blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3564075

EP3564075 - BUMPER WITH INTEGRATED MARKING CELL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.06.2021
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  10.07.2020
FormerGrant of patent is intended
Status updated on  23.04.2020
FormerExamination is in progress
Status updated on  21.06.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Airbus (S.A.S.)
2, Rond Point Emile Dewoitine
31700 Blagnac / FR
[2019/45]
Inventor(s)01 / FERRER, Guillaume
AIRBUS (S.A.S.)
2, rond-point Emile Dewoitine
31707 BLAGNAC Cedex / FR
02 / CHARLES, Julien
AIRBUS (S.A.S.)
2, rond-point Emile Dewoitine
31707 BLAGNAC Cedex / FR
 [2019/45]
Representative(s)Gicquel, Olivier Yves Gérard
Airbus Opérations (S.A.S)
XIF - M0101/1
316, route de Bayonne
31060 Toulouse Cedex / FR
[2019/45]
Application number, filing date19170357.819.04.2019
[2019/45]
Priority number, dateFR2018005384704.05.2018         Original published format: FR 1853847
[2019/45]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3564075
Date:06.11.2019
Language:FR
[2019/45]
Type: B1 Patent specification 
No.:EP3564075
Date:12.08.2020
Language:FR
[2020/33]
Search report(s)(Supplementary) European search report - dispatched on:EP12.06.2019
ClassificationIPC:B60R19/48, B62D41/00
[2019/45]
CPC:
B60R19/48 (EP,CN,US); B62D41/00 (EP,US); B60R19/20 (US);
B60R2019/1866 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/24]
Former [2019/45]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:STOSSFÄNGER MIT INTEGRIERTER MARKIERUNGSZELLE[2019/45]
English:BUMPER WITH INTEGRATED MARKING CELL[2019/45]
French:PARE-CHOCS A CELLULE DE MARQUAGE INTEGRÉE[2019/45]
Examination procedure23.04.2019Examination requested  [2019/45]
12.06.2019Date on which the examining division has become responsible
26.06.2019Despatch of a communication from the examining division (Time limit: M04)
10.10.2019Reply to a communication from the examining division
28.10.2019Despatch of a communication from the examining division (Time limit: M04)
24.02.2020Reply to a communication from the examining division
24.04.2020Communication of intention to grant the patent
02.07.2020Fee for grant paid
02.07.2020Fee for publishing/printing paid
02.07.2020Receipt of the translation of the claim(s)
Opposition(s)14.05.2021No opposition filed within time limit [2021/29]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.04.2019
AL12.08.2020
AT12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
MK12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
IE19.04.2021
LU19.04.2021
BE30.04.2021
[2024/23]
Former [2023/41]HU19.04.2019
AL12.08.2020
AT12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
IE19.04.2021
LU19.04.2021
BE30.04.2021
Former [2023/33]HU19.04.2019
AL12.08.2020
AT12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
IE19.04.2021
LU19.04.2021
BE30.04.2021
Former [2023/30]AL12.08.2020
AT12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
IE19.04.2021
LU19.04.2021
BE30.04.2021
Former [2023/20]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
IE19.04.2021
LU19.04.2021
BE30.04.2021
Former [2022/34]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE19.04.2021
LU19.04.2021
BE30.04.2021
Former [2022/23]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE19.04.2021
LU19.04.2021
Former [2022/21]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IE19.04.2021
LU19.04.2021
Former [2022/10]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
LU19.04.2021
Former [2022/04]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
LU19.04.2021
Former [2021/50]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/34]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/28]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/25]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/23]AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/22]CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/21]DK12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/12]FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/10]FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/09]FI12.08.2020
LT12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
Former [2021/08]FI12.08.2020
LT12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
Former [2021/07]FI12.08.2020
LT12.08.2020
NO12.11.2020
Documents cited:Search[A]US2646016  (VERN WILSON LOYAL) [A] 1,10 * column 1, line 40 - column 2, line 46; figure - *;
 [Y]GB1218046  (TAYLOR JOHN MICHAEL [US], et al) [Y] 1,3-10 * page 1, line 98 - page 4, line 117; figure - *;
 [A]JPH0280467  (MATSURA CHIEO, et al) [A] 1,10* abstract *;
 [A]WO0051875  (HAN SANG KWAN [KR]) [A] 1,10 * page 3, line 23 - page 6, line 15; figure - *;
 [Y]US2013197717  (FRASER SPENCER [CA], et al) [Y] 1,3-10 * paragraph [0034] - paragraph [0070]; figure - *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.