EP3536602 - SPOILER FOR AN AIRCRAFT AND ASSOCIATED METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.07.2022 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 13.08.2021 | ||
Former | Grant of patent is intended Status updated on 14.04.2021 | ||
Former | Examination is in progress Status updated on 16.10.2020 | ||
Former | Request for examination was made Status updated on 17.01.2020 | ||
Former | The application has been published Status updated on 09.08.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Airbus Operations GmbH Kreetslag 10 21129 Hamburg / DE | [2019/37] | Inventor(s) | 01 /
SEACK, Oliver c/o Airbus Operations GmbH Kreetslag 10 21129 Hamburg / DE | [2019/37] | Representative(s) | Isarpatent Patent- und Rechtsanwälte Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | [2021/37] |
Former [2019/37] | Isarpatent Patent- und Rechtsanwälte Behnisch Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | Application number, filing date | 19170732.2 | 16.10.2014 | [2019/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3536602 | Date: | 11.09.2019 | Language: | EN | [2019/37] | Type: | B1 Patent specification | No.: | EP3536602 | Date: | 15.09.2021 | Language: | EN | [2021/37] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.06.2019 | Classification | IPC: | B64C1/12, B64C1/10, B64C3/22 | [2019/37] | CPC: |
B64C1/10 (EP,US);
B32B7/00 (RU);
B64C1/064 (EP,RU,US);
B64C1/12 (EP,US);
B64C3/20 (RU);
B64C3/22 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/08] |
Former [2019/37] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | PLATTENSTRUKTUR UND ZUGEHÖRIGES VERFAHREN | [2021/37] | English: | SPOILER FOR AN AIRCRAFT AND ASSOCIATED METHOD | [2019/37] | French: | STRUCTURE DE PANNEAU ET PROCÉDÉ ASSOCIÉ | [2021/37] |
Former [2019/37] | SPOILER FÜR EIN FLUGZEUG UND ZUGEHÖRIGES VERFAHREN | ||
Former [2019/37] | DÉFLECTEUR POUR AÉRONEF ET PROCÉDÉ ASSOCIÉ | Examination procedure | 14.01.2020 | Amendment by applicant (claims and/or description) | 14.01.2020 | Examination requested [2020/08] | 14.01.2020 | Date on which the examining division has become responsible | 20.10.2020 | Despatch of a communication from the examining division (Time limit: M04) | 19.02.2021 | Reply to a communication from the examining division | 15.04.2021 | Communication of intention to grant the patent | 06.08.2021 | Fee for grant paid | 06.08.2021 | Fee for publishing/printing paid | 06.08.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14189185.3 / EP3009344 | Opposition(s) | 16.06.2022 | No opposition filed within time limit [2022/34] | Fees paid | Renewal fee | 24.04.2019 | Renewal fee patent year 03 | 24.04.2019 | Renewal fee patent year 04 | 24.04.2019 | Renewal fee patent year 05 | 25.10.2019 | Renewal fee patent year 06 | 23.10.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.10.2014 | AL | 15.09.2021 | CY | 15.09.2021 | CZ | 15.09.2021 | DK | 15.09.2021 | EE | 15.09.2021 | FI | 15.09.2021 | HR | 15.09.2021 | IT | 15.09.2021 | LT | 15.09.2021 | LV | 15.09.2021 | MC | 15.09.2021 | MK | 15.09.2021 | MT | 15.09.2021 | NL | 15.09.2021 | PL | 15.09.2021 | RO | 15.09.2021 | RS | 15.09.2021 | SE | 15.09.2021 | SI | 15.09.2021 | SK | 15.09.2021 | SM | 15.09.2021 | IE | 16.10.2021 | LU | 16.10.2021 | BE | 31.10.2021 | CH | 31.10.2021 | LI | 31.10.2021 | FR | 15.11.2021 | BG | 15.12.2021 | NO | 15.12.2021 | GR | 16.12.2021 | IS | 15.01.2022 | PT | 17.01.2022 | [2024/42] |
Former [2024/23] | HU | 16.10.2014 | |
AL | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
MK | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 16.10.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
FR | 15.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/33] | HU | 16.10.2014 | |
AL | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 16.10.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
FR | 15.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/30] | AL | 15.09.2021 | |
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 16.10.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
FR | 15.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/10] | AL | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 16.10.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
FR | 15.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/01] | AL | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 16.10.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
FR | 15.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/48] | AL | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 16.10.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/37] | AL | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/36] | AL | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/35] | AL | 15.09.2021 | |
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
LU | 16.10.2021 | ||
BE | 31.10.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/33] | AL | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BE | 31.10.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/29] | AL | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/25] | CZ | 15.09.2021 | |
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/24] | CZ | 15.09.2021 | |
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/23] | CZ | 15.09.2021 | |
EE | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
PL | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
PT | 17.01.2022 | ||
Former [2022/10] | FI | 15.09.2021 | |
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
Former [2022/09] | FI | 15.09.2021 | |
LT | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
Former [2022/08] | FI | 15.09.2021 | |
LT | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
Former [2022/07] | LT | 15.09.2021 | |
NO | 15.12.2021 | Documents cited: | Search | [A]US4086378 (KAM CLIFFORD Y, et al); | [A]DE3844080 (MESSERSCHMITT BOELKOW BLOHM [DE]); | [XYI]US2002100840 (BILLINGER WOLFGANG [AT], et al); | [YA]WO2010082047 (AIRBUS OPERATIONS LTD [GB], et al); | [A]US2012245862 (COUDOUENT GERARD [FR], et al); | [YA]WO2012131327 (BAE SYSTEMS PLC [GB], et al); | [E]EP3309059 (BOEING CO [US]) | by applicant | WO2010082047 |