EP3531601 - SYSTEM, METHOD AND APPARATUS FOR QOS RETRANSMISSION FOR MG.FAST [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.05.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 18.06.2021 | ||
Former | Grant of patent is intended Status updated on 03.02.2021 | ||
Former | Request for examination was made Status updated on 06.03.2020 | ||
Former | The application has been published Status updated on 26.07.2019 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states MaxLinear Asia Singapore Private Limited 151 Lorong Chuan, 02-01A, New Tech Park Lobby A Singapore / SG | [2021/28] |
Former [2019/35] | For all designated states INTEL Corporation 2200 Mission College Blvd. Santa Clara, CA 95054 / US | Inventor(s) | 01 /
SCHOPPMEIER, Dietmar Malvenweg 18 82008 Unterhaching / DE | 02 /
OKSMAN, Vladimir 67 Culford Place Morganville, NJ New Jersey 07751 / US | [2019/35] | Representative(s) | 2SPL Patentanwälte PartG mbB Landaubogen 3 81373 München / DE | [N/P] |
Former [2019/35] | 2SPL Patentanwälte PartG mbB Postfach 15 17 23 80050 München / DE | Application number, filing date | 19153628.3 | 24.01.2019 | [2019/35] | Priority number, date | US201862636021P | 27.02.2018 Original published format: US 201862636021 P | US201862636565P | 28.02.2018 Original published format: US 201862636565 P | US201816050751 | 31.07.2018 Original published format: US201816050751 | [2019/35] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3531601 | Date: | 28.08.2019 | Language: | EN | [2019/35] | Type: | B1 Patent specification | No.: | EP3531601 | Date: | 21.07.2021 | Language: | EN | [2021/29] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.07.2019 | Classification | IPC: | H04L1/18 | [2019/35] | CPC: |
H04L1/1887 (EP,US);
H04L1/0078 (US);
H04L1/0018 (US);
H04L1/009 (EP,US);
H04L1/1809 (US);
H04L1/1838 (EP,US);
H04L1/1841 (EP,US);
H04L1/1896 (EP,US);
H04L47/24 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/15] |
Former [2019/35] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEM, VERFAHREN UND VORRICHTUNG ZUR QOS-NEUÜBERTRAGUNG FÜR MG.FAST | [2019/35] | English: | SYSTEM, METHOD AND APPARATUS FOR QOS RETRANSMISSION FOR MG.FAST | [2019/35] | French: | SYSTÈME, PROCÉDÉ ET APPAREIL DE RETRANSMISSION QOS POUR MG.FAST | [2019/35] | Examination procedure | 14.01.2020 | Amendment by applicant (claims and/or description) | 28.02.2020 | Examination requested [2020/15] | 28.02.2020 | Date on which the examining division has become responsible | 04.02.2021 | Communication of intention to grant the patent | 08.06.2021 | Fee for grant paid | 08.06.2021 | Fee for publishing/printing paid | 08.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 22.04.2022 | No opposition filed within time limit [2022/26] | Fees paid | Renewal fee | 01.02.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.01.2019 | AL | 21.07.2021 | AT | 21.07.2021 | CY | 21.07.2021 | CZ | 21.07.2021 | DK | 21.07.2021 | EE | 21.07.2021 | ES | 21.07.2021 | FI | 21.07.2021 | HR | 21.07.2021 | IT | 21.07.2021 | LT | 21.07.2021 | LV | 21.07.2021 | MC | 21.07.2021 | MK | 21.07.2021 | MT | 21.07.2021 | NL | 21.07.2021 | PL | 21.07.2021 | RO | 21.07.2021 | RS | 21.07.2021 | SE | 21.07.2021 | SI | 21.07.2021 | SK | 21.07.2021 | SM | 21.07.2021 | BG | 21.10.2021 | NO | 21.10.2021 | GR | 22.10.2021 | IS | 21.11.2021 | PT | 22.11.2021 | IE | 24.01.2022 | LU | 24.01.2022 | BE | 31.01.2022 | CH | 31.01.2022 | FR | 31.01.2022 | LI | 31.01.2022 | [2024/44] |
Former [2024/25] | HU | 24.01.2019 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
MK | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 24.01.2022 | ||
LU | 24.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2024/23] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
MK | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 24.01.2022 | ||
LU | 24.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2024/20] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 24.01.2022 | ||
LU | 24.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/09] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 24.01.2022 | ||
LU | 24.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/03] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
LU | 24.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/01] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
LU | 24.01.2022 | ||
BE | 31.01.2022 | ||
FR | 31.01.2022 | ||
Former [2022/50] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
LU | 24.01.2022 | ||
FR | 31.01.2022 | ||
Former [2022/46] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
LU | 24.01.2022 | ||
Former [2022/39] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/36] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/29] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/25] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/24] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/21] | AT | 21.07.2021 | |
DK | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/11] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/09] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
PT | 22.11.2021 | ||
Former [2022/08] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
Former [2022/07] | AT | 21.07.2021 | |
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
NO | 21.10.2021 | Documents cited: | Search | [X]US2005281278 (BLACK PETER J [US], et al) [X] 1-4,6,9-13 * paragraph [0043] - paragraph [0076] * * paragraph [0117] - paragraph [0161] * * paragraph [0169] - paragraph [0211] *; | [XA]WO2007022441 (QUALCOMM INC [US], et al) [X] 1 * paragraph [0006] - paragraph [0019] * * paragraph [0028] - paragraph [0057] * [A] 12; | [XA]US2008259833 (OZTURK OZCAN [US], et al) [X] 12 * paragraph [0050] - paragraph [0051] * * paragraph [0075] - paragraph [0079] * * paragraph [0093] *[A] 1; | [XI]US2012182999 (PANNELL DONALD [US]) [X] 1-4,6,9-13 * paragraph [0003] * * paragraph [0027] - paragraph [0032] * * paragraph [0037] - paragraph [0041] * [I] 5,7,8,14,15; | [XA]EP2942891 (ALCATEL LUCENT [FR]) [X] 1 * paragraph [0007] - paragraph [0019] * * paragraph [0028] - paragraph [0032] * * paragraph [0038] - paragraph [0051] * [A] 12 |