EP3543130 - AIR DRYING SYSTEM AND METHOD THEREFOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.06.2024 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 07.07.2023 | ||
Former | Grant of patent is intended Status updated on 14.05.2023 | ||
Former | Examination is in progress Status updated on 30.10.2020 | ||
Former | Request for examination was made Status updated on 23.08.2019 | Most recent event Tooltip | 02.08.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 04.09.2024 [2024/36] | Applicant(s) | For all designated states The Boeing Company 929 Long Bridge Drive Arlington, VA 22202 / US | [2023/12] |
Former [2019/39] | For all designated states The Boeing Company 100 North Riverside Plaza Chicago, IL 60606-2016 / US | Inventor(s) | 01 /
CONNELL, William John 100 North Riverside Plaza CHICAGO, IL 60606 / US | 02 /
CARNEGIE, Cameron Lindsay 100 North Riverside Plaza CHICAGO, IL 60606 / US | 03 /
RICHARDSON, Marcus Karel 100 North Riverside Plaza CHICAGO, IL 60606 / US | [2019/39] | Representative(s) | Plasseraud IP 104 Rue de Richelieu CS92104 75080 Paris Cedex 02 / FR | [N/P] |
Former [2023/32] | Plasseraud IP 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | ||
Former [2019/39] | Cabinet Plasseraud 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | Application number, filing date | 19160645.8 | 04.03.2019 | [2019/39] | Priority number, date | US201815934233 | 23.03.2018 Original published format: US201815934233 | [2019/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3543130 | Date: | 25.09.2019 | Language: | EN | [2019/39] | Type: | B1 Patent specification | No.: | EP3543130 | Date: | 09.08.2023 | Language: | EN | [2023/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.06.2019 | Classification | IPC: | B64D13/00, B64D13/06 | [2019/39] | CPC: |
B64D13/06 (EP,CN,US);
B01D53/26 (CN);
B64C1/067 (US);
B64D2013/0607 (CN);
B64D2013/0644 (EP,US);
B64D2013/0648 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/18] |
Former [2019/39] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | LUFTTROCKNUNGSANLAGE UND VERFAHREN DAFÜR | [2019/39] | English: | AIR DRYING SYSTEM AND METHOD THEREFOR | [2019/39] | French: | SYSTÈME DE SÉCHAGE D' AIR ET PROCÉDÉ ASSOCIÉ | [2019/39] | Examination procedure | 04.03.2019 | Examination requested [2019/39] | 23.03.2020 | Amendment by applicant (claims and/or description) | 30.10.2020 | Despatch of a communication from the examining division (Time limit: M04) | 26.02.2021 | Reply to a communication from the examining division | 14.09.2021 | Despatch of a communication from the examining division (Time limit: M04) | 28.10.2021 | Reply to a communication from the examining division | 17.03.2022 | Despatch of a communication from the examining division (Time limit: M04) | 21.06.2022 | Reply to a communication from the examining division | 15.05.2023 | Communication of intention to grant the patent | 03.07.2023 | Fee for grant paid | 03.07.2023 | Fee for publishing/printing paid | 03.07.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 13.05.2024 | No opposition filed within time limit [2024/29] | Fees paid | Renewal fee | 29.03.2021 | Renewal fee patent year 03 | 28.03.2022 | Renewal fee patent year 04 | 27.03.2023 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 09.08.2023 | CZ | 09.08.2023 | DK | 09.08.2023 | EE | 09.08.2023 | ES | 09.08.2023 | FI | 09.08.2023 | HR | 09.08.2023 | IT | 09.08.2023 | LT | 09.08.2023 | LV | 09.08.2023 | NL | 09.08.2023 | PL | 09.08.2023 | RO | 09.08.2023 | RS | 09.08.2023 | SE | 09.08.2023 | SI | 09.08.2023 | SK | 09.08.2023 | SM | 09.08.2023 | NO | 09.11.2023 | GR | 10.11.2023 | IS | 09.12.2023 | PT | 11.12.2023 | [2024/36] |
Former [2024/26] | AT | 09.08.2023 | |
CZ | 09.08.2023 | ||
DK | 09.08.2023 | ||
EE | 09.08.2023 | ||
ES | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
IT | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SK | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/23] | AT | 09.08.2023 | |
CZ | 09.08.2023 | ||
DK | 09.08.2023 | ||
EE | 09.08.2023 | ||
ES | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SK | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/22] | AT | 09.08.2023 | |
CZ | 09.08.2023 | ||
DK | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/20] | AT | 09.08.2023 | |
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/10] | AT | 09.08.2023 | |
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/09] | AT | 09.08.2023 | |
FI | 09.08.2023 | ||
LT | 09.08.2023 | ||
NL | 09.08.2023 | ||
SE | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
Former [2024/08] | LT | 09.08.2023 | |
NL | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | Documents cited: | Search | [X]US5461882 (ZYWIAK THOMAS M [US]) [X] 1,3,5,9,12 * column 3, line 4 - column 6, line 2; figure 1 *; | [YA]US2004195447 (CLAEYS HENRY M [US]) [Y] 4,11 * paragraph [0020]; figure 1 * [A] 1-3,10; | [XYI]EP3235730 (HAMILTON SUNDSTRAND CORP [US]) [X] 1,2,5,9,10,12 * paragraphs [0013] , [0026] , [0034] , [0046] - [0056]; figure 5 * [Y] 4,6,11,13 [I] 7,8,14; | [YA]EP3235729 (HAMILTON SUNDSTRAND CORP [US]) [Y] 6,13 * paragraphs [0017] - [0019] - [0026] , [0027] , [0030]; figure 4 *[A] 1-5,9-12 |