EP3546045 - VENTILATION DEVICE FOR FILTERING AIR AND FOR SEPARATING WATER AEROSOLS FROM AIR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.06.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 16.07.2021 | ||
Former | Grant of patent is intended Status updated on 30.03.2021 | ||
Former | Request for examination was made Status updated on 27.03.2020 | ||
Former | The application has been published Status updated on 30.08.2019 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Filtration Group GmbH Schleifbachweg 45 74613 Öhringen / DE | [2019/40] | Inventor(s) | 01 /
GORZAWSKI, Steffen Burgeckstr. 1 74906 Bad Rappenau / DE | 02 /
KUGEL, Wolfgang Steig 1 74549 Wolpertshausen / DE | 03 /
SZONTKOWSKI, Andreas Silcherstr. 1 74182 Obersulm / DE | 04 /
RÖDIGER, Fritz Hoffeldstraße 16 74257 Untereisesheim / DE | [2019/40] | Representative(s) | BRP Renaud & Partner mbB Rechtsanwälte Patentanwälte Steuerberater Königstraße 28 70173 Stuttgart / DE | [2019/40] | Application number, filing date | 19164449.1 | 21.03.2019 | [2019/40] | Priority number, date | DE201810204634 | 27.03.2018 Original published format: DE102018204634 | [2019/40] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3546045 | Date: | 02.10.2019 | Language: | DE | [2019/40] | Type: | B1 Patent specification | No.: | EP3546045 | Date: | 18.08.2021 | Language: | DE | [2021/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.07.2019 | Classification | IPC: | B01D35/30, B01D46/00, F02C7/00 | [2019/40] | CPC: |
B01D46/0005 (EP);
B01D35/303 (EP);
B01D46/58 (EP);
F02C7/00 (EP);
B01D2201/304 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/18] |
Former [2019/40] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BELÜFTUNGSEINRICHTUNG ZUM FILTERN VON LUFT UND ZUM ABSCHEIDEN VON WASSERAEROSOLEN AUS LUFT | [2019/40] | English: | VENTILATION DEVICE FOR FILTERING AIR AND FOR SEPARATING WATER AEROSOLS FROM AIR | [2019/40] | French: | DISPOSITIF D'AÉRATION PERMETTANT DE FILTRER L'AIR ET DE SÉPARER DES AÉROSOLS D'EAU À PARTIR DE L'AIR | [2019/40] | Examination procedure | 25.03.2020 | Amendment by applicant (claims and/or description) | 25.03.2020 | Examination requested [2020/18] | 25.03.2020 | Date on which the examining division has become responsible | 31.03.2021 | Communication of intention to grant the patent | 12.07.2021 | Fee for grant paid | 12.07.2021 | Fee for publishing/printing paid | 12.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 19.05.2022 | No opposition filed within time limit [2022/30] | Fees paid | Renewal fee | 29.03.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.03.2019 | AL | 18.08.2021 | CY | 18.08.2021 | CZ | 18.08.2021 | EE | 18.08.2021 | ES | 18.08.2021 | FI | 18.08.2021 | HR | 18.08.2021 | IT | 18.08.2021 | LT | 18.08.2021 | LV | 18.08.2021 | MC | 18.08.2021 | MK | 18.08.2021 | MT | 18.08.2021 | PL | 18.08.2021 | RO | 18.08.2021 | RS | 18.08.2021 | SE | 18.08.2021 | SI | 18.08.2021 | SK | 18.08.2021 | SM | 18.08.2021 | BG | 18.11.2021 | GR | 19.11.2021 | IS | 18.12.2021 | PT | 20.12.2021 | LU | 21.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | FR | 31.03.2022 | LI | 31.03.2022 | [2024/44] |
Former [2024/25] | HU | 21.03.2019 | |
AL | 18.08.2021 | ||
CY | 18.08.2021 | ||
CZ | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
MK | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
LU | 21.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/23] | AL | 18.08.2021 | |
CY | 18.08.2021 | ||
CZ | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
MK | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
LU | 21.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/20] | AL | 18.08.2021 | |
CY | 18.08.2021 | ||
CZ | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
LU | 21.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/10] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
LU | 21.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/09] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
LU | 21.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/08] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
LU | 21.03.2022 | ||
FR | 31.03.2022 | ||
Former [2023/06] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
FR | 31.03.2022 | ||
Former [2022/47] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/36] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/29] | AL | 18.08.2021 | |
CZ | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/25] | CZ | 18.08.2021 | |
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/24] | CZ | 18.08.2021 | |
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SK | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/10] | ES | 18.08.2021 | |
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
PL | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/09] | ES | 18.08.2021 | |
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
PT | 20.12.2021 | ||
Former [2022/08] | ES | 18.08.2021 | |
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | Documents cited: | Search | [A]DE29909495U (LTA LUFTTECHNIK GMBH [DE]) [A] 1-20* the whole document *; | [XAY]DE202006009355U (PFANNENBERG GMBH [DE]) [X] 1-4,7,10,17-20 * paragraphs [0018] , [ 0028]; figures 1-3,8; claims 1,2 * [A] 5,11 [Y] 6,8,9,12-16; | [Y]US2011154991 (STEELE RICHARD P [GB], et al) [Y] 6,8,9,12-16 * paragraphs [0014] - [0016] - [ 0022]; figures 1-4; claims 1,2,7 *; | [X]WO2015018230 (DONG YUQUAN [CN]) [X] 1,10 * paragraphs [0042] , [0045]; figures 1-9; claim 1 *; | [Y]US2016166955 (OSBORNE MICHAEL W [US], et al) [Y] 6,12-16 * column 3, lines 47-50 * * paragraph [0023]; figures 1-7 * |