EP3531421 - DIRECTED AUTO-REFRESH SYNCHRONIZATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.04.2023 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 29.04.2022 | ||
Former | Grant of patent is intended Status updated on 16.12.2021 | ||
Former | Request for examination was made Status updated on 06.03.2020 | ||
Former | The application has been published Status updated on 26.07.2019 | Most recent event Tooltip | 15.11.2024 | Change - lapse in a contracting state Updated state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states QUALCOMM Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2019/35] | Inventor(s) | 01 /
WALKER, Robert Michael Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA California 92121-1714 / US | 02 /
REMAKLUS, Perry Willmann, Jr Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA California 92121-1714 / US | [2019/35] | Representative(s) | Petzold, Silke, et al Maucher Jenkins Seventh Floor Offices Artillery House 11-19 Artillery Row London SW1P 1RT / GB | [2022/22] |
Former [2019/35] | Petzold, Silke, et al Maucher Jenkins 26 Caxton Street London SW1H 0RJ / GB | Application number, filing date | 19169318.3 | 23.12.2005 | [2019/35] | Priority number, date | US20040640100P | 28.12.2004 Original published format: US 640100 P | US20050115915 | 27.04.2005 Original published format: US 115915 | [2019/35] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3531421 | Date: | 28.08.2019 | Language: | EN | [2019/35] | Type: | B1 Patent specification | No.: | EP3531421 | Date: | 01.06.2022 | Language: | EN | [2022/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.07.2019 | Classification | IPC: | G11C11/406, G06F13/16 | [2019/35] | CPC: |
G06F13/1636 (EP,BR,US);
G11C11/406 (EP,BR,KR,US);
G11C11/401 (KR)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2020/15] |
Former [2019/35] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | GERICHTETE SYNCHRONISATION VON AUTO-AKTUALISIERUNGEN | [2019/35] | English: | DIRECTED AUTO-REFRESH SYNCHRONIZATION | [2019/35] | French: | SYNCHRONISATION À RAFRAICHISSEMENT AUTOMATIQUE DIRIGÉ | [2019/35] | Examination procedure | 28.02.2020 | Amendment by applicant (claims and/or description) | 28.02.2020 | Examination requested [2020/15] | 28.02.2020 | Date on which the examining division has become responsible | 17.12.2021 | Communication of intention to grant the patent | 22.04.2022 | Fee for grant paid | 22.04.2022 | Fee for publishing/printing paid | 22.04.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP05855572.3 / EP1839313 | Opposition(s) | 02.03.2023 | No opposition filed within time limit [2023/19] | Fees paid | Renewal fee | 15.04.2019 | Renewal fee patent year 03 | 15.04.2019 | Renewal fee patent year 04 | 15.04.2019 | Renewal fee patent year 05 | 15.04.2019 | Renewal fee patent year 06 | 15.04.2019 | Renewal fee patent year 07 | 15.04.2019 | Renewal fee patent year 08 | 15.04.2019 | Renewal fee patent year 09 | 15.04.2019 | Renewal fee patent year 10 | 15.04.2019 | Renewal fee patent year 11 | 15.04.2019 | Renewal fee patent year 12 | 15.04.2019 | Renewal fee patent year 13 | 15.04.2019 | Renewal fee patent year 14 | 10.12.2019 | Renewal fee patent year 15 | 09.12.2020 | Renewal fee patent year 16 | 16.12.2021 | Renewal fee patent year 17 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.12.2005 | AT | 01.06.2022 | BG | 01.06.2022 | CY | 01.06.2022 | CZ | 01.06.2022 | DK | 01.06.2022 | EE | 01.06.2022 | ES | 01.06.2022 | FI | 01.06.2022 | IT | 01.06.2022 | LT | 01.06.2022 | LV | 01.06.2022 | MC | 01.06.2022 | PL | 01.06.2022 | RO | 01.06.2022 | SE | 01.06.2022 | SI | 01.06.2022 | SK | 01.06.2022 | TR | 01.06.2022 | GR | 02.09.2022 | IS | 01.10.2022 | PT | 03.10.2022 | IE | 23.12.2022 | LU | 23.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | [2024/51] |
Former [2024/29] | HU | 23.12.2005 | |
AT | 01.06.2022 | ||
CY | 01.06.2022 | ||
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
IT | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
MC | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SI | 01.06.2022 | ||
SK | 01.06.2022 | ||
TR | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/21] | HU | 23.12.2005 | |
AT | 01.06.2022 | ||
CY | 01.06.2022 | ||
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
IT | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SI | 01.06.2022 | ||
SK | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/18] | HU | 23.12.2005 | |
AT | 01.06.2022 | ||
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
IT | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SI | 01.06.2022 | ||
SK | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/11] | AT | 01.06.2022 | |
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
IT | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SI | 01.06.2022 | ||
SK | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/49] | AT | 01.06.2022 | |
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SI | 01.06.2022 | ||
SK | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/48] | AT | 01.06.2022 | |
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SI | 01.06.2022 | ||
SK | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/47] | AT | 01.06.2022 | |
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SI | 01.06.2022 | ||
SK | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
LU | 23.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/38] | AT | 01.06.2022 | |
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SI | 01.06.2022 | ||
SK | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
LU | 23.12.2022 | ||
Former [2023/25] | AT | 01.06.2022 | |
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SI | 01.06.2022 | ||
SK | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
Former [2023/21] | AT | 01.06.2022 | |
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
Former [2023/12] | AT | 01.06.2022 | |
CZ | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
Former [2023/09] | AT | 01.06.2022 | |
CZ | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
PT | 03.10.2022 | ||
Former [2023/07] | AT | 01.06.2022 | |
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
SE | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
Former [2022/50] | ES | 01.06.2022 | |
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
SE | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
Former [2022/49] | ES | 01.06.2022 | |
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
SE | 01.06.2022 | ||
BG | 01.09.2022 | ||
GR | 02.09.2022 | ||
Former [2022/47] | ES | 01.06.2022 | |
FI | 01.06.2022 | ||
LT | 01.06.2022 | ||
SE | 01.06.2022 | Documents cited: | Search | [Y]WO9919879 (RAMBUS INC [US]) [Y] 4 * page 2, lines 17-31 * * page 10, lines 24-30 *; | [XY]US2003007406 (KYUNG KYE-HYUN [KR]) [X] 1-3,5-8 * the whole document * [Y] 4; | [A]US2004184337 (JAKOBS ANDREAS [DE]) [A] 1-8* the whole document * | by applicant | US20040640100 |