blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3540207

EP3540207 - NOISE ATTENUATION UNIT FOR ENGINE SYSTEMS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.08.2022
Database last updated on 12.07.2024
FormerThe patent has been granted
Status updated on  27.08.2021
FormerGrant of patent is intended
Status updated on  19.04.2021
FormerExamination is in progress
Status updated on  25.05.2020
FormerRequest for examination was made
Status updated on  20.03.2020
FormerThe application has been published
Status updated on  16.08.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Dayco IP Holdings, LLC
1650 Research Drive, Suite 200
Troy, MI 48083 / US
[2021/39]
Former [2019/38]For all designated states
Dayco IP Holdings, LLC
1650 Research Drive, Suite 200
Troy, MI 48083 / US
Inventor(s)01 / HAMPTON, Keith
415 Barton Drive
Ann Arbor, MI 48105 / US
02 / FLETCHER, David
1480 W. Reid Road
Flint, MI 48507 / US
03 / GRAICHEN, Brian M.
890 Garland Lane
Leonard, MI 48367 / US
04 / BRAVO, Rex
4944 32nd Street
Detroit, MI 48210 / US
 [2019/38]
Representative(s)Studio Torta S.p.A.
Via Viotti, 9
10121 Torino / IT
[2019/38]
Application number, filing date19169536.009.12.2014
[2019/38]
Priority number, dateUS201361913668P09.12.2013         Original published format: US 201361913668 P
US201461971008P27.03.2014         Original published format: US 201461971008 P
[2019/38]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3540207
Date:18.09.2019
Language:EN
[2019/38]
Type: B1 Patent specification 
No.:EP3540207
Date:29.09.2021
Language:EN
[2021/39]
Search report(s)(Supplementary) European search report - dispatched on:EP31.05.2019
ClassificationIPC:F02M35/12, F02M35/14, F02M35/10, F02M37/00, F16L55/027, F16L55/033, B60T17/00, B60T17/04, // B60T13/12, F02M25/06
[2019/38]
CPC:
F02M35/1272 (EP,KR,US); F02M35/1244 (KR,US); B60T17/008 (EP,US);
B60T17/043 (EP,US); F02M35/10118 (US); F02M35/10229 (EP,US);
F02M35/1211 (EP,KR,US); F02M37/0041 (EP,US); F16L55/02745 (EP,KR,US);
F16L55/0336 (EP,KR,US); F02M25/06 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/17]
Former [2019/38]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:GERÄUSCHDÄMPFUNGSEINHEIT FÜR MOTORSYSTEME[2019/38]
English:NOISE ATTENUATION UNIT FOR ENGINE SYSTEMS[2019/38]
French:UNITÉ D'ATTÉNUATION DE BRUIT POUR SYSTÈMES MOTEUR[2019/38]
Examination procedure18.03.2020Amendment by applicant (claims and/or description)
18.03.2020Examination requested  [2020/17]
18.03.2020Date on which the examining division has become responsible
28.05.2020Despatch of a communication from the examining division (Time limit: M04)
28.09.2020Reply to a communication from the examining division
20.04.2021Communication of intention to grant the patent
18.08.2021Fee for grant paid
18.08.2021Fee for publishing/printing paid
18.08.2021Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP14869909.3  / EP3090169
Opposition(s)30.06.2022No opposition filed within time limit [2022/36]
Fees paidRenewal fee
16.04.2019Renewal fee patent year 03
16.04.2019Renewal fee patent year 04
16.04.2019Renewal fee patent year 05
23.12.2019Renewal fee patent year 06
24.12.2020Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.12.2014
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
MK29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
SM29.09.2021
IE09.12.2021
LU09.12.2021
BG29.12.2021
GB29.12.2021
NO29.12.2021
GR30.12.2021
BE31.12.2021
CH31.12.2021
FR31.12.2021
LI31.12.2021
IS29.01.2022
PT31.01.2022
[2024/23]
Former [2023/33]HU09.12.2014
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
SM29.09.2021
IE09.12.2021
LU09.12.2021
BG29.12.2021
GB29.12.2021
NO29.12.2021
GR30.12.2021
BE31.12.2021
CH31.12.2021
FR31.12.2021
LI31.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/30]AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
IE09.12.2021
LU09.12.2021
BG29.12.2021
GB29.12.2021
NO29.12.2021
GR30.12.2021
BE31.12.2021
CH31.12.2021
FR31.12.2021
LI31.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/10]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
IE09.12.2021
LU09.12.2021
BG29.12.2021
GB29.12.2021
NO29.12.2021
GR30.12.2021
BE31.12.2021
CH31.12.2021
FR31.12.2021
LI31.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/03]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
IE09.12.2021
LU09.12.2021
BG29.12.2021
GB29.12.2021
NO29.12.2021
GR30.12.2021
BE31.12.2021
CH31.12.2021
FR31.12.2021
LI31.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/01]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
IE09.12.2021
LU09.12.2021
BG29.12.2021
GB29.12.2021
NO29.12.2021
GR30.12.2021
BE31.12.2021
FR31.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/48]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
IE09.12.2021
LU09.12.2021
BG29.12.2021
GB29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/47]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
LU09.12.2021
BG29.12.2021
GB29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/46]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
LU09.12.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/36]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/33]AL29.09.2021
AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/29]AL29.09.2021
AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/24]AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/23]AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
PL29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
PT31.01.2022
Former [2022/21]AT29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
Former [2022/10]FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
Former [2022/09]FI29.09.2021
LT29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
Former [2022/08]FI29.09.2021
LT29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
Former [2022/07]LT29.09.2021
NO29.12.2021
Documents cited:Search[XI]US2372587  (KRUEGER EMIL M) [X] 1,2,4,5,8,9 * figures 1-3 * * claims 4, 12 * * column 1, line 3 - line 19 * * column 2, line 30 - line 33 * * column 3, line 21 - line 55 * [I] 3,6,7,10;
 [XI]FR2055030  (DUNLOP CO LTD) [X] 1,2,5,7-9 * figures 1-6 * * claims 1-20 * * page 2 - page 8 * [I] 3,6,10;
 [XI]US3724502  (HAYNER P, et al) [X] 1,2,4 * abstract * * figures 1-5 * * column 1 - column 3 * [I] 3,6,7,10;
 [A]FR2319072  (ELECTRICITE DE FRANCE [FR]) [A] 1-10 * figure 1 * * page 1 - page 6 * * claims 1-12 *;
 [A]US6076557  (CARNEY THOMAS JAMES [US]) [A] 7-10 * abstract * * figures 10-19 * * column 3 * * column 8, line 31 - line 37 * * column 15 - column 16 *;
 [A]US2002139426  (KIPPE BRADLEY N [US], et al) [A] 3,10 * abstract * * figure 7 ** paragraph [0001] - paragraph [0005] *;
 [A]DE102008005987  (BOSCH GMBH ROBERT [DE]) [A] 7-10 * abstract * * figures 1-5 * * paragraph [0001] - paragraph [0009] * * paragraph [0016] - paragraph [0017] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.