| EP3557773 - VIRTUAL DISTRIBUTION POINT ARCHITECTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.07.2023 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 05.08.2022 | ||
| Former | Grant of patent is intended Status updated on 05.04.2022 | ||
| Former | Examination is in progress Status updated on 26.02.2021 | ||
| Former | Request for examination was made Status updated on 29.05.2020 | ||
| Former | The application has been published Status updated on 20.09.2019 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states MaxLinear Asia Singapore Private Limited 151 Lorong Chuan, 02-01A, New Tech Park Lobby A Singapore / SG | [2022/26] |
| Former [2019/43] | For all designated states INTEL Corporation 2200 Mission College Blvd. Santa Clara, CA 95054 / US | Inventor(s) | 01 /
STROBEL, Rainer Orlandostr. 6 80331 München / DE | 02 /
OKSMAN, Vladimir 67 Culford Place Morganville, NJ 07751 / US | [2019/43] | Representative(s) | 2SPL Patentanwälte PartG mbB Landaubogen 3 81373 München / DE | [2022/36] |
| Former [2019/43] | 2SPL Patentanwälte PartG mbB Postfach 15 17 23 80050 München / DE | Application number, filing date | 19162689.4 | 13.03.2019 | [2019/43] | Priority number, date | US201862658278P | 16.04.2018 Original published format: US 201862658278 P | US201916281238 | 21.02.2019 Original published format: US201916281238 | [2019/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP3557773 | Date: | 23.10.2019 | Language: | EN | [2019/43] | Type: | A3 Search report | No.: | EP3557773 | Date: | 27.11.2019 | Language: | EN | [2019/48] | Type: | B1 Patent specification | No.: | EP3557773 | Date: | 07.09.2022 | Language: | EN | [2022/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.10.2019 | Classification | IPC: | H04B3/32 | [2019/43] | CPC: |
H04B3/32 (EP,US);
H04B10/2507 (US);
H04B10/2589 (US);
H04B3/52 (US);
H04B3/487 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/27] |
| Former [2019/43] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ARCHITEKTUR EINES VIRTUELLEN VERTEILUNGSPUNKTES | [2019/43] | English: | VIRTUAL DISTRIBUTION POINT ARCHITECTURE | [2019/43] | French: | ARCHITECTURE DE POINT DE DISTRIBUTION VIRTUEL | [2019/43] | Examination procedure | 07.04.2020 | Amendment by applicant (claims and/or description) | 27.05.2020 | Examination requested [2020/27] | 27.05.2020 | Date on which the examining division has become responsible | 25.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 29.06.2021 | Reply to a communication from the examining division | 06.04.2022 | Communication of intention to grant the patent | 28.07.2022 | Fee for grant paid | 28.07.2022 | Fee for publishing/printing paid | 28.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 08.06.2023 | No opposition filed within time limit [2023/33] | Fees paid | Renewal fee | 23.03.2021 | Renewal fee patent year 03 | 28.03.2022 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 13.03.2019 | HU | 13.03.2019 | AL | 07.09.2022 | AT | 07.09.2022 | BG | 07.09.2022 | CZ | 07.09.2022 | DK | 07.09.2022 | EE | 07.09.2022 | ES | 07.09.2022 | FI | 07.09.2022 | HR | 07.09.2022 | IT | 07.09.2022 | LT | 07.09.2022 | LV | 07.09.2022 | MC | 07.09.2022 | NL | 07.09.2022 | PL | 07.09.2022 | RO | 07.09.2022 | RS | 07.09.2022 | SE | 07.09.2022 | SI | 07.09.2022 | SK | 07.09.2022 | SM | 07.09.2022 | TR | 07.09.2022 | NO | 07.12.2022 | GR | 08.12.2022 | IS | 07.01.2023 | PT | 09.01.2023 | GB | 13.03.2023 | IE | 13.03.2023 | LU | 13.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | FR | 31.03.2023 | LI | 31.03.2023 | [2026/04] |
| Former [2025/39] | CY | 13.03.2019 | |
| HU | 13.03.2019 | ||
| AL | 07.09.2022 | ||
| AT | 07.09.2022 | ||
| BG | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| IT | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| GB | 13.03.2023 | ||
| IE | 13.03.2023 | ||
| LU | 13.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| FR | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| Former [2025/36] | CY | 13.03.2019 | |
| AL | 07.09.2022 | ||
| AT | 07.09.2022 | ||
| BG | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| IT | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| GB | 13.03.2023 | ||
| IE | 13.03.2023 | ||
| LU | 13.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| FR | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| Former [2024/51] | AL | 07.09.2022 | |
| AT | 07.09.2022 | ||
| BG | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| IT | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| GB | 13.03.2023 | ||
| IE | 13.03.2023 | ||
| LU | 13.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| FR | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| Former [2024/26] | AL | 07.09.2022 | |
| AT | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| IT | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| GB | 13.03.2023 | ||
| IE | 13.03.2023 | ||
| LU | 13.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| FR | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| Former [2024/11] | AL | 07.09.2022 | |
| AT | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| GB | 13.03.2023 | ||
| IE | 13.03.2023 | ||
| LU | 13.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| FR | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| Former [2024/09] | AL | 07.09.2022 | |
| AT | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| GB | 13.03.2023 | ||
| IE | 13.03.2023 | ||
| LU | 13.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| Former [2024/08] | AL | 07.09.2022 | |
| AT | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| GB | 13.03.2023 | ||
| IE | 13.03.2023 | ||
| LU | 13.03.2023 | ||
| Former [2024/02] | AL | 07.09.2022 | |
| AT | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| LU | 13.03.2023 | ||
| Former [2023/48] | AL | 07.09.2022 | |
| AT | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/37] | AL | 07.09.2022 | |
| AT | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/33] | AL | 07.09.2022 | |
| AT | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/30] | AL | 07.09.2022 | |
| AT | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/29] | AL | 07.09.2022 | |
| AT | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/26] | AT | 07.09.2022 | |
| CZ | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/23] | AT | 07.09.2022 | |
| CZ | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| PT | 09.01.2023 | ||
| Former [2023/22] | AT | 07.09.2022 | |
| CZ | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| PT | 09.01.2023 | ||
| Former [2023/20] | FI | 07.09.2022 | |
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| Former [2023/10] | FI | 07.09.2022 | |
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| Former [2023/09] | FI | 07.09.2022 | |
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| Former [2023/08] | FI | 07.09.2022 | |
| LT | 07.09.2022 | ||
| RS | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| NO | 07.12.2022 | Documents cited: | Search | [X] EP2852067 (ALCATEL LUCENT et al.) [X] 1-10 * paragraph [0016] - paragraph [0031] * * paragraph [0040] - paragraph [0061]; figure 2 * |