blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3561968

EP3561968 - ELECTRICAL CONNECTION SYSTEM FOR A VOLTAGE TRANSFORMER [Right-click to bookmark this link]
Former [2019/44]ELECTRICAL CONNECTION SYSTEM FOR VOLTAGE TRANSFORMER
[2020/20]
StatusNo opposition filed within time limit
Status updated on  16.07.2021
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  07.08.2020
FormerGrant of patent is intended
Status updated on  17.05.2020
FormerRequest for examination was made
Status updated on  10.01.2020
FormerThe application has been published
Status updated on  27.09.2019
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Schneider Electric Industries SAS
35 Rue Joseph Monier
92500 Rueil Malmaison / FR
[2019/44]
Inventor(s)01 / PERRONE, Michel
9 bis rue de New York
38000 Grenoble / FR
02 / MEDJADJ, Geoffrey
17 Boulevard du Maréchal Foch
38100 Grenoble / FR
03 / COEHLO, Pascal
493 Route de Chartreuse
38850 Chirens / FR
04 / GASTALDI, Dominique
730 Chemin des Sources
38870 Saint-Pierre de Bressieux / FR
05 / BALME, Hubert
2997 rue du Petit Lac
38950 Saint Martin Le Vinoux / FR
06 / MERLIN, Stéphane
250 Rue Compagnie Stéphane
38420 Le Versoud / FR
07 / SAKER, Abdou
5 rue de Narvik
38000 Grenoble / FR
 [2019/44]
Representative(s)Mouney, Jérôme, et al
Schneider Electric Industries SAS
Service Propriété Industrielle
35 rue Joseph Monier - CS30323
92506 Rueil Malmaison Cedex / FR
[N/P]
Former [2019/44]Dufresne, Thierry, et al
Schneider Electric Industries SAS
Service Propriété Industrielle
35 rue Joseph Monier - CS 30323
92506 Rueil-Malmaison Cedex / FR
Application number, filing date19158464.821.02.2019
[2019/44]
Priority number, dateFR2018005364226.04.2018         Original published format: FR 1853642
[2019/44]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3561968
Date:30.10.2019
Language:FR
[2019/44]
Type: B1 Patent specification 
No.:EP3561968
Date:09.09.2020
Language:FR
[2020/37]
Search report(s)(Supplementary) European search report - dispatched on:EP26.03.2019
ClassificationIPC:H01R25/16, H02B11/26, H01R4/56, H01F27/04, // H02G5/02, H02B13/035
[2020/20]
CPC:
H02B11/26 (EP); H01F27/04 (EP); H01F27/28 (CN);
H01R25/16 (EP); H01R4/305 (CN); H01R4/56 (EP);
H02B13/0356 (EP); H02G5/02 (EP) (-)
Former IPC [2019/44]H01R25/16, H02B11/26, H02B13/035, H01R4/56
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/07]
Former [2019/44]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ELEKTRISCHES ANSCHLUSSSYSTEM FÜR EINEN SPANNUNGSWANDLER[2020/20]
English:ELECTRICAL CONNECTION SYSTEM FOR A VOLTAGE TRANSFORMER[2020/20]
French:SYSTÈME DE RACCORDEMENT ÉLECTRIQUE POUR TRANSFORMATEUR DE TENSION[2019/44]
Former [2019/44]ELEKTRISCHES ANSCHLUSSSYSTEM FÜR SPANNUNGSTRANSFORMATOR
Former [2019/44]ELECTRICAL CONNECTION SYSTEM FOR VOLTAGE TRANSFORMER
Examination procedure06.01.2020Amendment by applicant (claims and/or description)
06.01.2020Examination requested  [2020/07]
06.01.2020Date on which the examining division has become responsible
18.05.2020Communication of intention to grant the patent
24.06.2020Fee for grant paid
24.06.2020Fee for publishing/printing paid
24.06.2020Receipt of the translation of the claim(s)
Opposition(s)10.06.2021No opposition filed within time limit [2021/33]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.02.2019
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
MT09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE21.02.2021
LU21.02.2021
BE28.02.2021
[2024/42]
Former [2024/23]HU21.02.2019
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE21.02.2021
LU21.02.2021
BE28.02.2021
Former [2023/41]HU21.02.2019
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE21.02.2021
LU21.02.2021
BE28.02.2021
Former [2023/33]HU21.02.2019
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE21.02.2021
LU21.02.2021
BE28.02.2021
Former [2023/30]AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE21.02.2021
LU21.02.2021
BE28.02.2021
Former [2023/29]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE21.02.2021
LU21.02.2021
BE28.02.2021
Former [2022/34]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE21.02.2021
LU21.02.2021
BE28.02.2021
Former [2022/07]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE21.02.2021
LU21.02.2021
Former [2021/47]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
LU21.02.2021
Former [2021/41]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/37]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/28]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/25]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/23]AT09.09.2020
CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/22]CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/21]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/10]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/09]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/08]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
Former [2021/07]FI09.09.2020
LT09.09.2020
NO09.12.2020
Documents cited:Search[A]DE4233986  (SACHSENWERK AG [DE]) [A] 1,6* abstract *;
 [A]DE19540493  (SIEMENS AG [DE]) [A] 1,6 * figure 2; claim 1 *;
 [Y]FR2757688  (MECELEC IND [FR]) [Y] 1-10 * figures 1-3; claims 1,6 *;
 [Y]JP2010272446  (TOYOTA MOTOR CORP) [Y] 1-10 * abstract *;
 [A]CN202872241U  (ABB TECHNOLOGY AG) [A] 1,6 * figure 5; claim 5 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.