EP3702617 - VARIABLE DISPLACEMENT RECIPROCATING PISTON UNIT GENERATING PISTON STROKE SPEED AND PISTON STROKE LENGTH SIGNAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.08.2023 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 02.09.2022 | ||
Former | Grant of patent is intended Status updated on 19.04.2022 | ||
Former | Examination is in progress Status updated on 17.09.2021 | ||
Former | Request for examination was made Status updated on 05.03.2021 | ||
Former | The application has been published Status updated on 31.07.2020 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Hanon Systems 95 (Sinil-dong) Sinilseo-ro Daedeok-gu Daejeon / KR | For all designated states TE Connectivity Germany GmbH Ampèrestraße 12-14 64625 Bensheim / DE | [2020/36] | Inventor(s) | 01 /
ZAWADZKY, Peter Kurt Im Lettengarten 7 67304 Kerzenheim / DE | 02 /
SCHERNER, Simon Ebernburgstr. 1a 67346 Speyer / DE | 03 /
DOMKE, Daniel St. Stephan Platz 1 67227 Frankenthal / DE | 04 /
KWAK, Jung Myung c/o Hanon Systems 95, Sinilseo-ro Daedeok-gu, Daejeon / KR | 05 /
KIM, Yong Hee c/o Hanon Systems 95, Sinilseo-ro Daedeok-gu, Daejeon / KR | [2020/36] | Representative(s) | Meissner Bolte Partnerschaft mbB Patentanwälte Rechtsanwälte Postfach 86 06 24 81633 München / DE | [N/P] |
Former [2020/36] | Parker, Andrew James, et al Meissner Bolte Patentanwälte Rechtsanwälte Partnerschaft mbB Postfach 86 06 24 81633 München / DE | Application number, filing date | 19159899.4 | 28.02.2019 | [2020/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3702617 | Date: | 02.09.2020 | Language: | EN | [2020/36] | Type: | B1 Patent specification | No.: | EP3702617 | Date: | 05.10.2022 | Language: | EN | [2022/40] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 05.09.2019 | Classification | IPC: | F04B27/18, F04B49/06 | [2020/36] | CPC: |
F04B27/1804 (EP,CN);
F04B49/06 (KR);
F04B1/295 (CN);
F04B51/00 (CN,US);
F04B49/065 (EP,CN);
F04B49/12 (KR);
F04B53/14 (US);
F04B2201/0201 (EP,CN,KR);
F04B2201/0206 (EP,CN);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/14] |
Former [2020/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | HUBKOLBENEINHEIT MIT VARIABLER VERDRÄNGUNG ZUR ERZEUGUNG DES KOLBENHUBGESCHWINDIGKEITS- UND KOLBENHUBLÄNGENSIGNALS | [2020/36] | English: | VARIABLE DISPLACEMENT RECIPROCATING PISTON UNIT GENERATING PISTON STROKE SPEED AND PISTON STROKE LENGTH SIGNAL | [2020/36] | French: | UNITÉ DE PISTON ALTERNATIF À CYLINDRÉE VARIABLE PRODUISANT UN SIGNAL DE VITESSE DE COURSE DE PISTON ET DE LONGUEUR DE COURSE DE PISTON | [2020/36] | Examination procedure | 02.03.2021 | Amendment by applicant (claims and/or description) | 02.03.2021 | Examination requested [2021/14] | 02.03.2021 | Date on which the examining division has become responsible | 21.09.2021 | Despatch of a communication from the examining division (Time limit: M04) | 28.01.2022 | Reply to a communication from the examining division | 20.04.2022 | Communication of intention to grant the patent | 25.08.2022 | Fee for grant paid | 25.08.2022 | Fee for publishing/printing paid | 25.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 06.07.2023 | No opposition filed within time limit [2023/37] | Fees paid | Renewal fee | 12.02.2021 | Renewal fee patent year 03 | 14.01.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 05.10.2022 | AT | 05.10.2022 | BG | 05.10.2022 | CZ | 05.10.2022 | DK | 05.10.2022 | EE | 05.10.2022 | ES | 05.10.2022 | FI | 05.10.2022 | HR | 05.10.2022 | IT | 05.10.2022 | LT | 05.10.2022 | LV | 05.10.2022 | MC | 05.10.2022 | NL | 05.10.2022 | PL | 05.10.2022 | RO | 05.10.2022 | RS | 05.10.2022 | SE | 05.10.2022 | SI | 05.10.2022 | SK | 05.10.2022 | SM | 05.10.2022 | NO | 05.01.2023 | GR | 06.01.2023 | IS | 05.02.2023 | PT | 06.02.2023 | BE | 28.02.2023 | CH | 28.02.2023 | GB | 28.02.2023 | IE | 28.02.2023 | LI | 28.02.2023 | LU | 28.02.2023 | [2024/51] |
Former [2024/26] | AL | 05.10.2022 | |
AT | 05.10.2022 | ||
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
IT | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SI | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
BE | 28.02.2023 | ||
CH | 28.02.2023 | ||
GB | 28.02.2023 | ||
IE | 28.02.2023 | ||
LI | 28.02.2023 | ||
LU | 28.02.2023 | ||
Former [2024/12] | AL | 05.10.2022 | |
AT | 05.10.2022 | ||
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SI | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
BE | 28.02.2023 | ||
CH | 28.02.2023 | ||
GB | 28.02.2023 | ||
IE | 28.02.2023 | ||
LI | 28.02.2023 | ||
LU | 28.02.2023 | ||
Former [2024/08] | AL | 05.10.2022 | |
AT | 05.10.2022 | ||
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SI | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
CH | 28.02.2023 | ||
GB | 28.02.2023 | ||
IE | 28.02.2023 | ||
LI | 28.02.2023 | ||
LU | 28.02.2023 | ||
Former [2023/51] | AL | 05.10.2022 | |
AT | 05.10.2022 | ||
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SI | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
LU | 28.02.2023 | ||
Former [2023/49] | AL | 05.10.2022 | |
AT | 05.10.2022 | ||
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
LU | 28.02.2023 | ||
Former [2023/48] | AL | 05.10.2022 | |
AT | 05.10.2022 | ||
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/44] | AL | 05.10.2022 | |
AT | 05.10.2022 | ||
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
MC | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/38] | AL | 05.10.2022 | |
AT | 05.10.2022 | ||
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SK | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/37] | AL | 05.10.2022 | |
AT | 05.10.2022 | ||
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/35] | AT | 05.10.2022 | |
CZ | 05.10.2022 | ||
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RO | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/34] | AT | 05.10.2022 | |
DK | 05.10.2022 | ||
EE | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/33] | AT | 05.10.2022 | |
DK | 05.10.2022 | ||
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
SM | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/25] | AT | 05.10.2022 | |
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
HR | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
PL | 05.10.2022 | ||
RS | 05.10.2022 | ||
SE | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
IS | 05.02.2023 | ||
PT | 06.02.2023 | ||
Former [2023/23] | AT | 05.10.2022 | |
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
LT | 05.10.2022 | ||
LV | 05.10.2022 | ||
NL | 05.10.2022 | ||
SE | 05.10.2022 | ||
NO | 05.01.2023 | ||
GR | 06.01.2023 | ||
PT | 06.02.2023 | ||
Former [2023/22] | AT | 05.10.2022 | |
ES | 05.10.2022 | ||
FI | 05.10.2022 | ||
LT | 05.10.2022 | ||
NL | 05.10.2022 | ||
SE | 05.10.2022 | ||
NO | 05.01.2023 | ||
PT | 06.02.2023 | ||
Former [2023/20] | LT | 05.10.2022 | |
NL | 05.10.2022 | ||
NO | 05.01.2023 | ||
Former [2023/17] | NL | 05.10.2022 | Documents cited: | Search | [IA]JPH0311172 (TOYODA AUTOMATIC LOOM WORKS); | [A]DE4033422 (BOSCH GMBH ROBERT [DE]); | [IA]JP2003148355 (SANDEN CORP); | [AD]US6991435 (OCHIAI YOSHIHIRO [JP]); | [IA]JP2011149287 (SANDEN CORP) | by applicant | US6991435 |