blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3764407

EP3764407 - ELECTROMAGNETIC WAVE DETECTOR AND ELECTROMAGNETIC WAVE DETECTOR ARRAY EQUIPED WITH SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.12.2022
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  14.01.2022
FormerGrant of patent is intended
Status updated on  31.08.2021
FormerRequest for examination was made
Status updated on  11.12.2020
FormerThe international publication has been made
Status updated on  14.09.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Mitsubishi Electric Corporation
7-3, Marunouchi 2-chome
Chiyoda-ku
Tokyo 100-8310 / JP
[2021/02]
Inventor(s)01 / OGAWA, Shimpei
c/o Mitsubishi Electric Corporation, 7-3,
Marunouchi 2-chome, Chiyoda-ku
Tokyo 100-8310 / JP
02 / SHIMATANI, Masaaki
c/o Mitsubishi Electric Corporation, 7-3,
Marunouchi 2-chome, Chiyoda-ku
Tokyo 100-8310 / JP
03 / FUKUSHIMA, Shoichiro
c/o Mitsubishi Electric Corporation, 7-3,
Marunouchi 2-chome, Chiyoda-ku
Tokyo 100-8310 / JP
 [2021/02]
Representative(s)Trinks, Ole, et al
Meissner Bolte Patentanwälte
Rechtsanwälte Partnerschaft mbB
Widenmayerstraße 47
80538 München / DE
[2021/02]
Application number, filing date18908816.428.08.2018
[2021/02]
WO2018JP31723
Priority number, dateJP2018003957406.03.2018         Original published format: JP 2018039574
[2021/02]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019171622
Date:12.09.2019
Language:JA
[2019/37]
Type: A1 Application with search report 
No.:EP3764407
Date:13.01.2021
Language:EN
[2021/02]
Type: B1 Patent specification 
No.:EP3764407
Date:16.02.2022
Language:EN
[2022/07]
Search report(s)International search report - published on:JP12.09.2019
(Supplementary) European search report - dispatched on:EP04.11.2020
ClassificationIPC:H01L31/112, G01J1/02
[2021/02]
CPC:
H01L31/112 (EP); H01L31/113 (US); G01J1/02 (EP);
H01L31/022408 (US); H01L31/028 (EP); H01L31/0288 (EP,US);
H01L31/035209 (EP); H01L31/1105 (EP); Y02E10/547 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/02]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:DETEKTOR ELEKTROMAGNETISCHER WELLEN UND DAMIT AUSGESTATTETE DETEKTORANORDNUNG ELEKTROMAGNETISCHER WELLEN[2021/02]
English:ELECTROMAGNETIC WAVE DETECTOR AND ELECTROMAGNETIC WAVE DETECTOR ARRAY EQUIPED WITH SAME[2021/02]
French:DÉTECTEUR D'ONDES ÉLECTROMAGNÉTIQUES ET RÉSEAU DE DÉTECTEURS D'ONDES ÉLECTROMAGNÉTIQUES[2021/02]
Entry into regional phase28.08.2020Translation filed 
28.08.2020National basic fee paid 
28.08.2020Search fee paid 
28.08.2020Designation fee(s) paid 
28.08.2020Examination fee paid 
Examination procedure28.08.2020Examination requested  [2021/02]
31.05.2021Amendment by applicant (claims and/or description)
01.09.2021Communication of intention to grant the patent
10.01.2022Fee for grant paid
10.01.2022Fee for publishing/printing paid
10.01.2022Receipt of the translation of the claim(s)
Opposition(s)17.11.2022No opposition filed within time limit [2023/04]
Fees paidRenewal fee
18.09.2020Renewal fee patent year 03
13.08.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.08.2018
AL16.02.2022
AT16.02.2022
CY16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
IT16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
MK16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
TR16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
GB28.08.2022
IE28.08.2022
LU28.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
[2024/29]
Former [2024/27]HU28.08.2018
AL16.02.2022
AT16.02.2022
CY16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
IT16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
MK16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
GB28.08.2022
IE28.08.2022
LU28.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
Former [2024/25]HU28.08.2018
AL16.02.2022
AT16.02.2022
CY16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
IT16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
GB28.08.2022
IE28.08.2022
LU28.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
Former [2024/21]AL16.02.2022
AT16.02.2022
CY16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
IT16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
GB28.08.2022
IE28.08.2022
LU28.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
Former [2023/47]AL16.02.2022
AT16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
IT16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
GB28.08.2022
IE28.08.2022
LU28.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
Former [2023/42]AL16.02.2022
AT16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
IT16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
IE28.08.2022
LU28.08.2022
BE31.08.2022
CH31.08.2022
LI31.08.2022
Former [2023/35]AL16.02.2022
AT16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
IT16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
IE28.08.2022
LU28.08.2022
CH31.08.2022
LI31.08.2022
Former [2023/33]AL16.02.2022
AT16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
IE28.08.2022
LU28.08.2022
CH31.08.2022
LI31.08.2022
Former [2023/21]AL16.02.2022
AT16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
LU28.08.2022
CH31.08.2022
LI31.08.2022
Former [2023/16]AL16.02.2022
AT16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
MC16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2023/10]AL16.02.2022
AT16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SI16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2023/01]AL16.02.2022
AT16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2022/49]AT16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SK16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2022/48]AT16.02.2022
CZ16.02.2022
DK16.02.2022
EE16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2022/47]AT16.02.2022
DK16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RO16.02.2022
RS16.02.2022
SE16.02.2022
SM16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2022/46]AT16.02.2022
DK16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RS16.02.2022
SE16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2022/42]AT16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RS16.02.2022
SE16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
IS17.06.2022
Former [2022/39]AT16.02.2022
ES16.02.2022
FI16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RS16.02.2022
SE16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
Former [2022/36]AT16.02.2022
ES16.02.2022
HR16.02.2022
LT16.02.2022
LV16.02.2022
NL16.02.2022
PL16.02.2022
RS16.02.2022
SE16.02.2022
BG16.05.2022
NO16.05.2022
GR17.05.2022
PT16.06.2022
Former [2022/35]ES16.02.2022
HR16.02.2022
LT16.02.2022
NL16.02.2022
RS16.02.2022
SE16.02.2022
BG16.05.2022
NO16.05.2022
PT16.06.2022
Former [2022/34]ES16.02.2022
LT16.02.2022
NL16.02.2022
NO16.05.2022
PT16.06.2022
Former [2022/33]LT16.02.2022
NO16.05.2022
Documents cited:Search[X]US2014264275  (ZHONG ZHAOHUI [US], et al) [X] 1,13,14 * abstract * * paragraph [0004] - paragraph [0009] * * paragraph [0030] - paragraph [0040] *;
 [Y]WO2018012076  (MITSUBISHI ELECTRIC CORP [JP]) [Y] 3-12,15* abstract *;
 [XY]  - ZHANG DEHUI ET AL, "Electrically tunable photoresponse in a graphene heterostructure photodetector", 2017 CONFERENCE ON LASERS AND ELECTRO-OPTICS (CLEO), THE OPTICAL SOCIETY, (20170514), doi:10.1364/CLEO_SI.2017.SF2I.2, pages 1 - 2, XP033238580 [X] 1,2,13,14 * page 1 - page 2; figure 1 * [Y] 3-12,15

DOI:   http://dx.doi.org/10.1364/CLEO_SI.2017.SF2I.2
 [X]  - CHANG-HUA LIU ET AL, "Graphene photodetectors with ultra-broadband and high responsivity at room temperature", NATURE NANOTECHNOLOGY, London, (20140316), vol. 9, no. 4, doi:10.1038/nnano.2014.31, ISSN 1748-3387, pages 273 - 278, XP055541668 [X] 1,2,13,14 * page 273 - page 274; figures 1,3 *

DOI:   http://dx.doi.org/10.1038/nnano.2014.31
International search[XYA]US2014264275  (ZHONG ZHAOHUI [US], et al);
 [Y]US2015243826  (AN XIAOHONG [US], et al);
 [Y]WO2018012076  (MITSUBISHI ELECTRIC CORP [JP]);
by applicantJP2013502735
 WO2018012076
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.