EP3540207 - NOISE ATTENUATION UNIT FOR ENGINE SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.08.2022 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 27.08.2021 | ||
Former | Grant of patent is intended Status updated on 19.04.2021 | ||
Former | Examination is in progress Status updated on 25.05.2020 | ||
Former | Request for examination was made Status updated on 20.03.2020 | ||
Former | The application has been published Status updated on 16.08.2019 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Dayco IP Holdings, LLC 1650 Research Drive, Suite 200 Troy, MI 48083 / US | [2021/39] |
Former [2019/38] | For all designated states Dayco IP Holdings, LLC 1650 Research Drive, Suite 200 Troy, MI 48083 / US | Inventor(s) | 01 /
HAMPTON, Keith 415 Barton Drive Ann Arbor, MI 48105 / US | 02 /
FLETCHER, David 1480 W. Reid Road Flint, MI 48507 / US | 03 /
GRAICHEN, Brian M. 890 Garland Lane Leonard, MI 48367 / US | 04 /
BRAVO, Rex 4944 32nd Street Detroit, MI 48210 / US | [2019/38] | Representative(s) | Studio Torta S.p.A. Via Viotti, 9 10121 Torino / IT | [2019/38] | Application number, filing date | 19169536.0 | 09.12.2014 | [2019/38] | Priority number, date | US201361913668P | 09.12.2013 Original published format: US 201361913668 P | US201461971008P | 27.03.2014 Original published format: US 201461971008 P | [2019/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3540207 | Date: | 18.09.2019 | Language: | EN | [2019/38] | Type: | B1 Patent specification | No.: | EP3540207 | Date: | 29.09.2021 | Language: | EN | [2021/39] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 31.05.2019 | Classification | IPC: | F02M35/12, F02M35/14, F02M35/10, F02M37/00, F16L55/027, F16L55/033, B60T17/00, B60T17/04, // B60T13/12, F02M25/06 | [2019/38] | CPC: |
F02M35/1272 (EP,KR,US);
F02M35/1244 (KR,US);
B60T17/008 (EP,US);
B60T17/043 (EP,US);
F02M35/10118 (US);
F02M35/10229 (EP,US);
F02M35/1211 (EP,KR,US);
F02M37/0041 (EP,US);
F16L55/02745 (EP,KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/17] |
Former [2019/38] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | GERÄUSCHDÄMPFUNGSEINHEIT FÜR MOTORSYSTEME | [2019/38] | English: | NOISE ATTENUATION UNIT FOR ENGINE SYSTEMS | [2019/38] | French: | UNITÉ D'ATTÉNUATION DE BRUIT POUR SYSTÈMES MOTEUR | [2019/38] | Examination procedure | 18.03.2020 | Amendment by applicant (claims and/or description) | 18.03.2020 | Examination requested [2020/17] | 18.03.2020 | Date on which the examining division has become responsible | 28.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 28.09.2020 | Reply to a communication from the examining division | 20.04.2021 | Communication of intention to grant the patent | 18.08.2021 | Fee for grant paid | 18.08.2021 | Fee for publishing/printing paid | 18.08.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14869909.3 / EP3090169 | Opposition(s) | 30.06.2022 | No opposition filed within time limit [2022/36] | Fees paid | Renewal fee | 16.04.2019 | Renewal fee patent year 03 | 16.04.2019 | Renewal fee patent year 04 | 16.04.2019 | Renewal fee patent year 05 | 23.12.2019 | Renewal fee patent year 06 | 24.12.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.12.2014 | AL | 29.09.2021 | AT | 29.09.2021 | CY | 29.09.2021 | CZ | 29.09.2021 | DK | 29.09.2021 | EE | 29.09.2021 | ES | 29.09.2021 | FI | 29.09.2021 | HR | 29.09.2021 | IT | 29.09.2021 | LT | 29.09.2021 | LV | 29.09.2021 | MC | 29.09.2021 | MK | 29.09.2021 | NL | 29.09.2021 | PL | 29.09.2021 | RO | 29.09.2021 | RS | 29.09.2021 | SE | 29.09.2021 | SI | 29.09.2021 | SK | 29.09.2021 | SM | 29.09.2021 | IE | 09.12.2021 | LU | 09.12.2021 | BG | 29.12.2021 | GB | 29.12.2021 | NO | 29.12.2021 | GR | 30.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | FR | 31.12.2021 | LI | 31.12.2021 | IS | 29.01.2022 | PT | 31.01.2022 | [2024/23] |
Former [2023/33] | HU | 09.12.2014 | |
AL | 29.09.2021 | ||
AT | 29.09.2021 | ||
CY | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
SM | 29.09.2021 | ||
IE | 09.12.2021 | ||
LU | 09.12.2021 | ||
BG | 29.12.2021 | ||
GB | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/30] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CY | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
IE | 09.12.2021 | ||
LU | 09.12.2021 | ||
BG | 29.12.2021 | ||
GB | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/10] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
IE | 09.12.2021 | ||
LU | 09.12.2021 | ||
BG | 29.12.2021 | ||
GB | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/03] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
IE | 09.12.2021 | ||
LU | 09.12.2021 | ||
BG | 29.12.2021 | ||
GB | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/01] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
IE | 09.12.2021 | ||
LU | 09.12.2021 | ||
BG | 29.12.2021 | ||
GB | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
FR | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/48] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
IE | 09.12.2021 | ||
LU | 09.12.2021 | ||
BG | 29.12.2021 | ||
GB | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/47] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
LU | 09.12.2021 | ||
BG | 29.12.2021 | ||
GB | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/46] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
LU | 09.12.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/36] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/33] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/29] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/24] | AT | 29.09.2021 | |
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/23] | AT | 29.09.2021 | |
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
PL | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
PT | 31.01.2022 | ||
Former [2022/21] | AT | 29.09.2021 | |
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
Former [2022/10] | FI | 29.09.2021 | |
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
Former [2022/09] | FI | 29.09.2021 | |
LT | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
Former [2022/08] | FI | 29.09.2021 | |
LT | 29.09.2021 | ||
SE | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
Former [2022/07] | LT | 29.09.2021 | |
NO | 29.12.2021 | Documents cited: | Search | [XI]US2372587 (KRUEGER EMIL M) [X] 1,2,4,5,8,9 * figures 1-3 * * claims 4, 12 * * column 1, line 3 - line 19 * * column 2, line 30 - line 33 * * column 3, line 21 - line 55 * [I] 3,6,7,10; | [XI]FR2055030 (DUNLOP CO LTD) [X] 1,2,5,7-9 * figures 1-6 * * claims 1-20 * * page 2 - page 8 * [I] 3,6,10; | [XI]US3724502 (HAYNER P, et al) [X] 1,2,4 * abstract * * figures 1-5 * * column 1 - column 3 * [I] 3,6,7,10; | [A]FR2319072 (ELECTRICITE DE FRANCE [FR]) [A] 1-10 * figure 1 * * page 1 - page 6 * * claims 1-12 *; | [A]US6076557 (CARNEY THOMAS JAMES [US]) [A] 7-10 * abstract * * figures 10-19 * * column 3 * * column 8, line 31 - line 37 * * column 15 - column 16 *; | [A]US2002139426 (KIPPE BRADLEY N [US], et al) [A] 3,10 * abstract * * figure 7 ** paragraph [0001] - paragraph [0005] *; | [A]DE102008005987 (BOSCH GMBH ROBERT [DE]) [A] 7-10 * abstract * * figures 1-5 * * paragraph [0001] - paragraph [0009] * * paragraph [0016] - paragraph [0017] * |