EP3509364 - METHOD AND DEVICE FOR ADJUSTING TRANSMIT POWER IN WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.10.2021 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 13.11.2020 | ||
Former | Grant of patent is intended Status updated on 24.08.2020 | ||
Former | Request for examination was made Status updated on 08.11.2019 | ||
Former | The application has been published Status updated on 07.06.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do, 16677 / KR | [2019/28] | Inventor(s) | 01 /
KIM, Jongkyung Samsung Electronics Co., Ltd. 129 Samsung-ro, Yeongtong-gu Suwon-si 16677 Gyeonggi-do / KR | 02 /
YI, Byoungha Samsung Electronics Co., Ltd. 129 Samsung-ro, Yeongtong-gu Suwon-si 16677 Gyeonggi-do / KR | 03 /
LEE, Dongheon Samsung Electronics Co., Ltd. 129 Samsung-ro, Yeongtong-gu Suwon-si 16677 Gyeonggi-do / KR | [2019/28] | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [N/P] |
Former [2020/51] | HGF 1 City Walk Leeds LS11 9DX / GB | ||
Former [2019/28] | HGF Limited Saviour House 9 St. Saviourgate York YO1 8NQ / GB | Application number, filing date | 19150893.6 | 09.01.2019 | [2019/28] | Priority number, date | KR20180002798 | 09.01.2018 Original published format: KR 20180002798 | [2019/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3509364 | Date: | 10.07.2019 | Language: | EN | [2019/28] | Type: | B1 Patent specification | No.: | EP3509364 | Date: | 16.12.2020 | Language: | EN | [2020/51] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.05.2019 | Classification | IPC: | H04W52/24, // H04W52/14, H04W52/36 | [2019/28] | CPC: |
H04W52/143 (EP,US);
H04W52/24 (KR);
H04W52/10 (US);
H04W52/241 (EP,US);
H04W52/243 (EP,US);
H04W52/367 (EP,KR,US);
H04W88/08 (KR)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/50] |
Former [2019/28] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND VORRICHTUNG ZUR EINSTELLUNG DER SENDELEISTUNG IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM | [2019/28] | English: | METHOD AND DEVICE FOR ADJUSTING TRANSMIT POWER IN WIRELESS COMMUNICATION SYSTEM | [2019/28] | French: | PROCÉDÉ ET DISPOSITIF POUR LE RÉGLAGE DE LA PUISSANCE DE TRANSMISSION DANS UN SYSTÈME DE COMMUNICATION SANS FIL | [2019/28] | Examination procedure | 06.11.2019 | Amendment by applicant (claims and/or description) | 06.11.2019 | Examination requested [2019/50] | 06.11.2019 | Date on which the examining division has become responsible | 25.08.2020 | Communication of intention to grant the patent | 04.11.2020 | Fee for grant paid | 04.11.2020 | Fee for publishing/printing paid | 04.11.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 17.09.2021 | No opposition filed within time limit [2021/47] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.01.2019 | AL | 16.12.2020 | AT | 16.12.2020 | CY | 16.12.2020 | CZ | 16.12.2020 | DK | 16.12.2020 | EE | 16.12.2020 | ES | 16.12.2020 | FI | 16.12.2020 | HR | 16.12.2020 | IT | 16.12.2020 | LT | 16.12.2020 | LV | 16.12.2020 | MC | 16.12.2020 | MK | 16.12.2020 | MT | 16.12.2020 | PL | 16.12.2020 | RO | 16.12.2020 | RS | 16.12.2020 | SE | 16.12.2020 | SI | 16.12.2020 | SK | 16.12.2020 | SM | 16.12.2020 | IE | 09.01.2021 | LU | 09.01.2021 | BE | 31.01.2021 | FR | 16.02.2021 | BG | 16.03.2021 | NO | 16.03.2021 | GR | 17.03.2021 | IS | 16.04.2021 | PT | 16.04.2021 | [2024/42] |
Former [2024/23] | HU | 09.01.2019 | |
AL | 16.12.2020 | ||
AT | 16.12.2020 | ||
CY | 16.12.2020 | ||
CZ | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
ES | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
IT | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
MK | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
IE | 09.01.2021 | ||
LU | 09.01.2021 | ||
BE | 31.01.2021 | ||
FR | 16.02.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2023/33] | HU | 09.01.2019 | |
AL | 16.12.2020 | ||
AT | 16.12.2020 | ||
CY | 16.12.2020 | ||
CZ | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
ES | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
IT | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
IE | 09.01.2021 | ||
LU | 09.01.2021 | ||
BE | 31.01.2021 | ||
FR | 16.02.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2023/30] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
CY | 16.12.2020 | ||
CZ | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
ES | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
IT | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
IE | 09.01.2021 | ||
LU | 09.01.2021 | ||
BE | 31.01.2021 | ||
FR | 16.02.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2022/34] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
CZ | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
ES | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
IT | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
IE | 09.01.2021 | ||
LU | 09.01.2021 | ||
BE | 31.01.2021 | ||
FR | 16.02.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2022/23] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
CZ | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
ES | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
IT | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
IE | 09.01.2021 | ||
LU | 09.01.2021 | ||
FR | 16.02.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2022/13] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
CZ | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
ES | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
IT | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SI | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
IE | 09.01.2021 | ||
LU | 09.01.2021 | ||
FR | 16.02.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2022/10] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
CZ | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
ES | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
IT | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
IE | 09.01.2021 | ||
LU | 09.01.2021 | ||
FR | 16.02.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2022/08] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
CZ | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
ES | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
IT | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
IE | 09.01.2021 | ||
LU | 09.01.2021 | ||
FR | 16.02.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2022/07] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
CZ | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
IT | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
IE | 09.01.2021 | ||
LU | 09.01.2021 | ||
FR | 16.02.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2021/49] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
CZ | 16.12.2020 | ||
DK | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
IT | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
LU | 09.01.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2021/48] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
CZ | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
IT | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
LU | 09.01.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2021/45] | AL | 16.12.2020 | |
AT | 16.12.2020 | ||
CZ | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
LU | 09.01.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2021/43] | AT | 16.12.2020 | |
CZ | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
LU | 09.01.2021 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2021/42] | AT | 16.12.2020 | |
CZ | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
IS | 16.04.2021 | ||
PT | 16.04.2021 | ||
Former [2021/41] | AT | 16.12.2020 | |
CZ | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
MC | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2021/39] | AT | 16.12.2020 | |
CZ | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
PL | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2021/37] | AT | 16.12.2020 | |
CZ | 16.12.2020 | ||
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2021/36] | CZ | 16.12.2020 | |
EE | 16.12.2020 | ||
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2021/35] | CZ | 16.12.2020 | |
FI | 16.12.2020 | ||
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RO | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SK | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2021/33] | FI | 16.12.2020 | |
HR | 16.12.2020 | ||
LT | 16.12.2020 | ||
LV | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
PT | 16.04.2021 | ||
Former [2021/32] | FI | 16.12.2020 | |
HR | 16.12.2020 | ||
LV | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
SM | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
Former [2021/28] | FI | 16.12.2020 | |
HR | 16.12.2020 | ||
LV | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
Former [2021/24] | FI | 16.12.2020 | |
LV | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
BG | 16.03.2021 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
Former [2021/23] | FI | 16.12.2020 | |
LV | 16.12.2020 | ||
RS | 16.12.2020 | ||
SE | 16.12.2020 | ||
NO | 16.03.2021 | ||
GR | 17.03.2021 | ||
Former [2021/22] | FI | 16.12.2020 | |
RS | 16.12.2020 | ||
NO | 16.03.2021 | ||
Former [2021/20] | FI | 16.12.2020 | Documents cited: | Search | [I]US2015094114 (RAO PRASHANTH [US], et al) [I] 1-15 * paragraph [0015] - paragraph [0020] * * paragraph [0025] - paragraph [0027] * * paragraph [0029] - paragraph [0034] * * paragraph [0039] - paragraph [0042] * * paragraph [0074] - paragraph [0083] * * paragraph [0084] - paragraph [0115] *; | [A]EP2991413 (ALCATEL LUCENT [FR]) [A] 1-15 * paragraph [0027] - paragraph [0039]; figure 2 *; | [A]US2016242129 (TACHIKAWA HITOYA [JP]) [A] 1-15 * paragraph [0080] - paragraph [0097]; figure 10 * * paragraph [0106] - paragraph [0107] *; | [A]EP3169115 (YULONG COMPUTER TELECOMMUNICATION SCIENT (SHENZHEN) CO LTD [CN]) [A] 1-15 * paragraph [0031] - paragraph [0035]; figure 1 * * paragraph [0047] - paragraph [0050] ** paragraph [0060] - paragraph [0069] * |