EP3524545 - CONVEYANCE FACILITY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.09.2024 Database last updated on 04.11.2024 | |
Former | The patent has been granted Status updated on 06.10.2023 | ||
Former | Grant of patent is intended Status updated on 02.07.2023 | ||
Former | Examination is in progress Status updated on 05.05.2022 | ||
Former | Request for examination was made Status updated on 21.02.2020 | ||
Former | The application has been published Status updated on 12.07.2019 | Most recent event Tooltip | 01.11.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states DAIFUKU CO., LTD. 2-11, Mitejima 3-chome Nishi-Yodogawa-ku Osaka-shi Osaka 555-0012 / JP | [2023/45] |
Former [2019/33] | For all designated states DAIFUKU CO., LTD. 2-11, Mitejima 3-chome Nishi-Yodogawa-ku Osaka-shi Osaka 555-0012 / JP | Inventor(s) | 01 /
IWATA, Masashige c/o DAIFUKU CO., LTD. Shiga Works, 1225, Nakazaiji, Hino-cho, Gamo-gun Shiga, 529-1692 / JP | [2019/33] | Representative(s) | van Breda, Jacobus Octrooibureau Los & Stigter B.V. P.O. Box 20052 1000 HB Amsterdam / NL | [2023/45] |
Former [2019/33] | Van Breda, Jacobus Octrooibureau Los & Stigter B.V. Weteringschans 96 1017 XS Amsterdam / NL | Application number, filing date | 19155860.0 | 07.02.2019 | [2019/33] | Priority number, date | JP20180021488 | 09.02.2018 Original published format: JP 2018021488 | [2019/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3524545 | Date: | 14.08.2019 | Language: | EN | [2019/33] | Type: | B1 Patent specification | No.: | EP3524545 | Date: | 08.11.2023 | Language: | EN | [2023/45] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.07.2019 | Classification | IPC: | B65G19/02, B65G9/00 | [2019/33] | CPC: |
B65G9/008 (EP,US);
B61B10/025 (US);
B65G19/025 (EP,US);
B65G35/06 (CN);
B65G2201/02 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/13] |
Former [2019/33] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | FÖRDERANLAGE | [2019/33] | English: | CONVEYANCE FACILITY | [2019/33] | French: | INSTALLATION DE TRANSPORT | [2019/33] | Examination procedure | 24.12.2019 | Amendment by applicant (claims and/or description) | 14.02.2020 | Examination requested [2020/13] | 14.02.2020 | Date on which the examining division has become responsible | 04.05.2022 | Despatch of a communication from the examining division (Time limit: M04) | 25.08.2022 | Reply to a communication from the examining division | 03.07.2023 | Communication of intention to grant the patent | 28.09.2023 | Fee for grant paid | 28.09.2023 | Fee for publishing/printing paid | 28.09.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 09.08.2024 | No opposition filed within time limit [2024/42] | Fees paid | Renewal fee | 25.02.2021 | Renewal fee patent year 03 | 25.02.2022 | Renewal fee patent year 04 | 27.02.2023 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 08.11.2023 | CZ | 08.11.2023 | DK | 08.11.2023 | EE | 08.11.2023 | HR | 08.11.2023 | IT | 08.11.2023 | LT | 08.11.2023 | LV | 08.11.2023 | MC | 08.11.2023 | NL | 08.11.2023 | PL | 08.11.2023 | RO | 08.11.2023 | RS | 08.11.2023 | SE | 08.11.2023 | SI | 08.11.2023 | SK | 08.11.2023 | SM | 08.11.2023 | LU | 07.02.2024 | BG | 08.02.2024 | NO | 08.02.2024 | GR | 09.02.2024 | CH | 29.02.2024 | IS | 08.03.2024 | PT | 08.03.2024 | [2024/49] |
Former [2024/48] | AT | 08.11.2023 | |
CZ | 08.11.2023 | ||
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
HR | 08.11.2023 | ||
IT | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
MC | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RO | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SK | 08.11.2023 | ||
SM | 08.11.2023 | ||
LU | 07.02.2024 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
CH | 29.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/47] | AT | 08.11.2023 | |
CZ | 08.11.2023 | ||
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
HR | 08.11.2023 | ||
IT | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
MC | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RO | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SK | 08.11.2023 | ||
SM | 08.11.2023 | ||
LU | 07.02.2024 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/45] | AT | 08.11.2023 | |
CZ | 08.11.2023 | ||
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
HR | 08.11.2023 | ||
IT | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
MC | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RO | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SK | 08.11.2023 | ||
SM | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/36] | AT | 08.11.2023 | |
CZ | 08.11.2023 | ||
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
HR | 08.11.2023 | ||
IT | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RO | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SK | 08.11.2023 | ||
SM | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/35] | AT | 08.11.2023 | |
CZ | 08.11.2023 | ||
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
HR | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RO | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SM | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/34] | AT | 08.11.2023 | |
DK | 08.11.2023 | ||
EE | 08.11.2023 | ||
HR | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SM | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/33] | AT | 08.11.2023 | |
DK | 08.11.2023 | ||
HR | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
SM | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/26] | AT | 08.11.2023 | |
HR | 08.11.2023 | ||
LT | 08.11.2023 | ||
LV | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/25] | AT | 08.11.2023 | |
HR | 08.11.2023 | ||
LT | 08.11.2023 | ||
NL | 08.11.2023 | ||
PL | 08.11.2023 | ||
RS | 08.11.2023 | ||
SE | 08.11.2023 | ||
BG | 08.02.2024 | ||
NO | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/23] | AT | 08.11.2023 | |
LT | 08.11.2023 | ||
NL | 08.11.2023 | ||
BG | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
PT | 08.03.2024 | ||
Former [2024/21] | LT | 08.11.2023 | |
NL | 08.11.2023 | ||
BG | 08.02.2024 | ||
GR | 09.02.2024 | ||
IS | 08.03.2024 | ||
Former [2024/20] | GR | 09.02.2024 | |
IS | 08.03.2024 | Documents cited: | Search | [Y]US5404992 (ROBU JOHANN [DE], et al) [Y] 3 * columns 3-6; figures 1-3 *; | [XY]DE29511555U (RSL LOGISTIK GMBH & CO [DE]) [X] 1,2,4 * switch 17;; figure 2 * [Y] 3; | [XY]DE29709547U (PSB FOERDERANLAGEN [DE]) [X] 1,2 * figures 1-2; claims 1-3 * [Y] 3; | [XY]DE19943141 (WF LOGISTIK GMBH [DE]) [X] 1,2 * elements 80, 82;; figures 2, 3 * [Y] 3; | [XY]DE10012524 (WF LOGISTIK GMBH [DE]) [X] 1,2,4 * element 142 *[Y] 3; | [A]WO03037760 (ALFILL ENGINEERING GMBH & CO K [DE], et al) [A] 1-4 * figures 2-3 *; | [A]US2004107862 (SUH YONG JIN [KR]) [A] 1-4 * element 50 * | Examination | US3908555 | by applicant | EP2117972 |