blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3726715

EP3726715 - FAULT DETECTION IN HYBRID DC-DC POWER CONVERTERS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.07.2022
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  13.08.2021
FormerGrant of patent is intended
Status updated on  23.06.2021
FormerRequest for examination was made
Status updated on  23.04.2021
FormerThe application has been published
Status updated on  18.09.2020
Most recent event   Tooltip17.05.2024Lapse of the patent in a contracting state
New state(s): HU
published on 19.06.2024  [2024/25]
Applicant(s)For all designated states
NXP B.V.
High Tech Campus 60
5656 AG Eindhoven / NL
[2020/43]
Inventor(s)01 / ASHOURLOO, Mojtaba
c/o NXP B.V., Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
02 / NAMBURI, Venkata Raghuram
c/o NXP B.V., Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
03 / VILLAR PIQUE, Gerard
c/o NXP B.V., Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
04 / PIGOTT, John
c/o NXP B.V., Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
05 / TRESCASES, Olivier
c/o NXP B.V., Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
06 / BERGVELD, Hendrik
c/o NXP B.V., Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
07 / EL SHERIF, Alaa Eldin
c/o NXP B.V., Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
 [2020/43]
Representative(s)Hardingham, Christopher Mark
NXP Semiconductors
Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
[2020/43]
Application number, filing date19169160.915.04.2019
[2020/43]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3726715
Date:21.10.2020
Language:EN
[2020/43]
Type: B1 Patent specification 
No.:EP3726715
Date:15.09.2021
Language:EN
[2021/37]
Search report(s)(Supplementary) European search report - dispatched on:EP13.11.2019
ClassificationIPC:H02M3/07, H02M3/155, H02M1/32
[2020/43]
CPC:
H02M3/07 (EP); G01R31/40 (US); G01R31/56 (US);
H02M1/32 (EP); H02M3/155 (EP); H02M1/0095 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/21]
Former [2020/43]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:FEHLERERKENNUNG IN HYBRIDEN GLEICHSTROMWANDLERN[2020/43]
English:FAULT DETECTION IN HYBRID DC-DC POWER CONVERTERS[2020/43]
French:DÉTECTION DE DÉFAILLANCES DANS DES CONVERTISSEURS DE PUISSANCE CC-CC HYBRIDES[2020/43]
Examination procedure15.11.2019Amendment by applicant (claims and/or description)
21.04.2021Examination requested  [2021/21]
21.04.2021Date on which the examining division has become responsible
24.06.2021Communication of intention to grant the patent
06.08.2021Fee for grant paid
06.08.2021Fee for publishing/printing paid
06.08.2021Receipt of the translation of the claim(s)
Opposition(s)16.06.2022No opposition filed within time limit [2022/34]
Fees paidRenewal fee
30.04.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.04.2019
AL15.09.2021
AT15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
IE15.04.2022
LU15.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
[2024/25]
Former [2024/23]AL15.09.2021
AT15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
IE15.04.2022
LU15.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
Former [2024/20]AL15.09.2021
AT15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
IE15.04.2022
LU15.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
Former [2023/20]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
IE15.04.2022
LU15.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
Former [2023/10]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
LU15.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
Former [2023/09]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
LU15.04.2022
CH30.04.2022
LI30.04.2022
Former [2023/08]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
LU15.04.2022
Former [2023/06]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/36]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/29]AL15.09.2021
AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/25]AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/24]AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/23]AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
PL15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
PT17.01.2022
Former [2022/21]AT15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
Former [2022/10]FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
Former [2022/09]FI15.09.2021
LT15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/08]FI15.09.2021
LT15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/07]LT15.09.2021
NO15.12.2021
Documents cited:Search[A]US2016028302  (LOW AICHEN [US], et al) [A] 1-15 * paragraphs [0077] - [0083]; figure 5 ** paragraphs [0088] , [0 89]; figures 7, 8 *;
 [A]  - SEO GAB-SU ET AL, "A 95%-Efficient 48V-to-1V/10A VRM Hybrid Converter Using Interleaved Dual Inductors", 2018 IEEE ENERGY CONVERSION CONGRESS AND EXPOSITION (ECCE), IEEE, (20180923), doi:10.1109/ECCE.2018.8557715, pages 3825 - 3830, XP033463783 [A] 1-15 * figure 1 *

DOI:   http://dx.doi.org/10.1109/ECCE.2018.8557715
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.