EP3512256 - DEVICE AND METHOD OF PERFORMING AN ACCESS CONTROL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.09.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 08.10.2021 | ||
Former | Grant of patent is intended Status updated on 17.06.2021 | ||
Former | Examination is in progress Status updated on 14.04.2020 | ||
Former | Request for examination was made Status updated on 06.12.2019 | ||
Former | The application has been published Status updated on 14.06.2019 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Acer Incorporated 8F, 88, Sec. 1, Hsin Tai Wu Road Xizhi District New Taipei City 221 / TW | [2019/29] | Inventor(s) | 01 /
Cheng, Ching-Wen 8F, 88, Sec. 1, Hsin Tai Wu Rd., Xizhi Dist. 221 New Taipei City / TW | [2019/29] | Representative(s) | Straus, Alexander, et al 2K Patent- und Rechtsanwälte Bajuwarenring 14 82041 Oberhaching / DE | [N/P] |
Former [2021/45] | Straus, Alexander, et al 2K Patent- und Rechtsanwälte - München Keltenring 9 82041 Oberhaching / DE | ||
Former [2019/29] | Becker Kurig Straus Patentanwälte Bavariastrasse 7 80336 München / DE | Application number, filing date | 19151366.2 | 11.01.2019 | [2019/29] | Priority number, date | US201862616433P | 12.01.2018 Original published format: US 201862616433 P | US201916244126 | 10.01.2019 Original published format: US201916244126 | [2019/29] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3512256 | Date: | 17.07.2019 | Language: | EN | [2019/29] | Type: | B1 Patent specification | No.: | EP3512256 | Date: | 10.11.2021 | Language: | EN | [2021/45] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.04.2019 | Classification | IPC: | H04W48/02, H04W48/16 | [2021/24] | CPC: |
H04W48/02 (EP,US);
H04W48/06 (CN,US);
H04W28/0289 (CN);
H04W48/16 (EP,US);
H04W84/042 (US)
|
Former IPC [2019/29] | H04W48/02, H04W48/16, // H04W76/27, H04W76/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/02] |
Former [2019/29] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUR DURCHFÜHRUNG EINER ZUGANGSKONTROLLE | [2019/29] | English: | DEVICE AND METHOD OF PERFORMING AN ACCESS CONTROL | [2019/29] | French: | DISPOSITIF ET PROCÉDÉ PERMETTANT D'EFFECTUER UN CONTRÔLE D'ACCÈS | [2019/29] | Examination procedure | 03.12.2019 | Amendment by applicant (claims and/or description) | 03.12.2019 | Examination requested [2020/02] | 03.12.2019 | Date on which the examining division has become responsible | 17.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 10.08.2020 | Reply to a communication from the examining division | 16.12.2020 | Despatch of a communication from the examining division (Time limit: M04) | 12.04.2021 | Reply to a communication from the examining division | 18.06.2021 | Communication of intention to grant the patent | 04.10.2021 | Fee for grant paid | 04.10.2021 | Fee for publishing/printing paid | 04.10.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 11.08.2022 | No opposition filed within time limit [2022/42] | Fees paid | Renewal fee | 27.01.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.01.2019 | AL | 10.11.2021 | AT | 10.11.2021 | CY | 10.11.2021 | CZ | 10.11.2021 | DK | 10.11.2021 | EE | 10.11.2021 | ES | 10.11.2021 | FI | 10.11.2021 | HR | 10.11.2021 | LT | 10.11.2021 | LV | 10.11.2021 | MC | 10.11.2021 | MK | 10.11.2021 | MT | 10.11.2021 | PL | 10.11.2021 | RO | 10.11.2021 | RS | 10.11.2021 | SE | 10.11.2021 | SI | 10.11.2021 | SK | 10.11.2021 | SM | 10.11.2021 | TR | 10.11.2021 | IE | 11.01.2022 | LU | 11.01.2022 | BE | 31.01.2022 | CH | 31.01.2022 | LI | 31.01.2022 | BG | 10.02.2022 | NO | 10.02.2022 | GR | 11.02.2022 | IS | 10.03.2022 | PT | 10.03.2022 | [2024/44] |
Former [2024/29] | HU | 11.01.2019 | |
AL | 10.11.2021 | ||
AT | 10.11.2021 | ||
CY | 10.11.2021 | ||
CZ | 10.11.2021 | ||
DK | 10.11.2021 | ||
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
MC | 10.11.2021 | ||
MK | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SI | 10.11.2021 | ||
SK | 10.11.2021 | ||
SM | 10.11.2021 | ||
TR | 10.11.2021 | ||
IE | 11.01.2022 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2024/25] | HU | 11.01.2019 | |
AL | 10.11.2021 | ||
AT | 10.11.2021 | ||
CY | 10.11.2021 | ||
CZ | 10.11.2021 | ||
DK | 10.11.2021 | ||
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
MC | 10.11.2021 | ||
MK | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SI | 10.11.2021 | ||
SK | 10.11.2021 | ||
SM | 10.11.2021 | ||
IE | 11.01.2022 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2024/23] | AL | 10.11.2021 | |
AT | 10.11.2021 | ||
CY | 10.11.2021 | ||
CZ | 10.11.2021 | ||
DK | 10.11.2021 | ||
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
MC | 10.11.2021 | ||
MK | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SI | 10.11.2021 | ||
SK | 10.11.2021 | ||
SM | 10.11.2021 | ||
IE | 11.01.2022 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2024/20] | AL | 10.11.2021 | |
AT | 10.11.2021 | ||
CY | 10.11.2021 | ||
CZ | 10.11.2021 | ||
DK | 10.11.2021 | ||
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
MC | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SI | 10.11.2021 | ||
SK | 10.11.2021 | ||
SM | 10.11.2021 | ||
IE | 11.01.2022 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2023/09] | AL | 10.11.2021 | |
AT | 10.11.2021 | ||
CZ | 10.11.2021 | ||
DK | 10.11.2021 | ||
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
MC | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SI | 10.11.2021 | ||
SK | 10.11.2021 | ||
SM | 10.11.2021 | ||
IE | 11.01.2022 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2023/03] | AL | 10.11.2021 | |
AT | 10.11.2021 | ||
CZ | 10.11.2021 | ||
DK | 10.11.2021 | ||
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
MC | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SI | 10.11.2021 | ||
SK | 10.11.2021 | ||
SM | 10.11.2021 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2023/01] | AL | 10.11.2021 | |
AT | 10.11.2021 | ||
CZ | 10.11.2021 | ||
DK | 10.11.2021 | ||
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
MC | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SI | 10.11.2021 | ||
SK | 10.11.2021 | ||
SM | 10.11.2021 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2022/49] | AL | 10.11.2021 | |
AT | 10.11.2021 | ||
CZ | 10.11.2021 | ||
DK | 10.11.2021 | ||
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
MC | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SK | 10.11.2021 | ||
SM | 10.11.2021 | ||
LU | 11.01.2022 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2022/46] | AT | 10.11.2021 | |
CZ | 10.11.2021 | ||
DK | 10.11.2021 | ||
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
MC | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SK | 10.11.2021 | ||
SM | 10.11.2021 | ||
LU | 11.01.2022 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2022/39] | AT | 10.11.2021 | |
CZ | 10.11.2021 | ||
DK | 10.11.2021 | ||
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
MC | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SK | 10.11.2021 | ||
SM | 10.11.2021 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2022/35] | AT | 10.11.2021 | |
CZ | 10.11.2021 | ||
DK | 10.11.2021 | ||
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SK | 10.11.2021 | ||
SM | 10.11.2021 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2022/34] | AT | 10.11.2021 | |
EE | 10.11.2021 | ||
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
PL | 10.11.2021 | ||
RO | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SM | 10.11.2021 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2022/33] | AT | 10.11.2021 | |
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
PL | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
SM | 10.11.2021 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2022/25] | AT | 10.11.2021 | |
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
PL | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
BG | 10.02.2022 | ||
NO | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2022/24] | AT | 10.11.2021 | |
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
PL | 10.11.2021 | ||
RS | 10.11.2021 | ||
SE | 10.11.2021 | ||
BG | 10.02.2022 | ||
GR | 11.02.2022 | ||
IS | 10.03.2022 | ||
PT | 10.03.2022 | ||
Former [2022/23] | AT | 10.11.2021 | |
ES | 10.11.2021 | ||
FI | 10.11.2021 | ||
HR | 10.11.2021 | ||
LT | 10.11.2021 | ||
LV | 10.11.2021 | ||
PL | 10.11.2021 | ||
RS | 10.11.2021 | ||
BG | 10.02.2022 | ||
PT | 10.03.2022 | ||
Former [2022/22] | AT | 10.11.2021 | |
FI | 10.11.2021 | ||
LT | 10.11.2021 | ||
RS | 10.11.2021 | ||
BG | 10.02.2022 | ||
Former [2022/21] | AT | 10.11.2021 | |
RS | 10.11.2021 | ||
BG | 10.02.2022 | ||
Former [2022/19] | BG | 10.02.2022 | Documents cited: | Search | [X]WO2016006948 (LG ELECTRONICS INC [KR]) [X] 1-15 * paragraphs [0129] - [0157] *; | [A]WO2016118282 (INTEL IP CORP [US]) [A] 1-15* paragraphs [0024] - [0069] - [0106] - [0138] *; | [X] - LG ELECTRONICS INC, "Access category based access barring for RRC_IDLE and RRC_INACTIVE", vol. RAN WG2, no. Reno, USA; 20171127 - 20171201, (20171117), 3GPP DRAFT; R2-1713694 CATEGORY BASED ACCESS BARRING IN IDLE AND INACTIVE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5F100/Docs/, (20171117), XP051372357 [X] 1-15 * pages 1-2 * | [X] - INTEL CORPORATION, "RAN implications of 5G Access Control requirements", vol. RAN WG2, no. Prague, Czech Republic; 20171009 - 20171013, (20171008), 3GPP DRAFT; R2-1710602_5G_AC_RAN_REQUIREMENT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20171008), XP051342638 [X] 1-15 * pages 1,6,7 * | [X] - ERICSSON, "Access Control for NR", vol. RAN WG2, no. Athens, Greece; 20170213 - 20170217, (20170204), 3GPP DRAFT; R2-1700911 ACCESS CONTROL FOR NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_97/Docs/, (20170204), XP051223298 [X] 1-15 * the whole document * | Examination | - ZTE ET AL, "Consideration on access control in NR", vol. RAN WG2, no. Vancouver, Canada; 20180122 - 20180126, (20180111), 3GPP DRAFT; R2-1800458 CONSIDERATION ON ACCESS CONTROL IN NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5FAHs/2018%5F01%5FNR/Docs/, (20180111), XP051385738 | - ERICSSON, "Signaling of Access Control Parameters", vol. RAN WG2, no. Vancouver, Canada; 20180122 - 20180126, (20180111), 3GPP DRAFT; R2-1800320 - SIGNALING OF ACCESS CONTROL PARAMETERS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5FAHs/2018%5F01%5FNR/Docs/, (20180111), XP051385655 |