EP3508279 - AIR CAP ARRANGEMENT AND SPRAY GUN [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.05.2022 Database last updated on 31.12.2024 | |
Former | The patent has been granted Status updated on 18.06.2021 | ||
Former | Grant of patent is intended Status updated on 24.02.2021 | ||
Former | Examination is in progress Status updated on 25.05.2020 | ||
Former | Request for examination was made Status updated on 17.01.2020 | ||
Former | The application has been published Status updated on 07.06.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states SATA GmbH & Co. KG Domertalstrasse 20 70806 Kornwestheim / DE | [2019/28] | Inventor(s) | 01 /
Gehrung, Ralf Pleidelsheimerstr. 1 71522 Backnang / DE | [2019/28] | Application number, filing date | 19152297.8 | 18.08.2017 | [2019/28] | Priority number, date | CN201620911120U | 19.08.2016 Original published format: CN 201620911120 U | [2019/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3508279 | Date: | 10.07.2019 | Language: | EN | [2019/28] | Type: | B1 Patent specification | No.: | EP3508279 | Date: | 21.07.2021 | Language: | EN | [2021/29] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.05.2019 | Classification | IPC: | B05B7/08, B05B1/30, // B05B7/12, B05B7/06, B05B7/24 | [2021/10] | CPC: |
B05B1/3046 (EP,US);
B05B7/083 (US);
B05B15/65 (US);
B05B7/0815 (EP,US);
B05B7/066 (EP);
B05B7/068 (US);
|
Former IPC [2019/28] | B05B7/08, B05B1/30, F16L37/088, // B05B7/12, B05B7/06, B05B7/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/08] |
Former [2019/28] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | LUFTKAPPENANORDNUNG UND SPRÜHPISTOLE | [2019/28] | English: | AIR CAP ARRANGEMENT AND SPRAY GUN | [2019/28] | French: | CHAPEAU DE PROJECTION D'AIR ET PISTOLET DE PULVÉRISATION | [2019/28] | Examination procedure | 25.11.2019 | Amendment by applicant (claims and/or description) | 10.01.2020 | Examination requested [2020/08] | 10.01.2020 | Date on which the examining division has become responsible | 28.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 16.09.2020 | Reply to a communication from the examining division | 25.02.2021 | Communication of intention to grant the patent | 08.06.2021 | Fee for grant paid | 08.06.2021 | Fee for publishing/printing paid | 08.06.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP17186905.0 / EP3284544 | Opposition(s) | 22.04.2022 | No opposition filed within time limit [2022/26] | Fees paid | Renewal fee | 02.09.2019 | Renewal fee patent year 03 | 31.08.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.08.2017 | AL | 21.07.2021 | AT | 21.07.2021 | CY | 21.07.2021 | CZ | 21.07.2021 | DK | 21.07.2021 | EE | 21.07.2021 | ES | 21.07.2021 | FI | 21.07.2021 | HR | 21.07.2021 | LT | 21.07.2021 | LV | 21.07.2021 | MC | 21.07.2021 | MK | 21.07.2021 | MT | 21.07.2021 | NL | 21.07.2021 | PL | 21.07.2021 | RO | 21.07.2021 | RS | 21.07.2021 | SE | 21.07.2021 | SI | 21.07.2021 | SK | 21.07.2021 | SM | 21.07.2021 | IE | 18.08.2021 | LU | 18.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | LI | 31.08.2021 | BG | 21.10.2021 | NO | 21.10.2021 | GR | 22.10.2021 | IS | 21.11.2021 | PT | 22.11.2021 | [2024/42] |
Former [2024/23] | HU | 18.08.2017 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
MK | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
IE | 18.08.2021 | ||
LU | 18.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2023/33] | HU | 18.08.2017 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
IE | 18.08.2021 | ||
LU | 18.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2023/30] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
IE | 18.08.2021 | ||
LU | 18.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/35] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
IE | 18.08.2021 | ||
LU | 18.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/34] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
LU | 18.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/29] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
LU | 18.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/25] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
LU | 18.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/24] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
LU | 18.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/21] | AT | 21.07.2021 | |
DK | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/11] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/09] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
PT | 22.11.2021 | ||
Former [2022/08] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
Former [2022/07] | AT | 21.07.2021 | |
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
NO | 21.10.2021 | Documents cited: | Search | [XAI]US2004303 (FRITZ WAHLIN) [X] 1,3,4,6,8,11-13 * page 2, line 41 - line 46; figures 2, 3 * [A] 2,5,9 [I] 10; | [XI]GB657854 (BYLOCK ELECTRIC LTD, et al) [X] 1,3,4,6,8,11,12 * page 3, line 92 - line 95; figure 1 * [I] 10; | [XI]US2743963 (PEEPS DONALD J) [X] 1,3,4,6,8,11-13 * column 2, line 43 - line 47; figures 1, 2 * [I] 10; | [X]JPH02258076 (IWATA AIR COMPRESSOR MFG) [X] 1,3,4,6-8,10,12,13 * figure 2 *; | [X]JP2008018296 (MEIJI AIR COMPRESSOR MFG, et al) [X] 1* paragraphs [0026] , [0 29]; figure 2 * |