01B7/06, A61B5/00, A61B5/25, A61B5/291 | [2021/43] | CPC: |
A61B5/6804 (EP);
A61B5/256 (EP,US);
A61B5/282 (US);
A61B5/6802 (US);
H01B7/06 (EP,US);
A61B2562/125 (EP);
|
| Former IPC [2020/31] | A61B5/0408, A61B5/0478, H01B7/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/31] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERBUNDVERDRAHTUNG, KAPAZITÄTSSENSOR, MULTIPLEXKABEL UND VERDRAHTUNG ZUM EINBAU IN EIN ELEMENT | [2020/31] | English: | COMPOSITE WIRING, CAPACITANCE SENSOR, MULTIPLEXING CABLE, AND WIRING FOR INCORPORATION INTO ELEMENT | [2020/31] | French: | CÂBLAGE COMPOSITE, CAPTEUR DE CAPACITÉ, CÂBLE DE MULTIPLEXAGE ET CÂBLAGE POUR INCORPORATION DANS UN ÉLÉMENT | [2020/31] | Entry into regional phase | 24.04.2020 | Translation filed | 24.04.2020 | National basic fee paid | 24.04.2020 | Search fee paid | 24.04.2020 | Designation fee(s) paid | 24.04.2020 | Examination fee paid | Examination procedure | 24.04.2020 | Examination requested [2020/31] | 15.03.2022 | Amendment by applicant (claims and/or description) | 25.05.2022 | Despatch of a communication from the examining division (Time limit: M04) | 20.09.2022 | Reply to a communication from the examining division | 14.12.2022 | Communication of intention to grant the patent | 13.04.2023 | Fee for grant paid | 13.04.2023 | Fee for publishing/printing paid | 13.04.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | EP23168110.7 / EP4235703 | Opposition(s) | 27.02.2024 | No opposition filed within time limit [2024/18] | Fees paid | Renewal fee | 26.10.2020 | Renewal fee patent year 03 | 29.10.2021 | Renewal fee patent year 04 | 30.11.2022 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 13.11.2018 | HU | 13.11.2018 | AT | 24.05.2023 | BG | 24.05.2023 | CZ | 24.05.2023 | DK | 24.05.2023 | EE | 24.05.2023 | ES | 24.05.2023 | FI | 24.05.2023 | HR | 24.05.2023 | LT | 24.05.2023 | LV | 24.05.2023 | MC | 24.05.2023 | NL | 24.05.2023 | PL | 24.05.2023 | RO | 24.05.2023 | RS | 24.05.2023 | SE | 24.05.2023 | SI | 24.05.2023 | SK | 24.05.2023 | SM | 24.05.2023 | TR | 24.05.2023 | NO | 24.08.2023 | GR | 25.08.2023 | IS | 24.09.2023 | PT | 25.09.2023 | IE | 13.11.2023 | LU | 13.11.2023 | BE | 30.11.2023 | CH | 30.11.2023 | [2026/04] |
| Former [2025/39] | CY | 13.11.2018 | |
| HU | 13.11.2018 | ||
| AT | 24.05.2023 | ||
| BG | 24.05.2023 | ||
| CZ | 24.05.2023 | ||
| DK | 24.05.2023 | ||
| EE | 24.05.2023 | ||
| ES | 24.05.2023 | ||
| FI | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| MC | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RO | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| SI | 24.05.2023 | ||
| SK | 24.05.2023 | ||
| SM | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| IE | 13.11.2023 | ||
| LU | 13.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2025/36] | CY | 13.11.2018 | |
| AT | 24.05.2023 | ||
| BG | 24.05.2023 | ||
| CZ | 24.05.2023 | ||
| DK | 24.05.2023 | ||
| EE | 24.05.2023 | ||
| ES | 24.05.2023 | ||
| FI | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| MC | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RO | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| SI | 24.05.2023 | ||
| SK | 24.05.2023 | ||
| SM | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| IE | 13.11.2023 | ||
| LU | 13.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/51] | AT | 24.05.2023 | |
| BG | 24.05.2023 | ||
| CZ | 24.05.2023 | ||
| DK | 24.05.2023 | ||
| EE | 24.05.2023 | ||
| ES | 24.05.2023 | ||
| FI | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| MC | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RO | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| SI | 24.05.2023 | ||
| SK | 24.05.2023 | ||
| SM | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| IE | 13.11.2023 | ||
| LU | 13.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/47] | AT | 24.05.2023 | |
| CZ | 24.05.2023 | ||
| DK | 24.05.2023 | ||
| EE | 24.05.2023 | ||
| ES | 24.05.2023 | ||
| FI | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| MC | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RO | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| SI | 24.05.2023 | ||
| SK | 24.05.2023 | ||
| SM | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| IE | 13.11.2023 | ||
| LU | 13.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/46] | AT | 24.05.2023 | |
| CZ | 24.05.2023 | ||
| DK | 24.05.2023 | ||
| EE | 24.05.2023 | ||
| ES | 24.05.2023 | ||
| FI | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| MC | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RO | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| SI | 24.05.2023 | ||
| SK | 24.05.2023 | ||
| SM | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| IE | 13.11.2023 | ||
| LU | 13.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/34] | AT | 24.05.2023 | |
| CZ | 24.05.2023 | ||
| DK | 24.05.2023 | ||
| EE | 24.05.2023 | ||
| ES | 24.05.2023 | ||
| FI | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| MC | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RO | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| SI | 24.05.2023 | ||
| SK | 24.05.2023 | ||
| SM | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| LU | 13.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/32] | AT | 24.05.2023 | |
| CZ | 24.05.2023 | ||
| DK | 24.05.2023 | ||
| EE | 24.05.2023 | ||
| ES | 24.05.2023 | ||
| FI | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| MC | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RO | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| SI | 24.05.2023 | ||
| SK | 24.05.2023 | ||
| SM | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| Former [2024/24] | AT | 24.05.2023 | |
| CZ | 24.05.2023 | ||
| DK | 24.05.2023 | ||
| EE | 24.05.2023 | ||
| ES | 24.05.2023 | ||
| FI | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RO | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| SI | 24.05.2023 | ||
| SK | 24.05.2023 | ||
| SM | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| Former [2024/10] | AT | 24.05.2023 | |
| CZ | 24.05.2023 | ||
| DK | 24.05.2023 | ||
| EE | 24.05.2023 | ||
| ES | 24.05.2023 | ||
| FI | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RO | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| SK | 24.05.2023 | ||
| SM | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| Former [2024/08] | AT | 24.05.2023 | |
| ES | 24.05.2023 | ||
| FI | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| SK | 24.05.2023 | ||
| SM | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| Former [2024/03] | AT | 24.05.2023 | |
| ES | 24.05.2023 | ||
| FI | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| Former [2024/01] | AT | 24.05.2023 | |
| ES | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| LT | 24.05.2023 | ||
| LV | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| Former [2023/51] | AT | 24.05.2023 | |
| ES | 24.05.2023 | ||
| HR | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| RS | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| Former [2023/50] | AT | 24.05.2023 | |
| ES | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| PL | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| GR | 25.08.2023 | ||
| IS | 24.09.2023 | ||
| PT | 25.09.2023 | ||
| Former [2023/48] | AT | 24.05.2023 | |
| ES | 24.05.2023 | ||
| NL | 24.05.2023 | ||
| SE | 24.05.2023 | ||
| NO | 24.08.2023 | ||
| PT | 25.09.2023 | ||
| Former [2023/46] | ES | 24.05.2023 | |
| PT | 25.09.2023 | Documents cited: | Search | [A] JPS5717007 [A] 1-3,5,6 * abstract * | [A] JPS59118228 [A] 1-3,5,6 * abstract * | [A] JPH0543420 [A] 1-3,5,6 * abstract * | [A] JP2012227061 (ASAHI KASEI FIBERS CORP et al.) [A] 1-3,5,6 * abstract * | [A] JP2017121442 (PANASONIC IP MAN CORP et al.) [A] 1-3,5,6 * abstract * | [A] WO2013103970 (MOXYTRONIX et al.) [A] 1-3,5,6 * abstract * | [A] US2006185873 (JOHNSON JASON G et al.) [A] 1-3,5,6 * figures 1A,5,6 * | [A] EP1404219 (VIVOMETRICS INC et al.) [A] 2,5,6 * abstract * | [A] WO2015138515 (LIFE CORP SA et al.) [A] 2,5,6 * abstract * | [A] US4568401 (DAVIS ERVIN M et al.) [A] 1-3 * abstract * | International search | [A] JPS5717007 [A] 1-6 * , specification, page 1, line 12 to page 3, line 8 (Family: none) * | [A] JPS59118228 [A] 1-6 * , specification, page 2, line 9 to page 14, line 15 (Family: none) * | [A] JPH0543420 [A] 1-6 * , paragraphs [0013]-[0022] (Family: none) * | [A] JP2012227061 (ASAHI KASEI FIBERS CORP et al.) [A] 1-6 * , paragraphs [0009]-[0047] (Family: none) * | [A] JP2017121442 (PANASONIC IP MAN CORP et al.) [A] 1-6 * , paragraph [0024] (Family: none) * | by applicant | JP2017220479 | "Highly conductive membrane wiring board - Fujikura Co., Ltd.", FUJIKURA TECHNICAL REVIEW, vol. 107, 2004, pages 79 - 83 | "Development of our flexible printed circuit business", SEI TECHNICAL REVIEW, no. 172, January 2008 (2008-01-01), pages 1 - 9 |